Influence on efficiency. Questions Ideal weather The work with most influences of weather How much of the total work The influences in percent to the efficiency Rain: when it start to raining Cold: when the temperature goes under zero Warm: when the temperature is getting wormer

Download Presentation

Influence on efficiency

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Influence on efficiency

Influence on efficiency

Questions

Ideal weather

The work with most influences of weather

How much of the total work

The influences in percent to the efficiency

Rain: when it start to raining

Cold: when the temperature goes under zero

Warm: when the temperature is getting wormer

Snow: when start to snow

Wind: start to blow

Wind and rain: when both blowing and raining

Wind and snow: when both blowing and snowing

Wind and cold: when both blowing and cold


Sheet metal workers 80 persons at a conference from whole sweden

Sheet metal workers80 persons at a conference (from whole Sweden)

  • Ideal weather: 15o, no wind

  • Worst work: sheet metal work on roofs

  • 20% of the total work

  • Rain: 30-100% (Impossible to walk on the roof)

  • Cold: 30-100% (Some material need at least 5o)

  • Warm: no big problem (?)

  • Snow: 50-100% (Like rain + take away snow)

  • Wind: 50-100% (Sheets blow away - some work e.g. window on backside no influence)

  • Wind and snow, wind and rain, wind and cold: 100%


Electricians 2 persons 60 and 30 years old

Electricians2 persons 60 and 30 years old

  • Ideal weather: 15o, no wind

  • Worst work: put cables together outdoors, construction

  • 5% of the total work

  • Rain: 15%

  • Cold: 15% (Some cables need at least 0o - gets hard)

  • Warm: no big problem

  • Snow: 25% (Like rain + take away snow)

  • Wind: 15%

  • Wind and rain: 25%

  • Wind and snow: 25%

  • Wind and cold: 15%


Electrician 1 persons 35 years old

Electrician1 persons 35 years old

  • Ideal weather: 15o, no wind

  • Worst work: put cables together outdoors, streets

  • >50% of the total work

  • Rain: 0%

  • Cold: >25% (Cables needs at least 0o -gets hard – can not be handled)

  • Warm: no big problem

  • Snow: 0%

  • Wind: 15%


Bridge work 4persons about 55 years old

Bridge work4persons about 55 years old

  • Ideal weather: 10-15o, no wind

  • Worst work: formwork, moulding

  • 80% of the total work

  • Rain: 15%

  • Cold: 100% (Moulding below 5o not possible)

  • Warm: no big problem

  • Snow: 50% (Have to erase snow from formwork)

  • Wind: 0-20% (At strong wind can it be impossible to lift the formwork)

  • Wind and rain: 15-50%

  • Wind and snow: 50-100%

  • Wind and cold: 100% (Moulding not possible)


Woodworkers and their supervisors 4 woodworkers 29 45 2 supervisors 55 60

Woodworkers and their supervisors4 woodworkers 29-45, 2 supervisors 55-60

  • Ideal weather: 10-15o, no wind, no sun

  • Worst work: nailing the wood parts of the roof construction

  • 5-10% of the total work

  • Rain: 100% (Not possible to lay wood roof, do other work and loos 10-15%)

  • Cold: 0% (Down to -10o no influence)

  • Warm: <20o no influence, >25 10-25% influence)

  • Dry snow: 20% (I easy to take away)

  • Wet snow: 100% (Have to clean the roof from snow)

  • Wind: 0-20% (Takes it easy, can not lay paper)

  • Wind and rain: 100% (Do other jobs if possible)

  • Wind and snow: 100%

  • Wind and cold: 100% (-5o feels like -25o)

    To move to an other work leads to decrease of efficiency of between 10-15%


Woodworkers 2 persons

Woodworkers 2 persons

  • Ideal weather: 10-15o, no wind, no sun

  • Worst work: erecting roof beams

  • 5-10% of the total work

  • Rain: 5% (Depends to the level of raining)

  • Cold: 0% (Down to -15o no influence, lower 5%)

  • Warm: <25o no influence, >25 5% influence)

  • Dry snow: 5% (I easy to take away)

  • Wet snow: 20-25%

  • Wind: 100% (>10 m/s not possible to lift roof beams, great risks)

  • Wind and rain: 100% (See wind but worse)

  • Wind and snow: 100% (See wind but worse)

  • Wind and cold: 100%(See wind but worse)

    To move to an other work leads to decrease of efficiency of between 10-15%