An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES

  2. STATE-WISE INSTALLED CAPACITY OF CAPTIVE PLANTS (1 MW & ABOVE) MW

  3. STATE-WISE ELECTRICITY GENERATED BY CAPTIVE PLANTS (1 MW & ABOVE) GWh

  4. STATE-WISE ELECTRICITY GENERATED BY CAPTIVE PLANTS (1 MW & ABOVE) LOAD FACTOR IN %

  5. List of CPPs along with MW quantum applied for STOA and approved

  6. List of CPPs along with MW quantum supplying power to grid in AP

  7. CPP RELATED REGULATIONS IN SOUTHERN REGION STATES

  8. CPP’s IN TAMIL NADU • OPERATIONAL PLANTS WITH CAPACITY OF MORE THAN 10 MW EACH 600 MW • CAPACITY CONNECTED TO TN GRID 180 MW • ENERGY SALE DURING 2004-05 648 MU • AVERAGE RATE Rs.2.90/UNIT • SALE OF ENERGY ENERGY GENERATED BY A CPP IN TAMILNADU • CAN BE USED BY THE OWNER • CAN BE USED BY THE SISTER CONCERN • BALANCE CAN BE SOLD TO TNEB • THIRD PARTY SALE IS NOT PERMITTED

  9. CPP’s IN TAMIL NADUContd… • BANKING • BANKING PERIOD IS 1ST OCTOBER TO NEXT 30TH SEPTEMBER • BANKED ENERGY CAN BE DRAWN DURING BANKING PERIOD IN SUCCEEDING YEAR • BANKING CHARGES TO TNEB WILL BE 2% IN TERMS OF ENERGY • WHEELING • WHEELING CHARGES ARE TO BE 15% IN TERMS OF ENEGY WHEELED IRRESPECTIVE OF VOLTAGE AND DISTANCE

  10. CPP’s IN TAMIL NADUContd… • PRICING OF CAPTIVE POWER THROUGH AGREEMENT • PRICING IS SINGLE PART TARIFF – NORMAL RATE FOR FIRM POWER • PRICING FOR INFIRM POWER TO BE 75% OF NORMAL RATE • NORMAL RATE STARTING FROM THE YEAR 1998-99 TO BE RS.2.25/UNIT WITH ESCALATION AT THE RATE OF 5% EVERY YEAR, TO BE APPLICABLE FOR NEXT 5 YEARS • PRICING OF CAPTIVE POWER THROUGH UI • FLOOR RATE RS.2.10/UNIT (CORRESPONDING TO FREQUENCY 49.8 Hz) • CEILING RATE RS.3.45/UNIT (CORRESPONDING TO FREQUENCY 49.5 Hz) • COMMISSION TO REVISIT THE ISSUE IN 3 YEARS OR AS AND WHEN UI RATES ARE REVISED

  11. CPP’s IN KARNATAKA • APPROX. CAPACITY IN USE 800 MW • 54% ON DIESEL, 21% ON FUEL OIL • CAPACITY UTILISED BY GRID 63 MW • SALE TO GRID • IN CASE OF COMPETITIVE BIDDING ROUTE/CEILING PRICE RS.2.87/UNIT • IN CASE OF NON COMPETITIVE BIDDING PRICES ARE TO BE ADOPTED BASED ON UI RATES • BANKING • NO BANKING FACILITY IS AVAILABLE • METERING • 15 MINUTES BLOCK METERS TO BE INSTALLED BY THE CONCERNED LICENCEES

  12. CPP’s IN ANDHRA PRADESH • CAPACITY UTILISED BY GRID AROUND 100 MW • SALE TO GRID • RATES TO BE DECIDED ON THE BASIS OF LONG TERM AGREEMENTS • BANKING • NO BANKING FACILITY IS AVAILABLE OTHER THAN WIND/MINI HYDEL • METERING • 15 MINUTES BLOCK METERS TO BE INSTALLED BY THE CONCERNED LICENCEES

  13. CPP’s IN KERALA • SALE TO GRID • PLANT SHALL ENSURE TO DISPATCH ELECTRICITY AS PER SCHEDULE • UI SHALL NOT EXCEED 10% OF TOTAL DISPATCH IN A DAY • UI SHALL NOT EXCEED 5% OF TOTAL DISPATCH DURING PEAK • OPEN ACCESS • PLANT CAN SEEK OPEN ACCESS AND SHALL BE ALLOWED NON-DISCRIMENATORY ACCESS SUBJECT TO AVAILABILITY OF CORRIDOR

  14. CPP’s IN KERALAContd… • TRANSMISSION AND WHEELING CHARGES FOR NCE PLANTS • TRANSMISSION CHARGES – 3% OF WHEELED ENERGY • WHEELING CHARGES – 5% OF WHEELED • OTHER PLANTS TO PAY THESE CHARGES AS DETERMINED BY COMMISSION UNDER OPEN ACCESS ACT • CPP WILL NOT BE LIABLE TO PAY SURCHARGE IN ADDITION TO CHARGES FOR TRANSMISSION AND WHEELING IN CASE OF HIS OWN USE • SUBJECT TO TECHNICAL FEASIBILITY THE CPP MAY BE REQUIRED TO EXTEND POWER TO UTILITY’S SYSTEM IN THE EVENT OF EMERGENCY SITUATION.

  15. STATE-WISE INSTALLED CAPACITY OF CAPTIVE PLANTS (1 MW & ABOVE)