1 / 6

A few items for the round -table

A few items for the round -table. B. Jeanneret CERN/ABP WG6 at IWLC_2010. The way to produce these beams. Why make it so complicated ?. 292 -----. Beam production. Gun must produce n = 2922×24×50 = 3.5×10 6 bunches /s ( current I = 4A )

Download Presentation

A few items for the round -table

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A few items for the round-table B. Jeanneret CERN/ABP WG6 at IWLC_2010

  2. The way to producethesebeams • Whymakeitsocomplicated ? 292 -----

  3. Beam production • Gun must producen = 2922×24×50 = 3.5×106bunches/s (current I = 4A) • Must alternate trains withodd/evenbunches • Odd/evenbunch structure must be programmable inside the rise-timeperiod (Olexsiy) • Timing tolerance for the beamat the entrance of the DB Linac: • Δφ1 = 0.1°@1GHz ⇔ 85 μm ⇔ 0.3 ps • Timing at 12 GHZ (synchonisation DB/MB & MB e+/e-) : • Δφ2 = 0.2°@12GHz ⇔ 14 μm ⇔ 0.46 fs (46 × 10-15 s) • As for the DB Linacitself , in the segment before compression: • Gradient : ΔG/G < 2×10-3coherent over 100 klystrons, < 2×10-2 per klystron • Phase : Δφ = 0.05° to avoidunduebunchlenghtening (A. Aksoy, D. Schulte) CTF3 with pulse compression: Δφ∼ 10-50° along train What do weprove for CLIC Δφ? Can a thermo-ionic gun, followed by a bunching System, do this ? Will a reliable laser gun exist ? Whatcan CTF3 tell us about this ? Will itgive us a proof of principle ?

  4. Options for Dipoles & Vacuum vs. SR • Super-conductingsuper-ferricmagnets • s.ccoils, but classicalC-yoke for fieldshaping • More expensive, but power ÷5 • Costsavingswith time • Cold pipe (∼20-30K)  Thermal expansion vanishes • Another vacuum regime to study • Classicalresistivemagnets • Berylium pipe atSR-impact • Transparent to 6 KeVX-rays • SR absorbed in water behind • Be disliked for safetyreasons ⇔negotiable ? Ageingsolved

  5. Operability RF deflector Kicker RF kicker (phase synchro) • Total longestpath for a train : 29 km • Through : • 820 klystrons • 14 RF deflectors • 3 Kickers • 5 compression chicanes • 1 RF kicker • 2 loops • 2 rings, severalturns 24 times • The 24 trains • must Survive with: • Beamlosses < 10-3 • Bunchlenghtening < few % • δz ∼ 10 μm Klystrons : 80 740 DB linac ∼20 km

  6. Future (post-CDR) • Manyoustanding issues to beworked-out • Can CTF3 validate the requirements for the CLIC Drive Beam ? • If not, what do weneed to do so Myworries : Mismatchbetweenwork to do & manpower • Activityscattered in toomany ‘sub-projects’ Will wereducethis in 2011 ?

More Related