Collaboration Business. Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Collaboration Duke University, Durham, NC May 20, 2008. Outline. Changes at LANL Highlights of the reworked WBS Budgetary information An August agency review?

Download Presentation

Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Martin cooper los alamos co spokesperson for the edm project for presentation to

Collaboration Business

Martin Cooper, Los Alamos

Co-spokesperson for the EDM Project

for presentation to

The nEDM Collaboration

Duke University, Durham, NC

May 20, 2008


Outline

Outline

  • Changes at LANL

  • Highlights of the reworked WBS

  • Budgetary information

  • An August agency review?

  • Preliminary engineering review

  • The next collaboration meeting


He actually does something besides push paper

He actually does something besides push paper


My apprenticeship as a technician is going well

My apprenticeship as a technician is going well


Jan thanks for putting in leg holes

Jan, thanks for putting in leg holes


Drill man is that a superhero

“Drill Man” – Is that a superhero?


Changes at lanl

Changes at LANL

  • Mark Makela – New staff

  • Christopher Mauger - New staff

  • Raul Hennings-Yeoman – New postdoc

  • Another postdoc offer on the street

  • A personal matter


Highlights of the reworked wbs

Highlights of the Reworked WBS

  • Job is not finished yet, so any release is unofficial

  • Inter-subsystem links simplified

  • Format of most subsystems approved by the project office and consistent

  • Project is likely stretched out once the funding constraints are incorporated

  • There are about 300 fewer activities, i.e. reduced by 500 and increased by 200

  • It will be the starting point for the schedule that will be baselined at CD-2


Institutional costs needed

Institutional Costs Needed

  • The PI at each institution will need to provide the cost information for labor and procurements, i.e. their business model

  • Martin wants formulae for every relevant case


Lanl business model examples

LANL Business Model Examples

Total cost= (1+G&A1)*(1+NMGRT)*(1+Over1+Over2)*SLR(salary)

where

G&A1 = General and Administrative for operations

NMGRT = New Mexico Gross Receipts Tax

Over1 = Internal overhead for management

Over2 = Nuclear physics program tax

SLR(salary) = Standard labor rate that includes salary and fringe benefits from a table

Total productive hours in a work year based on a 5 day work week

------------------------------

Total cost= (1+G&A2)*(1+NMGRT)*Catalog_Price

where

G&A2 = General and Administrative for capital procurements


The path to cd 2 cd 3a

The Path to CD-2/CD-3A


Budgetary information

Budgetary Information


Ce budget profiles k

CE Budget Profiles ($k)


An august agency review

An August Agency Review?

  • Martin considers an August Agency Review as the best way to keep us from passing the CD-2/3a readiness review in December

  • The agencies have not repeated the request, and Martin is keeping his head down

  • It will all depend on what we hear the rest of today and what the executive committee recommends


An august agency review1

An August Agency Review?

  • Funding agencies will decide in the Spring (late April?) whether to hold an August review depending on what I report on R&D progress

  • A guess at what evidence will satisfy them

    • 3He relaxation time at Duke/NCSU taking data

    • 3He relaxation time at Illinois taking data

    • Light collection with preliminary results

    • 3He transport calculations show practicality of the multi-temperature scheme – an experimental design if necessary

    • HV at 500 mK taking data

    • 4He evaporative purification taking data

    • 3He injection prepared (waiting) for dual-use cryostat

    • Full valve test taking data


Llp preliminary engineering review

LLP Preliminary Engineering Review

  • The charge and general organization was set out by Martin at the last collaboration meeting

  • June 30, 2008 at ORNL

  • Committee and agenda should be finalized on Thursday

  • Vince is working on the logistics


Review of the fnpb ucn building

Review of the FNPB-UCN Building

  • 30% Design Review was held at ORNL on March 17, 2008

  • Our suggestions are being take into account

  • 90% Design Review is coming on June 2, 2008

  • Visit to ORNL was also used to brief the ORNL safety people who will participate in our LLP preliminary design review


Status of dispersing funds

Status of Dispersing Funds

  • About 15 actions since February

  • Complicated by the NSFDOE transfer

  • Only one waiting on nEDM collaborators

  • About half of the contracts have been awarded and only a few are very far away

  • LANL and university procurement officers are about equally guilty for the long delays

  • Martin does not quite have the latest, but I can discuss the status of each action with the PI’s

  • Martin will make one more attempt to streamline the process


The next collaboration meetings

The Next Collaboration Meetings

  • August

    • In the beginning of the CD-2 readiness-review push

    • Simon Fraser if there is no August review or LANL if there is an August Review and rehearsals are needed – Martin will contact Mike Hayden

  • November or December

    • Prior to the CD-2 readiness review if we go forward

    • Either at LANL or at a Washington, DC area hotel depending on the funding agencies if we go forward

    • If in Washington, a local organizer will be needed

    • Rehearsals will be needed

    • Collaboration should want to hear the plans and results


Engineering and safety reviews

Engineering and Safety Reviews

  • Preliminary engineering review of FNPB-UCN building in early April combined with briefing of ORNL safety people

  • Preliminary design review of the main cryostat in ~June

  • Final design review of the main cryostat ~September

  • Preliminary design review of full project ~September


Engineering and safety reviews1

Engineering and Safety Reviews

  • P-Cryogenics – 4 h in June

  • F-Cryogenics – 4 h

  • P-Beam/Shielding – 2 h

  • P-3He services – 4 h

  • P-Central detector – 4 h

  • P-Magnets – 4 h

  • P-Computing/electronics – 2 h

  • P-Infrastructure – 2 h

  • i.e. 3-4 days at ORNL in September


Engineering and safety reviews2

Engineering and Safety Reviews

Committee

Paul Huffman (chair)

Martin Cooper (ex-officio)

Steve Lamoreaux

Vince Cianciolo

JLab specialist in cryogenics

2 engineers from subsystems not being reviewed (rotating)

A very experienced machinist from … (ORNL?)

ORNL safety people

1-2 collaboration volunteers optional

A written report from the committee is necessary

Jan sets the agenda with advice from Martin and Paul

Possible talks by subsystem managers, work package leaders, and design engineers


Engineering and safety reviews3

Engineering and Safety Reviews

Material to be covered

Specifications and goals

A breakdown of the subsystem into subassemblies

Assembly drawings of all subassemblies (the model)

Finite element analyses where appropriate

Other simulations where appropriate to back up specs

Heat transfer and dissipation where appropriate

Justification of tolerances

Compatibility with neighboring parts

Compatibility with other subsystems

Accounting for CTE’s of dissimilar materials were needed

Meeting materials specs for n-activation, n-absorption, n- and 3He-depolarization, magnetism, electrical conductivity, etc.

Safety issues

Value engineering (cost minimization)

Assembly scenarios

Required tests

Service and repair scenarios