Experience in manufacturing products of similar nature.

Experience in manufacturing products of similar nature. Understanding of scope of work to manufacture the TMT Actuator. Plan to procure required raw material and the electro-mechanical items. Manufacturing methodology and brief about required facilities. Assembly Procedure

Download Presentation

Experience in manufacturing products of similar nature.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Experience in manufacturing products of similar nature. Understanding of scope of work to manufacture the TMT Actuator. Plan to procure required raw material and the electro-mechanical items. Manufacturing methodology and brief about required facilities. Assembly Procedure Testing and Packaging. Quality Control and Assurance. Requirement to sub-contract part of work if any. Detailed Schedule (procurement, manufacturing, assembling, testing etc.) A tentative plan for the mass production of actuator.

  2. CNC RUNOUT MEASURING MACHINE

  3. Drive System For A Radio Telescope • Machine: Automatic drive system for a radio telescope • Description: An automatic drive system consisting of motor and gear assemblies to position the radio telescope at the required position, lock to the position and gradually position itself with reference to the earth rotation • Customer: • M/s RAMAN Research Institute, • Bangalore

  4. 3. Understanding of scope of work to manufacture the TMT Actuator. Scope of work • Purchase of raw materials for 03 nos of actuators and 10 nos of bought out items • Initiate Manufacturing Assembly and testing of 02 nos right handed prototype actuators Plus one set of custom manufactured parts • Assemble and testing of two prototype actuators and dispatch to IIAP for validation • 3 to 10 Nos proto will be manufactured after clearance from IIAP PS

  5. Responsibility • We are aware of the importance of the Professionalism and efforts gone in engineering this project • We appreciate the work influencing environment and final deployment with accuracy • Strict adherence specification Raw materials and chemical composition and bought out items • Geometric Dimension and tolerencing (GD & T)such as Machining, surface finish as per part drawings. • In selection of various bought out items and its impact of each variable on the final assembly product • We carry out the tolerance analysis for minimum and maximum conditions

  6. Activities • Studied the part drawings, Assembly drawings, Material composition, bought out items electrical, electronics and instrumentation that goes into assemblage • Identified the basic raw material that are requested for procurement for casting as well bought out sources and test equipment and tools

  7. PROCESS PLANNING • JIGS & FIXTURES required for this project are of general purpose,  which we are in possession; however any minor changes needed to be incorporated will be taken care of in the jigs & fixtures. As we are planning to carry out all the machining on CNC's, there is no requirement of special jigs and fixtures. Also the tooling's are of general purpose in nature, but for couple of items, special tooling’s are required, which we can modify from general purpose tooling. • We have in house CNC vertical machining centers four numbers, CNC horizontal machining centers four numbers, CNC turning & mill centers two numbers & CNC jig boring two numbers. And we can accommodate all the components in our machining capability itself. • We have our own process planning department and would be writing the Process planning during execution. From the preliminary study we have assessed the required process planning and falls well within general processing of our in house and vendors.  Generally they fall into: • Material selection and procurement of raw material.  Machining and heat or solution treatment  of the item followed by finish operation and coating. • Quality inspection of the parts at every stage of manufacturing

  8. CONTD….. MATERIAL SELECTION • All the materials will be selected as per the BOM from the reputed sources and checked for its composition and quality. MACHINING • All the parts will be fabricated and machined as per the detailed part drawing. Detailed process plan and tool plan would be written before execution INSPECTION • We will carry out inspection at every stage. • We will maintain record of events at every critical stage and similarly we  would  develop & establish the entire process of manufacturing, testing of various products of critical importance.

  9. In Line With Assembly and Testing We are confident of • importing or localizing the items as per the BOM • Assembling as per the procedural document and meeting physical parameters and kinematics /kinetics of the whole assemblage • Validate as per test document. • Carryout measurements in CMM • To measure Cp (Process capability and Cpk (Process capability index) SQC (statistical Quality Control)/SPC (statistical Process Control) tools are employed.

  10. Supplementing Documents • Chemical composition certification for raw material • Certified data of dimension of manufactured items as measured in CMM • Issue of records for Heat treatment / coating thickness • Inspection report of visual and functional before assembly • Certified data of assembled physical dimension of the item as measured in CMM / Lay out checking machine

  11. TEAM STRUCTURE FOR MANAGEMENT QUALITY CONTROL MANAGER

  12. OPTIMIZATION COST OPTIMIZATION • Minimizing rework through quality control and inspection. • Better customer interaction at various stages of evaluation. MANUFACTURING OPTIMIZATION is done using following tools • Jigs and fixtures • CNC programming optimization techniques • Sampling inspection in the measurements • Product simplification and value analysis would be done later after evaluating the performance of the ten proto actuators

  13. Out sourced activities • Aluminum castings includes • Teak wood pattern designing, cores and core boxes • Inspection of patterns, cores and core boxes • Pouring in the presence of SPM engineers and collecting test samples • Test the sample for chemical analysis • Test the sample for strength • After test clearance of sample checks for castings • Approve castings • Take up for machining • Solution Treatment • Coating : Thickness Measurement Control • Procurement of Delrin rods • Heat treatment for SS

  14. 4.Plan to procure required raw material and the electro-mechanical items. • Ultra Motion Digit linear actuator D-A.083-HT17-3.5 • Micro-E Systems MII linear encoder, MII5850 • Micro-E Systems MII scale, 303-R3683-01 • Voice-coil actuator, H2W NCC15-24-050-1R • Stepper motor NEMA17, Anaheim Automation 15Y202D-LW4 or similar Limit switches, Hall sensor IC, indicator magnet • PROPRIETARY OR BOUGHT OUT PARTS • The model NCC15-24-050-1R is commercially available off-the-shelf voice coil from H2W Technology. • Voice-coil actuator, H2W NCC15-24-050-1R • Stepper motor NEMA17, Anaheim Automation 15Y202D-LW4 or similar • Limit switches, Magnet & Hall sensor IC (not in our scope ) PS

  15. 5.Manufacturing methodology and brief about required facilities. STRATEGY FOR EXECUTION • A Dedicated team is formed for the execution. • Dust free assembly area will be ear marked only for the actuators assembly, • A bonded store will be created for exclusively maintained for not to mix up with the day today activities. • Microsoft project will be used for project monitoring and to ensure no slippage occurs in the schedule PS

  16. LOCATION FOR ASSEMBLY AND TESTING • We have our own air controlled room and CMM on which we do the assembly measurement and testing with polyurethane flooring. • The specific area of the assembly is 60 Sq Mtr, and it's a part of our one assembly area of 2000 Sq Mtr.

  17. 6. Assembly Procedure • ASSEMBLY PROCESS • Step-1 • Assemble the steel magnets using specified fasteners & forms an enclosure as shown in picture • Step-2 • Install the voice coil & damper on to the casting with specified fasteners as shown in picture • Step-3 • Install the copper plate in the link assembly • Step-4 • Install the upper arm & the two flex pivots in the four –bar linkage sub assembly. Assemble the magnets in the housing

  18. ASSEMBLY PROCESSStep-5Install the vertical link connecting block. Fix the magnetic assembly by shimming to take up the casting clearance.Step6install the offload pivot pin & the spring block assembly. Move the four bar linkage & voice coil to get determined position .Step-7Finally conform that the mechanism can move freely with good clearance without any friction for full range.

  19. ASSEMBLY PROCESS Step-8 Install the offload mechanism & motor the link assembly & the four rulon bushings on the offload arm. Step-9 Install the actuator end block to the end of the liner actuator. Step-10 Install encoder on to the encoder bracket & mount to the housing (care to be taken to avoid scratches on scale) Step-11 Do a fit check for a) SSA adapter bar, b) Output flexure rod c) Rod restraint tube Step-12 Mark each actuator with a unique serial number (as per TMT specification)

  20. ACCEPTANCE CRITERIA AND TEST PLANS IN THE FACTORY AND ON-SITE • PRE SHIPMENT TEST A limited set of simple functional tests will be completed prior to shipment of the prototype actuators. • TEST EQUIPMENTS • Encoder interface adapter (Micro E-Systems ATMII5000-S-US Smart Precision Alignment Tool). • Stepper motor driver/indexer (Applied Motion Products Model Si2035 or similar). • Audio signal generator. • Laptop computer with network adapter (for encoder) and serial port adapter (for motor driver). • Spring gauge

  21. FUNCTIONAL TEST PROCEDURE • Mount the actuator securely to a flat surface using bolts through its two mounting holes. • Test for range of travel and force a) Extension of the actuator output shaft. b) Extension of the off loader. c) Using a spring gauge, measure the pull force at the actuator output shaft before the four bar linkage moves. d) Extension of the actuator output shaft. e) Extension of the off loader. f) Using a spring gauge, measure the push force at the actuator output before the four-bar linkage moves.

  22. TEST FOR ENCODER OPERATION (This test can be done in parallel with preceding test). • Connect the encoder to the encoder interface adapter; connect the adapter to a laptop computer, and run the encoder diagnostic software. Move the off loader over its range of travel as above. Measure: • Encoder measurement with off loader retracted. • Encoder measurement with of loader extended. • Confirm “green” signal strength over the full range of travel. • TEST FOR VOICE COIL OPERATION. • Set the peak-to-peak amplitude at the voice coil leads to 0.4 V [TBC]. Measure: • Encoder peak-to-peak value. • Move the off loader so that the voice coil is 3 mm from minimum extension. Measure: • Encoder peak-to-peak value. • Move the off loader so that the voice coil is 3 mm from maximum extension. Measure: • Encoder peak-to-peak value.

  23. CONTROLS ARCHITECHTURE

  24. ALIGNMENT TOOL FEATURES • Provides fast and easy sensor alignment, index setup and limit setup • Status and setup LED’s: red / yellow / green signal strength LED’s assist during setup and provide diagnostics at a glance; status LED’s for both limits; power-indicating LED • Includes AC/DC power supply • Use push button or software for setup • Built-in Smart Precision II Software for setup, monitoring, and diagnostics; only a web browser is needed (use of software is optional) • Ethernet software connectivity supports remote connection to the Alignment Tool and MII5000 encoder, and multiple encoders / computers

  25. MICROSTEP DRIVE FEATURES SPM INDIA LTD

  26. COMPLIANCE MATRIX

  27. 7. Sequence of Operation K O M CHECK LIST PURCHASE OF BOUGHOUT ITEMS PATTERN FOR CASTING CHECK PATTERN REWORK CASTINGS CHECK CASTING REJECT MACHINING INSPECTION IN CMM GRINDING NOT OK OK NOT OK NOT OK OK NOT OK OK

  28. X WELDING COATING SOLUTION TREATMENT CHECK DIE PENETRATION TEST COATING TEST HARDNESS TEST REJECT/REWORK STORES NOT OK NOT OK OK

  29. 8. Quality Control and Assurance. ISO-9001-2008 Standard. QUALITY ASSURANCE ACTIVITIES. Request for Quality Audit of Verdicted Products Control of NC products Identified NC product Customer Complaints input & final Product Resources Man power Instruments System Customer Complaints PERFORMANCE PARAMETERS: A). Derived from Company Quality Policy. 1.Number of Improvements Implemented. 2.Value of Non-Value adding Activities Eliminated. B). Derived from Quality in Quality Assurance Process. 1. Reduction in no of customer complaints.

  30. 9.Requirement to sub-contract part of work if any.

  31. 10. Detailed Schedule (procurement, manufacturing, assembling, testing etc.)

  32. 11. A tentative plan for the mass production of actuator. • For castings we can manufacture Dies and castings can be obtained to close dimensions. With this machining can be reduced to a large extent. Amount saved in machining will be much more than the cost of dies. • Re designing the component drawing keeping in mind the Die output so that machining can be minimized to bear minimum. Optimal Interface of CAD/CAM/CAE. • In order to economize the production we can device Jigs and Fixtures such that different set up fixtures ensure machining of components to requisite tolerance using conventional machines in lieu of CNC machines thereby the cost can be reduced. • Checking / inspection fixture or gauge can be manufactured thereby CMM cost can be reduced. • Assembly Jigs can be devised such that assembly time can be reduced. • Final assembly validation jig can be devised such that final assembly validation can be controlled. • Equivalent bought outs of other reputed make can also be tried out as an alternative to economize the costing. • Our decades of honed experience for having designed, manufacture and proved out many Jigs and Fixtures such as : • Casting averaging cum qualifying fixture. • Different set up fixture for conventional and CNC machines • Hydraulic or Pneumo-hydraulic Jigs and fixtures • Palletized fixtures • Assembly fixtures or checking gauges. • Welding jigs and fixtures etc. GDR

  33. Risk identification and mitigation plan • We have already identified the probable risk of breakage • or damage during assembly of two proto’s  and as such • we have planned to mfr 3 sets of mfg items • PERT and CPM would be deployed • We have identified  the probable risk of rejection of castings • and as such we will be  casting 5 sets of castings. • We have identified the probable risk of damage or breakage of • bought outs during assembly as such we are planning to • buy in more qty. • Probable risk of non-functioning of the assemblage as  • devised kinematically / kinetically : Tolerance analysis and FMEA • analysis would be deployed to set right the same. • Monte carlo simulation technique would be deployed • SQC /SPC tools would be deployed using SIGMA XL TOOL.

  34. Change control process • Based on the feed back of 2 proto’s there may be changes that would be required in the balance 8 nos.  We will not process  the mfg till the feed back from TMT / JPL • As we are planning to machine all the parts on CNC’s, change in programme is at our control. • Probable change in casting : minor changes can be accommodated in the pattern • Probable change in toolings: we can always accommodate the changes if it is minor change around the standard tooling. • As mathematical model is not in our  access we can only help  using ANSYS for validation of the change and the probable animated output. • Manufacturing process in detail • The process planning sheet  is as per the sheet enclosed and we would  prepare a process sheet showing process in sequence, on type of machine, type of holding device, type of tooling, type of gauging / inspection, type of other standard holders / spanners required. • Source : in case of problem what is to be done • In case of problem with the vendor we would resolve by RCA and CAPA. In the force de majeure condition we have alternate vendor source so that the job will not be stopped at any point of time. • ­­­

  35. BIG THANK YOU for the Time