An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NASA Global HawkAircraft Status, Integration, Op’s, Schedule 23 Oct 2013 ATTREX 2013-2014

  2. ATTREX Payloads

  3. ATTREX Payloads ATTREX Instrument Arrangement on Aircraft 2014 Manifest

  4. ATTREX Flights - 2013 6 Flights over 4 weeks (2/5 – 3/1) EAFB

  5. Integration, Testing, Safety

  6. Hangar Operations (B4840)

  7. 2013/14 Payload Integration • Two new instruments added last year • NOAA Water, Picarro • However, integration went very smoothly • Integration for 2014 Mission • Adding Hawkeye Pod • Wing Mount in-work, Hawkeye Pod Flight to occur prior to ATTREX Team arrival • All instruments will be required to repeat Wt. & SIL Bench Testing • Integration will occur in “new” B4840 Hangar • Payload Support Area is larger • Separated from Aircraft Maintenance Area

  8. Hawkeye Pod in 2014

  9. “New” GH Hangar (B-4840)

  10. GH Payload Area (B-4840)

  11. Flight Operations - 2013 • Six Science Flights • Conducted over a four week period • Significant Progress Made with Flight into Cold Air and with Multiple Vertical Profiling Maneuvers/Flt. • NGC and DFRC Reviews cleared op’s to colder T’s • Lower Freezing-point Fuel made a significant difference • Additional Reviews in Work • Review of clearing Spoiler actuators to colder temp in work • Review of cold-temperature cycling in work • FAA/R2508 Laser-approval Progress for CPL • We have received approval for laser op’s in R2508 • We have received approval for laser op’s over land

  12. Flight Operations - 2014 • Guam Operations • Weekly meetings, Site Visits • NGC Nose-gear Study in work • Shipping arrangements • GH Team, Travel • Flight Op’s • Use of PMOF from Guam during Range Flight • Need for split Instrument Team’s initially • All Payload Op’s from Guam • Effect of Gov’t Shutdown on schedule