An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TWU Board of Regents Deferred Maintenance June 6, 2014

  2. Our Strategic Operating Plan is inclusive of all aspects of facilities management. • Accumulated deferred maintenance • Facilities Capability and Assessment Program (FCAP) • Construction in the 2006-2011 timeframe eliminated deferred maintenance and code compliance deficiencies as reflected below: • Institute of Health Sciences - Houston Center ………………………….….…$10,607,835 • Ann Stuart Science Complex………………………………………………….…...…..$6,200,000 • T. Boone Pickens Institute of Health Sciences – Dallas Center……....….$1,633,616 • Periodically, FMC uses Facilities Condition Assessments to assist in the evaluation and effectiveness of our deferred maintenance program. Calendar years 2004 and 2012 were our most recent efforts.

  3. In 2012 we reported to the Board that: • Sixty (60) building on Denton campus were included in the assessment. • Of those, approximately 80% were audited. • Various categories of that work was in progress at that time: • Old Main Street Paving • Campus Infrastructure and Drainage • Stoddard Hall Interior Renovation • Some work proposed for approval by the Board on that day: • Fire Code Mandates • Chiller Capacity Upgrade • MCL 9th Floor Renovation • We also advised that, if every single item in the audit was funded we would need approximately $51,700,000.

  4. Report Components Audited: • Environmental Health and Safety • Roof Systems • Fire Code Mandates • HVAC • Electrical • Accessibility • Elevators • Architectural Building Envelope Integrity

  5. Deferred Maintenance 2006 – 2012 Houston Redbud Old Main PH I Dallas Science

  6. Summary of Facilities Assessment Audits

  7. Deferred Maintenance to be Reported to the THECB