Member of
This presentation is the property of its rightful owner.
Sponsored Links
1 / 28

SAE Magnetics (H.K.) Ltd. PowerPoint PPT Presentation


  • 85 Views
  • Uploaded on
  • Presentation posted in: General

Member of. Group. Company Background. SAE Magnetics (H.K.) Ltd. History. Establishment1980 Member of TDK 1986 DongGuan Plant 1990 ISO9002 Certificate 1993 ISO14000 Certificate 1999. Main Business.

Download Presentation

SAE Magnetics (H.K.) Ltd.

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Sae magnetics h k ltd

Member of

Group

Company Background

SAE Magnetics (H.K.) Ltd.


Sae magnetics h k ltd

History

  • Establishment1980

  • Member of TDK 1986

  • DongGuan Plant 1990

  • ISO9002 Certificate 1993

  • ISO14000 Certificate 1999


Sae magnetics h k ltd

Main Business

Manufacturer of Magnetic Heads for Computer Hard Disk Drives


Sae magnetics h k ltd

Manufacturing

  • Metal-In-Gap (MIG), Thin Film, Magneto-Resistive (MR), Giant MR, etc..

  • Head Gimbal Assembly (HGA)

  • Head Stack Assembly (HSA)


Sae magnetics h k ltd

Quality Assurance

Quality

is the only way to survive and

prosper in

business


Sae magnetics h k ltd

Quality Objectives

  • SAE works to achieve Total Customer Satisfaction

  • SAE never ceases to improve our Quality

  • SAE produces products with built-in Quality


Sae magnetics h k ltd

Offices and Plants

  • Hong Kong

  • Dongguan, China

  • California, USA

  • Singapore

  • Philippine

  • Korea


Sae magnetics h k ltd

Hong Kong Office

  • 600 + Employees

  • Design & Development, Prototype Engineering

  • Research - Electrical/Magnetic, Mechanical, Process & Testing Engineering


Sae magnetics h k ltd

  • Over 20,000 employees

  • 4 Manufacturing Plants

  • Mass production -

    over 10M heads per month

DGN Plants


Sae magnetics h k ltd

Industrial

Attachment

2001

Scheme


Sae magnetics h k ltd

Objective

Opportunity to join SMART Development Program

To generate new idea for your Final Year Project

Develop your future Career Development

Real Life working experience

Industrial Training for student


Sae magnetics h k ltd

Arrangement

Training Period: Jun 20 to Aug 16

Working Hour: 8 : 00am - 5 : 00pm (Mon - Fri)

8:00am - 2:00pm (Sat)

Dormitory: SAE provided

Transportation: SAE provided

To & Fro ShenZhen & DongGang


Sae magnetics h k ltd

Training Program

- Plant Regulation Briefing

- ISO 9000 & ISO 14000 Awareness Training

- Production Process

Introduction

- Handle department projects


Sae magnetics h k ltd

Training Program

- Regular meeting will HR & University

representatives

- Individual Project Presentation

- Certificate Award


Training schedule

Training Schedule

DateEvent

Jun 20Orientation

Jun 21-23ISO Training &

Production Process Introduction

Jun 26 - Aug 13Department assigned Project

Aug 14, 15Individual Presentation & Certificate Presentation


Sae magnetics h k ltd

SMART

Development

Program


Sae magnetics h k ltd

S

M

A

R

T


Sae magnetics h k ltd

S

M

A

R

T

Specific

Focused and specific training

to develop competent staff


Sae magnetics h k ltd

S

M

A

R

T

M B O

(Management By Objective)

Clear objective on staff development


Sae magnetics h k ltd

S

M

A

R

T

Achievement

Achieve high standard of

quality in training


Sae magnetics h k ltd

S

M

A

R

T

R esult Oriented

Measure performance by result


Sae magnetics h k ltd

S

M

A

R

T

T alent

Retain outstanding talent in S A E


Sae magnetics h k ltd

S

M

A

R

T

Specific

MBO

Achievement

Result Oriented

Talent


Sae magnetics h k ltd

Immediately Strategy

Industrial Attachment Scheme

Final Year Project in University

Satisfy SAE Project Needs


Sae magnetics h k ltd

Long Term Strategy

Manager II / Principal Engineer II

/ Senior Engineer

SMART Engineering Trainee

Degree / Master Student After Graduate


Sae magnetics h k ltd

SMARTDevelopment Program

- 5 years Development Program

- Results Orientated Review on

each Half Year

- Salary Increment depend on

performance


Sae magnetics h k ltd

S

M

A

R

T


Sae magnetics h k ltd

Thank you !


  • Login