1 / 21

" The game's isn't over until it's over .“ Yogi Berra

" The game's isn't over until it's over .“ Yogi Berra. Update on Technical Monitoring MCAAA Summer Conference. DOE-ARRA Projection Total Units 31,334 File reviews 3,134 Site reviews 1,567. Update on Technical Monitoring MCAAA Summer Conference.

Download Presentation

" The game's isn't over until it's over .“ Yogi Berra

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. "The game's isn't over until it's over.“ Yogi Berra Update on Technical Monitoring MCAAA Summer Conference

  2. DOE-ARRA Projection • Total Units 31,334 • File reviews 3,134 • Site reviews 1,567 Update on Technical Monitoring MCAAA Summer Conference

  3. “Baseball is ninety percent mental. The other half is physical." Yogi Berra

  4. DOE ARRA G.O. Reviewed Michigan's QA’s and increased some agency reviews from the minimum percentages . No longer 10% & 5%

  5. Why you ask?

  6. Air sealing?

  7. Sealed ducts?

  8. Kitchen exhaust…

  9. “I did it myself”

  10. "If people don't want to come out to the ballpark, how are you going to stop them?“ Yogi Berra Update on Technical Monitoring MCAAA Summer Conference

  11. The review starts with a • Quality Assurance Notice Update on Technical Monitoring MCAAA Summer Conference

  12. Contractor/Crew Review

  13. You've got to be very careful if you don't know where you are going because you might not get there." Yogi Berra Update on Technical Monitoring MCAAA Summer Conference

  14. Furnace replaced No sizing of the furnace in the file. Manual J? NEAT? • NEAT identifies measures to be installed, BUT not installed. Agency response: We ran the NEAT to size the furnace, but did not think we had to install all of those other measures or to the full extent of the measure.

  15. Non-SOM or Agency Certified Inspector performed pre/post Inspection on dwellings FINDING • Pre and Post Inspector same person… • Comment on this - a Contractor requests the same post inspector on all of their jobs? • Post Inspector never finds any observations or reports any corrective actions to be taken?

  16. CFL locations and Contractor/Crew installation not completed FINDING • Lead pamphlet was delivered, and signed. But work did not start within 60 days • Pre 1978 construction - NO LSW costs for wall insulation

  17. Job costs don’t match up - job cost report $1721.67 cost center page $2299.67 What was the extra charges? Change Order? Nope • 80 Sq. Ft. identified for Box sill insulation…Contractor billed for 696 sq. ft. of box sill. (The contractor was paid for the billed amount)

  18. "It's like deja vu all over again.“ • Yogi Berra Update on Technical Monitoring MCAAA Summer Conference

  19. Observations turn into Findings when not corrected, and Findings can and have turned into disallowed costs.

  20. "We made too many wrong mistakes." Yogi Berra Update on Technical Monitoring MCAAA Summer Conference

More Related