1 / 17

Storage Infrastructure April 13, 2005

Storage Infrastructure April 13, 2005. Items C-1, C-4, and C-5 Starks Gas Storage Freebird Gas Storage Caledonia Energy Partners. New Storage Projects. Closest Major City. LNG facility, existing or proposed. MS. AL. 2. 3. TX. LA. Mobile. Lake Charles. Port Arthur (Sabine Area). 1.

brant
Download Presentation

Storage Infrastructure April 13, 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Storage InfrastructureApril 13, 2005 Items C-1, C-4, and C-5 Starks Gas Storage Freebird Gas Storage Caledonia Energy Partners

  2. New Storage Projects Closest Major City LNG facility, existing or proposed MS AL 2 3 TX LA Mobile Lake Charles Port Arthur (Sabine Area) 1 Freeport Starks: 19 Bcf, 800 MMcf/d Freebird: 6 Bcf, 160 MMcf/d Caledonia: 11.72 Bcf, 330 MMcf/d 1 2 Corpus Christi 3 Final Order: 17.72 Bcf, 490 MMcf/d Total: 36.72 Bcf, 1290 MMcf/d

  3. PD Louisiana, salt dome 19 Bcf working gas 800 MMcf/d Market Based Rates, under traditional test Services offered- FSS, ISS C-1Starks Gas Storage

  4. C-4 Freebird Gas Storage • Final • Alabama, existing non-jurisdictional, depleted reservoir • 6 Bcf working gas • 160 MMcf/d • Market-based Rates, under traditional test • Services offered – FSS, ISS, parking, loan, imbalance trading, balancing

  5. C-5Caledonia Energy Partners • Final • Mississippi, depleted reservoir • 11.72 Bcf working gas • 330 MMcf/d • Market-based rates, under traditional test • Services offered – FSS, ISS, lending

  6. Deliverability 490 MMcf/d + PD 800 MMcf/d 1290 MMcf/d Capacity 17.72 Bcf + PD 19.00 Bcf 36.72 Bcf New Storage Added

  7. Teams • Starks- Webster Gray, Frank Sparber, Maria Farran, John Wisniewski, Thomas Bahumian • Freebird – Elizabeth Anklam, William Howard, Ethel Morgan, David Hanobic • Caledonia – Selma Lynch, James Campbell, Maria Farran, Shannon Jones, Elizabeth Anklam

  8. Questions?

  9. Item Nos. C- 6 and C- 7 Continuing Progress of LNG Terminals in the Gulf Coast Region April 13, 2005

  10. Legend: Existing Terminal Approved Terminal Proposed Terminal: Pre-Filing Proposed Terminal: Filed Working on DEIS Working on FEIS Planned Terminal Gulf Coast LNG Terminals Pascagoula, MS Lake Charles, LA Port Arthur Sabine Pass, LA Creole Trail Golden Pass, TX Cameron Galveston, TX Freeport McMoran Freeport, TX Port Lavaca, TX Compass Pass Gulf Landing Corpus Christi, TX Vista Del Sol Ingleside LNG Pearl Crossing Beacon Port Port Pelican March 25, 2005 Energy Bridge

  11. Gulf Coast LNG Scorecard Two Terminals in Operation Five New + One Expansion Approved ( Under Construction / Final Design ) One Pending Decision Today Four Working on Final E I S Five Working on Draft E I S Three Working on Pre-Filing One New + One Expansion Planned

  12. Item No. C- 6 Cameron LNG, Docket No. CP02-378-002 Amendment to previous approval to modify LNG berths and maneuvering areas to potentially handle the next generation of larger LNG tankers Cameron

  13. Item No. C- 7 Corpus Christi LNG Corpus Christi LNG, L.P. Docket No. CP04-37-000 Cheniere Corpus Christi Pipeline Co. Docket Nos. CP04-44-000, CP04-45-000 & CP04-46-000 Cameron; C-6 Cheniere Corpus Christi

  14. Item No. C- 7 - Details • Corpus Christi LNG Section 3 Authorization • Marine Terminal • Storage Tanks • Vaporization and sendout of 2.6 Bcf/day

  15. Item No. C- 7 - Details • Cheniere Corpus Christi Pipeline Section 7 Authorization • 23 miles; 48-inch diameter • 91% within existing right-of-ways • Up to 8 interconnects with intra and interstate pipelines • Capacity of over 2.6 Bcf/day

  16. Teams • Corpus Christi – Todd Ruhkamp, Paul Friedman, Kandilarya Jacaman Carolyn Van Der Jagt, Robert Machuga, Vinod Shekar • Cameron – Rich Foley, Dave Swearingen, Kandilarya Jacaman, Joel Arneson

  17. Questions?

More Related