Order Point Calculation

Order Point Calculation PowerPoint PPT Presentation


  • 71 Views
  • Uploaded on
  • Presentation posted in: General

Download Presentation

Order Point Calculation

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


1. Intro to Manufacturing Lean Tools 1 Order Point Calculation Order Point = (LT x Avg) + (StdDev x ServFactor) LT = Lead time to replenish shelf Avg = Average demand per period (typically per week) StdDev = Standard deviation in the demand per period (this measures how variable the demand is compared to the average) ServFactor = Service Factor per table below (what percentage of the time should a customer be able to get the desired quantity from the shelf) Service Level Service Factor 84.0% 1.0 93.5% 1.5 97.5% 2.0 99.3% 2.5 99.8% 3.0