HiRadMat WG 2&3 team meeting. Agenda. Activities for next weeks + perturbations TNC cleaning Beam line removal TCX block removal Survey reference points. TNC cleaning : status. Visual inspection OK

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' HiRadMat WG 2&3 team meeting' - blade


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
hiradmat wg 2 3 team meeting
HiRadMat WG 2&3 team meeting

Agenda

  • Activities for next weeks + perturbations
  • TNC cleaning
  • Beam line removal
  • TCX block removal
  • Survey reference points
tnc cleaning status
TNC cleaning : status
  • Visual inspection OK
  • Smear tests taken where contamination was the highest: reduction by a 10 factor (all smear tests < contamination level)
  • Endelleft on last Tuesday after equipment decontamination + RP checks
  • Dosimetry below estimates (collective dose 2.2 mSv where 3.2 was estimated)
beam line removal
Beam line removal

DIMR completed: https://edms.cern.ch/document/1058846/1

Work in 5 phases:

1- Equipment located between 2 fences  DONE

2- Equipment ready for move in front of T9 (1 magnet + blocks)  DONE

3- Prepare remaining equipment in front of T9 (vacuum disconnection)

4- Remove remaining equipment in front of T9

5- Remove 2 monitors at the end of TNC (4 blocks to be moved)