Growth milestones
This presentation is the property of its rightful owner.
Sponsored Links
1 / 22

Growth Milestones PowerPoint PPT Presentation


  • 87 Views
  • Uploaded on
  • Presentation posted in: General

1942 Foundation 1950s Manufacture of Aerospace components 1960s Design & Manufacture first Landing Gear systems Manufactured the Apollo lunar module landing gear 1970s First Major R&O Contract for USAF 1985 Management buy-out First major military manufacturing contracts

Download Presentation

Growth Milestones

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Growth milestones

1942Foundation

1950sManufacture of Aerospace components

1960sDesign & Manufacture first Landing Gear

systems

Manufactured the Apollo lunar module

landing gear

1970sFirst Major R&O Contract for USAF

1985Management buy-out

First major military manufacturing contracts

(C-130, F-4, F-15, KC-135R)

1986Listed as a Public company (TSX:HRX)

Growth Milestones


Growth milestones1

Creation of Gas Turbine Division

Creation of Aerostructure Division

Merger with Devtek Corporation

Design Engineering Expansion

Awarded 10 year USAF R&O contract

Acquisition of Progressive Inc. (Dallas)

Celebrated 65 years

Acquisition of Eagle Tool and E-2 (Ohio)

Opening of Héroux-Devtek Mexico

Growth Milestones


H roux devtek today

Toronto

City of Montreal

Kitchener

Cleveland

Laval

Longueuil

Dorval

Arlington

Cincinnati

Springfield

Héroux-Devtek Today

Queretaro

  • 358 M$ Annual sales in Fiscal 2011

  • 1650 Employees

  • 13 Facilities/Offices in North America

  • Financially Sound Company

    • Major Investments during the last 3 years

    • Access to Capital


H roux devtek sales

Héroux-Devtek Sales

358

338

Financially sound

308

320

283

256

233


Our customers

Our Customers

END USERS

O.E.M.s

TIER I


Growth milestones

AEROSTRUCTURE DIVISION’S CAPABILITIES

Complex

Kitting

Aircraft

Value-Added

Assembly

Machining

Services

  • 5 Axis high speed and

  • conventional profile milling

  • Aluminum & Titanium

  • Tooling & Support

  • Machined part/hardware

  • Kits to support aftermarket/

  • aircraft modifications

  • Small business partner

  • Raw material integrator

  • Methods/concept

  • Development

  • Manufacturing R&D

  • Customer support

  • Vacuum/dip brazing

  • Hole drilling-fastener installation

  • Wet sealant application

  • Cold expansion of holes

  • Bushing installation

  • Emerging business for

  • structural assembly

Broadening services to provide ultimate customer satisfaction


Growth milestones

STATE OF THE ART MACHINING AND ASSEMBLY FACILITY

12 large 5-axis gantries, 270,000 sq ft climate-controlled facility


Growth milestones

Landing Gear Division


Growth milestones

Engineering

Design

Precision

Manufacturing

Assembly

Repair & Overhaul

  • 90 Engineers

  • CATIA V5-R17/18 & V6

  • MBD/DPD

  • Full Test capabilities:

  • Drop test tower up to 100,000 lbs

  • Small to Large size landing gear components

  • Hydraulic actuators

  • Rotor Hubs

  • Complete system integration

  • Full landing gear systems

  • Supply Chain Management

  • Fully Integrated facility

  • Complete support

  • I.L.S.

LANDING GEAR DIVISION’S CAPABILITIES

Building on Experience to Design the Future


Design development office

Design & Development Office

St-Hubert

90 experienced engineers

2

D

R

O

P

T

E

S

T

T

O

W

E

R

S

S

T

A

T

I

C

-

F

A

T

I

G

U

E

-

E

N

D

U

R

A

N

C

E

Drop Test Tower Specification

  • Load Range (pounds): 5,000- 100,000

  • Max. Sink Speed (ft./s): 24

  • High Speed Data Acquisition System (Ch.) 64/96 at 5kHz per channel

Static/Fatigue/Endurance Test Rig Specification:

  • 3200 sq. ft. of Floor Space

  • Servo Controlled Loading Actuator: 16

  • Data Acquisition System (Ch.) 64/128


Hd s route to integration

HD’s route to integration

We use our Engineering Expertise as a Locomotive

80’s

2000

2010

90’s

  • Product improvement

  • One piece forging

  • Corrosion Protection

  • Credibility

  • Landing Gear Design

  • Design / Manufacture the Learjet 45 and RQ4A & B

  • Design Development and Qualification

  • X45, BA 609, F-35 uplocks, Legacy 450 and LJ 85

  • Systems Design and integration

  • W&B, Steering, Retraction

  • CH53K and Dassault

  • MFG of Spare parts

  • Equipment

  • Programming

  • Know-how of critical part

  • Build To Print Assy

  • C130 Assy to Lockheed

  • KC-135 and P3 to US Government

  • Repair & Overhaul :

  • Finishing

  • Assembly

  • Performance knowledge


Integrator s challenges innovation

Integrator’s challengesInnovation

Understand the Customer’s requirements

Constraints that will have to be managed:

  • Development schedules are challenging

  • Limited Allocated space and geometry of our product

  • Loads and Interfaces

  • Changes during the development phase


Integrator s challenges between the oem and the supply chain

Integrator’s challengesBetween the OEM and the supply chain

12 months

6 months

6 months

24 months


Integrator s challenges between the oem and the supply chain1

Integrator’s challengesBetween the OEM and the supply chain

12 months

6 months

6 months

24 months


Integrator s challenges between the oem and the supply chain2

Integrator’s challengesBetween the OEM and the supply chain

12 months

6 months

6 months

24 months


Integrator s challenges between the oem and the supply chain3

Integrator’s challengesBetween the OEM and the supply chain

12 months

6 months

6 months

24 months


Integrator s challenges between the oem and the supply chain4

12 months

6 months

6 months

24 months

Integrator’s challengesBetween the OEM and the supply chain

DWG release

First delivery

Typical Lead time – 18 months


Integrator s challenges between the oem and the supply chain5

Integrator’s challengesBetween the OEM and the supply chain


Innovation

Innovation

Customer wants more:

Performance Monitoring

New Material

Low Life Cycle Costs

Noise Reduction

Weight Reduction

Manufacturing Processes


Innovation1

Innovation

Chrome

Green


Growth milestones

Thank you !

MERCI Thank You !


  • Login