Hydrology project ii goa funded by world bank april 2006 to june 2014
This presentation is the property of its rightful owner.
Sponsored Links
1 / 27

HYDROLOGY PROJECT-II GOA Funded by World Bank April 2006 to june 2014 PowerPoint PPT Presentation


  • 97 Views
  • Uploaded on
  • Presentation posted in: General

HYDROLOGY PROJECT-II GOA Funded by World Bank April 2006 to june 2014 . Scope of the Project.

Download Presentation

HYDROLOGY PROJECT-II GOA Funded by World Bank April 2006 to june 2014

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Hydrology project ii goa funded by world bank april 2006 to june 2014

HYDROLOGY PROJECT-IIGOAFunded by World BankApril 2006 to june 2014


Scope of the project

Scope of the Project

The project envisages improvement of management of hydrological data in general and project in particular. The raw data collected from field observation would not be enough for design of hydrology and river basin planning unless it is analyzed , processed and stored in a easily retrievable form in the state data center with conjunctive strengthening and linkage between State and Center.

In order to achieve the above target the hydrology project phase -II has been structured in to the following components. 

  • Surface Water hydrology

  • Ground Water Hydrology

  • Hydro Meteorology

  • Water Quality


Basin map of goa

BASIN MAP OF GOA


Organogram for hp ii

Organogram for HP-II


Launch of the project in apri l 2006

Launch of the Project in ApriL2006

  • Project launch in April 2006

  • Interactive session held with central agencies at Goa in May 2006

  • As per advise of Central agencies four expert committees for Surface Water, Ground Water, Hydro Meteorology and Water Quality to implement the project formed


Formation of committees

Formation of Committees

  • State Level Steering Committee chaired by Secretary & Commissioner (Water Resources) formed. First meeting held in march 2007 and second meeting held in March 2010.

  • Expert Committees on Surface water, Ground Water and Hydrometeorology formed and various meetings held

  • Hydrology Users Committee formed


Surface water

Surface Water

  • 23 River Gauge stations identified and proposal submitted to Expert Committee for approval.

  • Expert Committee on Surface Water at its first meeting held on 04/01/2007 approved establishment of 6 River Gauge Stations, at its second meeting held on 23/01/2008 approved establishment of 3 River Gauge Stations and at its third meeting held on 09/03/2010 approved establishment of 2 River Gauge Stations. All the approved River Gauge sites are Bridge sites and have been established.


Surface water1

Surface Water

  • Sites for River Gauge Stations are:

    1. Bicholim(Bicholim river) 7. Orthofond ( Talpona )

    2. Ghoteli (Valvanti river) 8. Paikul (Ragada river)

    3. Ugem (Zuari river) 9. Zambauli (Kushawati river)

    4.Hassapur(Kalna river) 10. Daucond (Khandepar river)

    5. Verna (Sal river) 11. Borus ( Galgibag )

    6. Khadki (Madei river)

  • The collection of data from the above RG Sites has started from July 2009 and June 2010.


Scope of the project

LOCATION OF RIVER GAUGE STATIONS


River gauge sites

River Gauge Sites

Kudchire (Bicholim) Sonal (Sattari)

Sonal (Sattari) Paikul (Sattari)


Staff taking reading at gd station

Staff taking reading at GD station


Data center and laboratory level ii at porvorim

Data Center and Laboratory Level II+ At Porvorim

Rear view Front View

Perspective View


Hydro meteorology

Hydro Meteorology

  • Expert Committee on hydro meteorology at its first meeting held on 23/01/2007 approved establishing of 2 full climatic stations and 6 rain gauge stations.

  • Sites identified are as follows:FCS: 1. Pajimol (Sanguem),

  • 2. Karapur Tisk (Bicholim)ARG: 1. Opa (Ponda), 2. Dhargal (Pernem), 3. Valpoi (Sattari), 4. Colvale (Bardez), 5. Canacona, 6. Cuncolim (Salcette)

  • The collection of data from the above stations has started from July 2009.


Location of rain gauge and climatic stations

LOCATION OF RAIN GAUGE AND CLIMATIC STATIONS


Arg and srg at colvale

ARG and SRG at Cuncolim

ARG and SRG at Colvale

ARG and SRG at Veluz, Valpoi


Arg and srg at opa

ARG and SRG at Chapoli

ARG and SRG at Opa

ARG and SRG at DhargalPernem


Fcs aws at pajimol sanguem

FCS & AWS at PajimolSanguem

FCS & AWS AT

KarapurTisk


Ground water

Ground Water

  • Sites for establishing 110 Ground water monitoring stations identified.

  • Expert Committee on Ground Water at its first meeting held on 26/02/2007 approved establishment of 110 Ground water monitoring stations. (50 open wells, 60 piezometers out of which 41 new and 19 improvement)

  • Ground Water monitoring network consisting of 46 open wells and 58 piezometers established.

  • 25 piezometers have been installed with DWLR.

  • The monitoring of water level for Ground Water has started since 2008.

  • Installation of Telemetry to 25 DWLR is in progress.


Construction of piezometer

Construction of Piezometer

Porvorim


Map of goa showing location of bore well with dwlr under hp ii

Map of Goa showing location of Bore well with DWLR under HP-II

Map of Goa showing location of observation wells under HP-II


Water quality

Water Quality

  • Civil work for construction of laboratory level II+ and data center is completed.

  • Procurement of Laboratory Instruments for level II is completed.

  • 126 baseline Ground water monitoring stations will be utilized for GW Quality monitoring.


Trainings

Trainings


Training in swdes by nih

TRAINING IN SWDES BY NIH


His chart for data flow in hydrology project goa

HIS-Chart for Data flow in Hydrology Project -Goa


Thank you

Thank you


  • Login