SuperKEKB injector upgrade for high charge and low emittance electron beam. M. Yoshida, N. Iida, Y. Ogawa, T. Osawa , Z. Lei T. Natsui , M. Sato, H. Sugimoto, X. Zhou High Energy Accelerator Organization (KEK). Ir 5 Ce Photocathode. High charge & low emittance RF-Gun :.

Download Presentation

10MW Klystron

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


10mw klystron

SuperKEKB injector upgrade for high charge and low emittance electron beam.

M. Yoshida, N. Iida, Y. Ogawa, T. Osawa, Z. Lei T. Natsui, M. Sato, H. Sugimoto, X. ZhouHigh Energy Accelerator Organization (KEK)

Ir5Ce Photocathode

High charge & low emittance RF-Gun :

  • 3-2 RF-Gun (from Sep 2011) :

  • PF/PF-AR Injection during SuperKEKB construction phase

  • 5nC test stand for SuperKEKB

Present beam statue

Cathode rod

  • A-1 RF-Gun (will install until Sep 2012)

  • Cavity : Higher electric focusing field=> Quasi traveling wave

  • Cathode

    • Ir5Ce at room temperature => QE :10-4

    • LaB6 or Ir5Ce with heater => QE :10-3

  • Laser : Higher power & stable laser=> Yb based chirped pulse amplification

Cavity : Disk and Washer

Quasi traveling wave side couple RF gun (100 MV/m, 6mm-mrad, 13.5 MeV)

Laser : Nd doped solid state laser

DAW-type RF gun (90 MV/m, 5 mm-mrad, 3.2 MeV)

- Nd:YVO4 + SESAM passive modelock oscillator

BNL-type RF gun (120 MV/m, 11.0 mm-mrad, 5.5 MeV)

Cathode : LaB6 => Ir5Ce

BNL (3.8 mm)

Beam Size

DAW (1.7 mm)

- Nd:YAG 5-stage amplifier

QTW (0.2 mm)

Injection beam line on the angle

Linac beam line

  • High charge & low emittance RF-Gun

    • Cavity with electric focusing field

      • Disk and Washer => 3-2

      • Quasi Traveling Wave => A-1

    • Long life cathode QE : 10-4

      • LaB6, Ir5Ce at room temperature

    • High power laser > mJ @ 266nm

      • Nd doped solid state laser

      • Yb doped fiber & solid state laser

  • Beam transport

    • Alignment

    • Emittance preservation

    • Beam diagnostics

Longer bunch can reduce space charge effect inside RF-Gun

and also CSR at J-ARC.

High charge low emittance is required for SuperKEKB.

RF-Gun

5-10nC

[email protected]

B

A

J-ARC

A-1

PF

C-1

3-2

RF-Gun

40 nC

BCS

RF-Gun

Target @1-4

3.5 GeV 10nC x 2

ECS

1

2

4

Beam diagnostic station

C

3

5

ECS

for LER

4.0 GeV 4nC x 2

ey < 6 mm mrad

C-band

  • Due to mis-alignment:

  • Dispersion

  • Short range wakefield

for HER

7.0 GeV 5nC x 2

ey < 20 mm mrad

Pulse Q-magnet & pulse steering

Emittance preservation :

Present projected emittance measurement

Simulation of projected emittance

Projected emittance dilution due to transverse wakefield

Wire scanner should install more.

Existing wire scanner

A

σz=2 mm

σa=0.3mm

B

σz=0.75mm

σa=0.3mm

Beam tracking simulation :

Intialemittance : 6 mm mrad

Mis-alignment : s = 0.3mm

Transverse Wakefield Measurement => Initial offsetusing X-band RF-Deflector

PF Injection

DC-Gun

J-ARC

1st order

5

3

4

C

1

2

2nd order

Initial offset

RF-Deflector

z

σz=2 mm

σa=0.1mm

σz=0.75mm

σa=0.1mm

y

x

Project emittance using weak lens

t

Emittance measurement at 5-sector

A

Consideration of bunch compression using J-ARC

RF-Deflectordeveloped by SLAC

PF Injector

B

Weak lens

5

3

4

1

2

C

Emittance (mm mrad)

Input Power : 10MW

Deflecting Voltage : 22 MV

Initial offset scan to compensate transverse wakefield

1.5m RF-Deflector

Beam diagnostic station

In third switch yard

Beam tracking simulation

10MWKlystron