1 / 3

Joint IOU - Review of Energy Division Goal Analysis

Joint IOU - Review of Energy Division Goal Analysis. Review of Energy Division Goal Analysis. Application of 2006-07 verification report is inappropriate Does not account for measure life drop-off from 2006-08 installed measures Does not address uncertainty of ex-post adjustments

binah
Download Presentation

Joint IOU - Review of Energy Division Goal Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Joint IOU - Review of Energy Division Goal Analysis

  2. Review of Energy Division Goal Analysis • Application of 2006-07 verification report is inappropriate • Does not account for measure life drop-off from 2006-08 installed measures • Does not address uncertainty of ex-post adjustments • Does not account for Economic Downturn • Does not account for 2009 program slowdown due to Bridge period • Several 3rd Party and Government Partners have not been approved to begin work • Core Programs have slowed down delivery based on funding uncertainty

  3. 20% Reduction in therm goal does not align goals and interactive effects • Does not account for effective increase in goal due to EUL Drop-off • Does not account for interactive effects in Consumer Electronics or Calculated Measures • Interactive Impacts Removed from DEER or Alternatively, Adopted Gas Goal Should Be Reduced 40% for PG&E and 45% for SDG&E

More Related