Developmental Test & Evaluation. Presented to ITEA Symposium Edward Greer Director, Developmental Test & Evaluation September 14, 2010 www.acq.osd.mil/dte/. Mission of the Director, Developmental Test & Evaluation (DDT&E). DWSS. Improve acquisition outcomes by

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Developmental Test Evaluation' - betty_james


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
slide1

Developmental Test & Evaluation

Presented to ITEA Symposium

Edward Greer

Director, Developmental Test & EvaluationSeptember 14, 2010

www.acq.osd.mil/dte/

mission of the director developmental test evaluation ddt e
Mission of the Director, Developmental Test & Evaluation (DDT&E)

DWSS

Improve acquisition outcomes by

advancing “state of the practice”

    • DDT&E supports:
  • Program Offices and DoD T&E community
  • Test planning and data analysis
  • Early discovery of deficiencies
  • Identification and sharing of best practices
  • Improve DT&E practice thru:
  • DT Policy & Oversight
  • Advancing DT&E Capability and Service Competencies

MRAP

Minimizing Discovery in IOT&E

2

dt e organization
DT&E Organization

Director

Edward Greer

Principal Deputy

Chris DiPetto

Legend:

Appointee

SES

DD, Capability Development

Darlene Mosser-Kerner

DD, Net Centric & Space

Ray Shanahan

DD, Naval Warfare

Patrick Clancy

DD, Air Warfare

George Axiotis

DD, Land and Expeditionary Warfare

Steven Lopes

  • Policy / Guidance
  • Acquisition DT&E
  • Workforce
  • DAU Content
  • TEMP DT&E
  • Concept Briefs
  • Measures and
  • Metrics
  • Joint T&E
  • Integrated T&E
  • DT&E in SEP
  • Annual Report
  • Oversight of MDAP performance
  • TES/TEMP approval
  • MDAP performance - inputs to Congressional report
  • T&E best practices
  • Tech Maturity with RD & SE
  • Assessment of Operational Test Readiness
  • Reliability Growth Testing
  • DT&E inputs to Program Support Reviews
  • High priority test event observation
  • OIPT/DAES support

3

studies on t e and acquisition
Studies on T&E and Acquisition

“Approximately 50% of programs completing IOT&E since 2000 have been assessed as not operationally effective and/or suitable.”

2008 DSB Report on Developmental Test and Evaluation

“. . .beginning production before successfully demonstrating that the weapon system will work as intended increases the potential for discovering costly design changes…and usually requires substantial modification costs at a later time.”

2008 GAO Assessments of Selected Weapon Programs

4

dt e influences acquisition
DT&E Influences Acquisition

LPD-17

  • Pre-IOT&E:
  • AOTR showed high risk to IOT&E
  • Accurately predicted unfavorable results
  • Added time/expense to retest failures

C-5 RERP

  • Milestone B:
  • Adequacy / affordability of the plan
  • Design of Experiments analysis
  • Risk at MS C (Knowledge points) drove
  • agreement with PEO

SDB II

Level of DT&E Engagement

P-8A

  • Milestone C:
  • ITT engaged early and continuously
  • Risk of redesign carefully considered
  • Stable design and predictable performance
  • Low risk – Program entered LRIP on time

5

slide6

DDT&E in DoD: What and When

$1 invested here

TEMP

TEMP

TES

TEMP

CCD

CPD

ICD

IOT&E

6

slide7

DDT&E in DoD: What and When

Saves $100 here

$1 invested here

TEMP

TEMP

TES

TEMP

CCD

CPD

ICD

IOT&E

  • A few DDT&E observations:
  • Lack of DT&E expertise during program formulation
  • DT&E program planning and resourcing not adequate
  • System immaturity at MS C or at OTRR
  • Inadequate reliability growth programs

7

slide8

Environmental Scan

DT&E in

Rapid Prototyping

DoE

DAU

T&E Curriculum

MRTFB

Utilization by PMs

Training

DAB

DDT&E

RTOs

DAES

Planning

Execution

Results

Enhance TEMP

Content

T&E forTechnologies

Emerging

AOTR

T&E Workforce

8

t e associations across the enterprise
T&E Associations across the Enterprise

Test Infrastructure

Developmental Testing

Operational Testing

A

B

C

Warfighter

Engineering and

Manufacturing

Development

Materiel

Solution

Analysis

Technology Development

Production & Deployment

Operations &

Support

Need to Maximize Synergies Across Associations

9

dt e challenges initiatives
DT&E Challenges/Initiatives
  • Efficient, effective and fully Integrated T&E (CODB)
  • Reliability, Availability, and Maintainability
  • Information Assurance
  • Early and continuous engagement with PMs
  • Workforce skill mix
  • Increased use of M&S
  • Emerging technologies
  • Distributed testing

1943 SNJ-5 “Texan” Trainer

10

slide11
Back!

DDT&E is . . . .

  • T&E Community Advocate!

Improving Acquisition Outcomes

11

questions
Questions?

OFFICE OF THE SECRETARY OF DEFENSE

OFFICE OF THE UNDER SECRETARY OF DEFENSE FOR ACQUISITION, TECHNOLOGY, AND LOGISTICS

DEVELOPMENTAL TEST & EVALUATION

3090 Defense Pentagon

Room 3B941

Washington, DC 20301-3090

Email: [email protected]

www.acq.osd.mil/dte

The right information, to the right decision maker, at the right time, for better decisions

ad