1 / 20

Water Quality Protection Project in Bosnia & Herzegowina

Water Quality Protection Project in Bosnia & Herzegowina. Water Quality Protection Project in Bosnia & Herzegowina. Project focuses on: Neretva River Basin (originates in BiH and flows into the Adriatic) Bosna River Basin

bertha-reid
Download Presentation

Water Quality Protection Project in Bosnia & Herzegowina

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Water Quality Protection Projectin Bosnia & Herzegowina

  2. Water Quality Protection Projectin Bosnia & Herzegowina Project focuses on: • Neretva River Basin (originates in BiH and flows into the Adriatic) • Bosna River Basin (begins in BiH and flows into the Sava River, which is BiH’s northern boundary with Croatia)

  3. Water Quality Protection Projectin Bosnia & Herzegowina Project Objectives are to: • develop the Wastewater Improvement Plan • further strengthen the Joint BiH/Croatian Working group • develop and implement high-priority, low-cost water capital investments • disseminate information in BiH and the region for replication elsewhere in the Balkans

  4. Water Quality Protection Projectin Bosnia & Herzegowina The Project also aims at: monitoring and evaluating river water quality through following indicators: • Completion of the Wastewater Improvement Plan • Regional co-operation • Reduction of municipal-based pollution

  5. Water Quality Protection Projectin Bosnia & Herzegowina The Project comprises 4 components • Component AReduction of River Pollution in BiH • Component BHigh-priority Investments • Component C Natural Wastewater Treatment Pilot • Component D Project Management • Component EReplication. Information Sharing and Implementation

  6. Water Quality Protection Projectin Bosnia & Herzegowina Component A (Reduction of River Pollution in BiH) This component is the basis for all further actions for the Wastewater Improvement Plan and comprises: • Upgrading and Enlargement of the existing Water Information System (WIS) • Study of Biological Monitoring of Rivers and Lakes/Reservoirs (BQS)

  7. Water Quality Protection Projectin Bosnia & Herzegowina Component A : WIS Project comprises three phases: • First Phase : Procurement of Equipment completed by EC - CARDS Program for management of the river watersheds in BiH • Second phase : Collection of Data on surface water, water usage, pollution levels, protection, etc. and development of modules • Third phase : Implementation of Program

  8. Water Quality Protection Projectin Bosnia & Herzegowina Component A : BQS Project comprises three activities: • Collecting Data (on existing laws and regulations, etc) • Reviewing Data • Proposing Institutional Improvements • Developing a Surface Water Quality Monitoring System Activities will be summarized in the BIO Monitoring Manual

  9. Water Quality Protection Projectin Bosnia & Herzegowina Component B (High-priority Investments) • MostarDesign andfirst stage construction of a dual sewer system in the central area • Zivinice (in co-operation with other donors)Construction of some sewer lines, a wastewater treatment plant and an effluent pipeline • TrnovoReconstruction of the wastewater treatment plant • Odzak Reconstruction of the wastewater treatment plant

  10. Water Quality Protection Projectin Bosnia & Herzegowina Component B : Mostar The Mostar Urban Environment and Water Quality Plan of 2004 identified three drainage areas: North Valley Central Valley South Valley Present project comprises Detailed Engineering and (partial) Construction of a Dual Sewer System in the Central Valley of the city

  11. Water Quality Protection Projectin Bosnia & Herzegowina Component B : Mostar Central Valley Dual Sewer System Option

  12. Water Quality Protection Projectin Bosnia & Herzegowina Component B : Trnovo Wastewater Treatment Plant Concrete structures need reconditioning Surface aerators to be replaced Pump Station overgrown

  13. Water Quality Protection Projectin Bosnia & Herzegowina Component B : Odzak Wastewater Treatment Plant badly war damaged Heavy pollution at sewage outflow into stream

  14. Water Quality Protection Projectin Bosnia & Herzegowina Component C (Natural Wastewater Treatment Pilot) The Feasibility Study will address low cost natural treatment of wastewater under due consideration of: • Climatic, hydro-geological, social and institutional conditions • Land management • Available technologies • Easy maintenance aspects • Identification of pilot projects • SWOT (Strengths, Weaknesses, Opportunities, Threats) analyses of proposed facilities

  15. Water Quality Protection Projectin Bosnia & Herzegowina Component D (Project Management) This component comprises management and monitoring of the project.

  16. Water Quality Protection Projectin Bosnia & Herzegowina Component E (Replication, Information Sharing and Implementation) This component finances: • Management training for institutional strengthening • Capacity building for utilities • Drafting of Annual Business Plans for each utility • Replication of project findings and/or conclusions • Monitoring, updating and implementation of theAction Plan

  17. Water Quality Protection Projectin Bosnia & Herzegowina Finally Total Project Costs?

  18. Water Quality Protection Projectin Bosnia & Herzegowina Total Project Costs: estimated at 20.3 million US $, of which: • 8.9 million US $ GEF • 5.2 million US $ other donors • 6.2 million US $ the Gvt of BiH

  19. Water Quality Protection Projectin Bosnia & Herzegowina Project Costs by Component • Component AReduction of River Pollution in BiH (0.45 million US$) • Component BHigh-priority Investments (16.39 million US$) • Component C Natural Wastewater Treatment Pilot (1.48 million US$) • Component D Project Management (0.31 million US$) • Component EReplication. Information Sharing and Implementation (0.75 million US$)

  20. Water Quality Protection Projectin Bosnia & Herzegowina GEF = Global Environmental Facility GEF was founded in 1991 by governments to forge international cooperation on fighting following threats: • Biodiversity loss • Climate change • Degradation of international waters • Ozone depletion • Land degradation • Persistent organic pollutants (POPs)

More Related