An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Modeling an Urban Development with MIKE-SWMM Presented by: Melissa Figurski

  2. Site Layout 24.17 acres 46.8% Impervious

  3. Earth Day is every day… Design Approaches Who cares about the environment anyway…

  4. MIKE-SWMM Evaluations • Pre-development • Natural runoff • Post-development • Sewer system pipe runoff • Grassy swale to detention pond runoff

  5. Design Criteria, City of Austin • Drainage Criteria Manual – detention ponds • “Ponds shall be designed to reduce post-development peak rates of discharge to existing pre-development peak rates of discharge from the 2, 10, and 25 year storm events at each point of discharge from the project or development site.” • Environmental Criteria Manual – runoff treatment volume • “one-half inch of runoff plus an additional one-tenth inch for each ten percent increase of gross impervious cover over twenty percent within the drainage area to the control”

  6. Technical Paper 40 • 2 year, 24-hour Storm • 4.1 inches • 10 year, 24-hour Storm • 6.7 inches • 25 year, 24-hour Storm • 7.8 inches Design Storms for Austin, Texas Used SCS Type-II Distribution

  7. Undeveloped Site 10-year storm

  8. Site Layout 24.17 acres 46.8% Impervious

  9. Developed Site – Obtaining Watershed Parameters Does anyone know how to use this thing?!?!

  10. Developed Site – Obtaining Watershed Parameters

  11. Drainage Schematic For Pipe Flow

  12. RUNOFF Block

  13. EXTRAN Block

  14. Gutters cannot carry the 10 year storm Developed Site – concrete drainage with no controls

  15. 146 cfs!! Developed Site – concrete drainage with no controls

  16. Developed Site – Grass Drainage

  17. 78.9 cfs - Getting Better… Developed Site – Grass Drainage but there’s more work to be done!

  18. MIKE-VIEW

  19. Pond Sizing

  20. Sum Outflow Hydrographs Pond Sizing

  21. 41.3 cfs Pond Sizing 10-year Storm Storage = 126,134.8 ft3 2-year Storm Storage = 77,582.38 ft3

  22. 10-year Control 2-year Control Pond Outfall WQ Control Pond Sizing Stage-Storage Table

  23. Almost There… • Input Pond Stage/Storage Data into MIKE-SWMM • Size Pond Outfall Structures for 2 and 10-year Storms • Convince World to Use Swales