Richmond Elementary Modernization and Construction Plan

This agenda outlines the problem, goals, assumptions, facility condition, construction management options, financial capabilities, and siting options for the modernization and construction of Richmond Elementary School.

Download Presentation

Richmond Elementary Modernization and Construction Plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SSUSD Richmond ElementaryStatus to Board of EducationMay 2, 2019

  2. Agenda Problem / COA’s • Goals / Assumptions • Facility Condition • Construction Management • Financial Capabilities • Siting Options / Considerations

  3. Goals / Assumptions Problem / COA’s • Goals: • Provide modern facilities that enhance the learning environment • Create synergy between SSUSD operations and services • Maximize money available for new construction • Remain cognizant of NAWSCL’s future plans • Site new school on Federal Property but outside the perimeter fence • Assumptions: • New construction is more cost effective than renovation/modernization • Increased capacity will be based on Navy mission data • Need to satisfy Federal and State site selection criteria • Leverage 2019 10 Year SSUSD Facilities Master Plan (complete July 2019)

  4. Facility Condition Problem / COA’s • Three Condition Assessments of Richmond Elementary • Assessment 1: • 17 December 2010 • Current Condition Index: 65% Q-3 Rating • Future Condition Index: 56% Q-4 Rating • Assessment 2: • 23 February 2018 • Current Condition Index: 56% Q-4 Rating • Future Condition Index: 42% Q-4 Rating • Cooperative Strategies Assessment: • 15 Jan 2019 • Facility Condition Index: 69.8% • Based on the current physical condition of Richmond Elementary, it is • recommendedthat SSUSD consider new construction vs modernization

  5. Construction Management Problem / COA’s • Plan to utilize internal Director of Construction • Plan to utilize Owners Representative for Cost, Schedule,and Configuration Management • District has considered several construction management options • Construction Management At-Risk • Lease/Leaseback • Design/Bid/Build

  6. Construction Management Problem / COA’s • District is proposing Construction Management at-Risk • Legal counsel recommendation • Recommended by various experts in the field • Potential of eliminating overruns due to change orders • Pre-construction services available • Single payment to contractor • CM provides contractor's perspective during design • CM assists in the value engineering • CM performs quality control to reduce common design problems

  7. Construction Management Problem / COA’s • Construction Management over Prime • Recently completed modernization and new construction utilizing this • method • Perceived loss of district control and cost overruns • Do not plan to use this method at this time • Design/Bid/Build • Requires extensive management by District • District must accept Low Bidder • High probability of cost overruns (no collaboration) • Do not plan to use this method at this time • Lease/Leaseback • Not supported by OEA • Do not plan to use this method at this time

  8. Financial Capabilities Problem / COA’s • SSUSD Intends to Apply for Project Planning and Construction Grants • Project Planning Grant • SSUSD currently has $900K available for construction • SSUSD expects to receive $988K Office of Public School Construction (OPSC) • Funding for BHS Project (OEA Funded) in May 2019 • SSUSD can meet 20% match for up to $8M DoD Planning Grant • Construction Grant • SSUSD expects to receive $12M OPSC Funding for MMS/BHS Projects in 2021 • SSUSD could meet 20% match for up to $60M DoD Construction Grant

  9. Siting Options Six Potential Sites Identified Current Richmond Site Old Murray Middle School (MMS) Site New Richmond Road Site W of New MMS Site N of New MMS Site Vieweg Site

  10. Potential Siting Options for a New Richmond Elementary 1 2 Current Richmond Site Old MMS Site New Richmond Road Site W of New MMS N of New MMS Vieweg Site 6 Vieweg Elem 5 Murray MS Burroughs HS 4 Pierce Elem 3

  11. Site Considerations • Current Richmond Site • Funding required for Richmond demolition • Inside the Installation’s perimeter fence • Have installation access issues during construction • Addresses SSUSD zoning concerns/complications • Would have to house students during construction • Environmental remediation costs potential • Old Murray Middle School Site • Funding required for Richmond and MMS demolition • Inside the Installation’s perimeter fence • Have installation access issues during construction • Addresses SSUSD Zoning Concerns / Complications • Environmental remediation costs potential

  12. Site Considerations • New Richmond Road Site • Money allocated for Richmond Demo only • Undisturbed land…may require full Environmental Impact Study* • Outside the Installation’s perimeter fence • Improves issues associated with installation access during construction • SSUSD zoning concerns/complications • 2 elementary schools in proximity • West of New Murray Middle School Site • Money allocated for Richmond Demo only • Some environmental remediation costs • Outside the installation’s perimeter fence • Addresses SSUSD zoning concerns/complications • Small footprint – would not be enough space • *All other sites have

  13. Site Considerations • North of New Murray Middle School Site (South of Vieweg) • Money allocated for Richmond Demo only • High environmental remediation cost potential • Relocate installation perimeter fence • Outside the installation perimeter • Addresses SSUSD zoning concerns/complications • Vieweg Site • Money allocated for Richmond and Vieweg demolition • Outside the installation’s perimeter fence • Addresses SSUSD zoning concerns/complications • Would have to relocate central kitchen • Would have to relocate SSUSD Adult School • Would have to relocate Curriculum & Instruction Department • Lose potential swing space for future facilities investments

  14. Other Comments Problem / COA’s • SSUSD is well positioned for new school construction • Recent completion of a new middle school • Recent construction under DoD and State Regulatory Agencies • Recent contracts with architecture firms, construction management • firms, and various contractors