State Joint Stock Company Latvian Railway Latvian Railway track Latvian Railway (track length, km) O ur historical link with Russia, Belarus and the rest CIS countries, based not solely on the common railway gauge width of 1520 mm but also on the longstanding economic interests and achievements

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'State Joint Stock Company' - benjamin


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Latvian railway track l.jpg
Latvian Railway track

Latvian Railway (track length, km)

Our historical link with Russia, Belarus and the rest CIS countries, based not solely on the common railway gauge width of 1520 mm but also on the longstanding economic interests and achievements


Latvian r ailway scheme l.jpg
Latvian Railway scheme

narrow-gauge track

centralized traffic control and automatic blocking system

electrified sections

  • Total operational length of track – 2270 km

  • Operational length of electrified track – 257 km

  • Length of the backbone communication cable – 3212 km

  • Length of the optical communication cable – 764 km

  • The total number of employees – 13000






Baltica transit l.jpg
Baltica direction transit

“BALTICA – TRANSIT”

AMERICA/EUROPE – CENTRAL ASIA/CHINA CONTAINER LINE


Realised projects 200 1 200 6 l.jpg
Realised projects 200 direction 1-2006

  • Implementation of the centralised microprocessor system at

  • Riga passenger and Torņakalns stations

  • Construction of the new railway yard in Ventspils railway junction

  • Extension of the reception – departure and marshalling yards’

  • tracks at Liepaja railway station

  • Construction of 4 new passing loops

  • Installation of the new signalling and interlocking equipment in

  • Daugavpils railway station’s departure yard

  • Repair of railway tracks (675 km)

  • Replacement of turnouts (766 sets)

  • Construction of a fiber optic communication line (about 600 km)

  • A new-built reception yard at Rezekne II railway station was

  • put into service in the first quarter of 2006


Projects financed by eu ispa 75 25 latvian railway share l.jpg

Realised projects 200 direction 1-2006

projects financed by EU ISPA (75% + 25% - Latvian Railway share)

Construction of the reception

yard at Rēzekne II railway station

10,2 millionEUR

The total amount of investments

150 million EUR

Modernisation of the automatic

train control system

on Latvian East-West

railway corridor

89,9 million EUR

Modernisation of the rolling stock

hot box detection system

15,1 millionEUR

Replacement of turnouts on

Latvian East-West

railway corridor

35,2 millionEUR


Priority investment projects for the period 2007 2013 l.jpg
Priority investment projects for the period 2007-2013 direction

  • Construction of the second track on the route Riga-Krustpils

  • Reconstruction of Riga railway junction

  • Reconstruction of Daugavpils railway junction

  • Repair of railway tracks (260 km)

  • Overall electrification of the East-West railway corridor (research, preparation of tender documentation and implementation)

  • Replacement of turnouts (500 sets)

  • Implementation of the railway mobile communication system

  • GSM-R on the East-West railway corridor

  • Modernisation of the automatic train control system

  • on the route Riga-Krustpils


Projects expected to be co financed from the cohesion fund 85 15 latvian railway share l.jpg
Projects expected to be co-financed from direction the Cohesion fund (85% + 15% - Latvian Railway share)

2007-2013

The total amount of investments

350 million EUR

Mangaļi-Ziemeļblāzma

Lielvārde

Skrīveri

Krustpils

Šķirotava

Construction of the second railway

track on the route Riga-Krustpils

71,2 millionEUR

Reconstruction of Riga

railway junction

101,6 million EUR

Implementation of the railway mobile

communication system GSM-R

63,7 million EUR

Reconstruction of the railway track

on Latvian East-West

railway corridor

100,2 millionEUR


Equip ment of customs checkpoints l.jpg
Equip direction ment of customs checkpoints

Customs check-points

Trains’ weighing machines

As the border of the Republic of Latvia is the border of the European Union, Latvian railway together with the state revenue service of the Republic of Latvia has participated in the construction of the high-performance control centers at the European Union border with Russia and Belarus

Establishment of the above-mentioned centers has improved the quality if control and minimized the time of train handling