1 / 7

ESTABLISH A NORTH-SOUTH PARKWAY

ESTABLISH A NORTH-SOUTH PARKWAY.

benard
Download Presentation

ESTABLISH A NORTH-SOUTH PARKWAY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ESTABLISH A NORTH-SOUTH PARKWAY The LNTC and the towns should plan for a parallel north-south parkway that will expand the commuter rail impact area to the east, roughly along Prosperity Church Road from I-485 north. Ridership will continue to be a major consideration in justifying funding for any major capital investment in transit. Increased connectivity and capacity enhancements west of I-77 and east of the rail line, all feeding the rail investment, should enhance the ridership base. Even with expanded ridership, however, automobile access will still be a very important factor in the success of a TOD.

  2. PROPOSED RED LINE RAIL STATIONS

  3. CREATING A ‘NEW’ CENTER

  4. PROCESS: 1. Develop Comprehensive Transportation Plan – 50-year plan / Parkway and East-West connections 2. Present to LNTC and Town Boards for input 3. Move to 25 year Long Range Transportation Plan 4. Move to 7-year Transportation Improvement Plan 5. Move to 5-year Work Plan 6. Plans will be presented and developed further with MUMPO and Lake Norman RPO ( Staffed by COG ) NEW ROUND ABOUTS DUAL ROUTES THROUGH DAVIDSON 2 LANES, DIVIDED W/TURN LANE, ROUND ABOUTS, MULTI-PURPOSE PATHS OR SIDEWALKS CORNELIUS TO STUDY HWY 115 IMPROVEMENTS EXISTING ROUND ABOUT 4 LANES FROM HUNTERSVILLE ROUND ABOUT 4 LANES W/BIKE LANES, SIDEWALKS ON BOTH SIDES, PLANTING STRIPS ULI PARKWAY DESIGNATION PLAN

  5. Cornelius RECOMMENDED PROJECTS New Construction Projects 1) Extend Zion Street north to SummerbrookDrive. 2) Extend Zion Street south from Autumn Care to Bailey Road. Construct Smith Circle Connector. 4) Connect Feriba Place to Gem Street or connect Gem Street to Oak Street. Intersection Improvements Oak Street - improve geometry add crosswalks. Main St. (NC115) – add crosswalks, pedestrian enhancements and landscaping 1 3 Cornelius 4 2

  6. HUNTERSVILLE FUTURE 4 LANES

  7. New Construction Projects Potts-Sloan Connection Potts-Eden Connection New Street Parallel Hillside to Cathey Connection Hillside to Woodland Connection Intersection Improvements Beaty/NC 115 (signal/roundabout) Armor/Beaty – pedestrian crossing Delburg/Beaty- pedestrian crossing Beaty/Griffith – roundabout Potts/NC 115 (in Cornelius) – signal/roundabout Jackson/Griffith – controlled intersection Jackson/NC 115 – Add left turn lane NC 115/Concord – Add left turn lane NC 115/Griffith – Pedestrian improvements Road Improvements Widen Potts, sidewalks Stripe bike lanes Sloan, Jetton Add sidewalks to Jetton, Sloan Add median, bike lanes, and sidewalks to Beaty DAVIDSON

More Related