Ayodeji Adeyemi Rhett Bouquet David Brasset Andrew Judice. Globalplex International Dock Port of South Louisiana Reserve, Louisiana. Introduction. Project Brief and Design Criteria Alternative Designs and Selection Permits Public Participation Health and Safety Construction Schedule

Download Presentation

Globalplex International Dock Port of South Louisiana Reserve, Louisiana

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Ayodeji adeyemi rhett bouquet david brasset andrew judice

AyodejiAdeyemi

Rhett Bouquet

David Brasset

Andrew Judice

Globalplex International DockPort of South LouisianaReserve, Louisiana


Introduction

Introduction

  • Project Brief and Design Criteria

  • Alternative Designs and Selection

  • Permits

  • Public Participation

  • Health and Safety

  • Construction Schedule

  • Construction Cost Estimate

  • Plans


The project outline

Design Criteria

The Project Outline

Project Brief

General Cargo Dock

Port of South Louisiana

Between River Miles 138 &139

St. John the Baptist Parish

Reserve, Louisiana

  • Panamax Vessel with 65,000 dwt

  • General Cargo Design Load of 1000 psf

  • HS20-44 Truck Loading

  • Maximum Current of 4.5 Knots


Alternative design selection

Alternative Design & Selection


Permits

Permits

  • Government Agencies

  • US Army Corps of Engineers

  • Levee Board

  • US Coast Guard

  • Riverboat Pilots

  • LADOTD

  • St. John the Baptist Parish


Permits1

Permits

Process

  • Efficient method

  • Thorough method

  • Letters of no objection

    Time

  • Six – eight months


Permits2

Permits

Elevated Roadway Structure

LADOTD Project Permit

Crossing LADOTD Right of Way


Ladotd project permit

LADOTD Project Permit


Public participation

Public Participation

Public input for the Preliminary Design

Informing the public of temporary changes

Informing the public of progress

Suggestions of the public


Health and safety

Health and Safety

Safety is part of the design process

OSHA – Where do their regulations come from?

OSHA – Structural requirements

OSHA – Safety equipment and actions

The power of OSHA


Construction schedule

Construction Schedule


Construction schedule1

Construction Schedule


Cost estimation what is it

Cost Estimation: What is it?

  • Educated approximation of final cost.

  • Done at a point when:

    • A basic idea of material quantities is known

    • Before all of the final details have been worked out

  • Why is it important?

    • Prevents a waste of the engineer’s time and the clients money.

  • A worthwhile cost estimate

    • Total material cost

    • Total labor cost

    • Additional costs

      • GRAND TOTAL (Sum total material and labor)


Cost estimation the components

Cost Estimation: The Components

  • Roadway Bridge

    • Abutment

      • Cast in Place Concrete

      • Compacted Fill

      • Piles

    • Levee Crossing

      • Cast-in-Place Concrete

      • Compacted Fill

      • Slope Paving

    • Roadway Deck

      • Precast Concrete Deck Slabs

      • Deck Framing (Girders & Diaphragms)

      • Painting

    • Roadway Bents

      • Piles

      • 6” Bracing

      • 8” Bracing

      • Structural Steel

      • Painting

  • T-Head Platform

    • Platform Deck &Framing

      • Timber Curb

      • Bollards

      • Cast-in-Place Concrete Deck

      • Finishing Concrete Deck

      • Structural Steel (Beams)

    • Piles and Pipe Bracing

      • 42”φ x .500” Pipe Piles

      • 12” φ Horizontal Bracing

      • 12” φ Vertical Bracing

      • Fender Connection to Pile

      • Painting

    • Fender System

    • Mooring Dolphins

    • Walkway Bents

    • Walkway Spans


Cost estimation roadway bridge

Cost Estimation: Roadway Bridge


Cost estimation t head platform

Cost Estimation: T-Head Platform


Cost estimation additional expenses

Cost Estimation: Additional Expenses


Plans

Plans

  • Proposed General Arrangement

    • Shows Position of Roadway, Dock, and Dolphins

    • Selected Elevations Were Highlighted

    • Soil Borings are Indicated


Plans1

Plans

  • Proposed Roadway Plan and Profile

    • Shows Elevation of Road at Start of Ramp, Highway Crossing, Levee Crossing.

    • Locations of the piles and the spread footings.

    • The road way is 12ft wide.

    • The span length is 1019 ft.


Plans2

Plans

  • Sample Bent

    • A general view of the bent

    • 12ft wide, 10in thick concrete deck

    • W36X135 steel girder .

    • The pile used is a 24in diameter and run -50ft deep from it tip into the ground


Conclusions

Conclusions

  • T-Head Platform dock was chosen as the general cargo dock.

  • Importance of permit acquisition

  • Construction time of approximately 13 months.

  • The total project cost was estimated to be around $9.25 Million