1 / 26

16469- Low Energy Building Design Presentation 3- Demand/Supply Matching

Marc Smeed Edmund Tsang Graham Dow. 16469- Low Energy Building Design Presentation 3- Demand/Supply Matching. DEMAND REDUCTION. START CIBSE ‘TYPICAL PRACTICE PRIMARY SCHOOL’. AIR TIGHT CONSTRUCTION. Assumptions Heating Period External Temp = 8.6 ° C 1 Design Internal Temp = 21 ° C.

becka
Download Presentation

16469- Low Energy Building Design Presentation 3- Demand/Supply Matching

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Marc Smeed Edmund Tsang Graham Dow 16469- Low Energy Building DesignPresentation 3- Demand/Supply Matching

  2. DEMAND REDUCTION STARTCIBSE ‘TYPICAL PRACTICE PRIMARY SCHOOL’

  3. AIR TIGHT CONSTRUCTION • Assumptions • Heating Period External Temp = 8.6°C1 • Design Internal Temp = 21°C Calculated Heat Loss, per m2 per hour = 4.04W/m2h Calculated Heat Loss, per m2 per hour = 1.61W/m2h Saving = (4.04-1.61)/4.04 * 100% =60% Energy Saving = 27.2 kWh/m2 p.a. 1. ESP-r data output: (Average external temp for heating season)

  4. DEMAND REDUCTION CIBSE ‘TYPICAL PRACTICE PRIMARY SCHOOL’

  5. HEAT RECOVERY • Assumptions • External Temp = 8.6°C1 • Design Internal Temp = 21°C • Exchanger εs = 65%2 • Occupied days per year = 1903 • Occupied hours per day = 8 • Ceiling Height = 3m • Total Building Ventilation Rate = 1.5 ACH qs = εs*mmin*Cp*(∆T) = 65%*(0.00125*1.284)*1.014*11 = 0.0116kW/m2 Heat flow rate through sensible heat exchanger4 Occupied hours in the year = 1520 Heat Recovered = 17.7 kWh/m2 p.a. 1. ESP-r data output: (Average external temp for occupied hours) 2. CIBSE Guide F: Table 4.6,p.4-13 3. www.cumbria.gov.uk 4. ASHRAE Handbook 2004: Chapter 44

  6. DEMAND REDUCTION CIBSE ‘TYPICAL PRACTICE PRIMARY SCHOOL’

  7. DEMAND REDUCTION CIBSE ‘TYPICAL PRACTICE PRIMARY SCHOOL’

  8. FOSSIL FUELS 79% LIGHTING CONTROL • Assumptions ELECTRICITY 21% 1.

  9. LIGHTING CONTROL • Assumptions LIGHTING = 10/21 % OF ELECTRICAL LOAD = 47% = 15.2kWh/m2p.a. 1.

  10. LIGHTING CONTROL Occupancy sensors can reduce lighting load by 30-40%1 This can rise to 75% if integrate with PSALI1 Therefore we can assume that we could obtain at least 35% reduction. 35% X 15.2kWh/m2 = 5.33kWh/m2 Energy Saving= 5.33 kWh/m2 p.a. 1. www.advancebuildings.org

  11. DEMAND REDUCTION CIBSE ‘TYPICAL PRACTICE PRIMARY SCHOOL’

  12. ENERGY STORAGE

  13. FLYWHEEL • A rotor is accelerated, maintaining the energy in the system as inertial energy • Maximum Power rating of 2000KW for a multi-cabinet type • Maximum Power rating of 500KW for a single-cabinet type • Stored energy discharges at a maximum time of 2 minutes

  14. FLYWHEEL- FEASIBILTY • ADVANTAGES • Flexible • Commercially available • High power outputs • DISADVANTAGES • Safety concerns • Short discharge times • Expensive

  15. HYDROGEN STORAGE • The 3 key elements are • Electrolysis Mechanism • Hydrogen Storage • Fuel Cell • Hydrogen stored via • Pressurised storage • Ammonia • Metal hydrides

  16. FEASIBILITY • High storage capacity- around 165 KWh /m3 • Only pressurised hydrogen storage is currently available for building use • Other storage only commercially available for vehicles • Expensive

  17. THERMAL ENERGY STORAGE TWO TYPES • Sensible • A Tank underground, used for heat storage (25kWh/m^3) • Latent • Higher energy density (around 100kWh/m^3) • Phase change materials (PCM) used where it solidifies during night then melts during the day

  18. Demand Shifting

  19. Purpose of Demand Shifting • Demand shifting makes use of storage so that peaks and troughs of demand are levelled off • Requires intelligent forward thinking • Can be remotely managed system and use predictions to help shift loads

  20. What's to be gained • Throttling a CHP system is not required • Constant power generation can be attained, decrease maintenance problems • Can help incorporate renewable systems

  21. DEMAND SHIFTING FOR RENEWABLES • Demand shifting can be used to create demand when it suits a renewable supply. • For Example- Solar works when there are higher levels of solar intensity- i.e. in the summer/midday.

  22. SHOULD WE DECOUPLE?

  23. VISION What is going to be different about our School? • A ‘HYDROGEN’ school • A DECOUPLED school A NEW approach to school design

  24. Any Questions ?

More Related