1 / 15

Santa Margarita Region MS4 Permit – Pyrethroids Evaluation

Santa Margarita Region MS4 Permit – Pyrethroids Evaluation. Jason E. Uhley, P.E. Riverside County Flood Control & Water Conservation District. Presentation Outline. Santa Margarita Watershed Overview Permit Requirements Ongoing Activities. Introduction to NPDES MS4 Permits.

basil
Download Presentation

Santa Margarita Region MS4 Permit – Pyrethroids Evaluation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Santa Margarita Region MS4 Permit – Pyrethroids Evaluation Jason E. Uhley, P.E. Riverside County Flood Control & Water Conservation District

  2. Presentation Outline • Santa Margarita Watershed Overview • Permit Requirements • Ongoing Activities

  3. Introduction to NPDES MS4 Permits • Issued within RWQCB jurisdiction on Countywide Basis • Santa Ana Region – Santa Ana RWQCB • Santa Margarita Region – San Diego RWQCB • Whitewater River Region – Colorado RWQCB

  4. General Watershed Information Santa Margarita

  5. Introduction to NPDES MS4 Permits • Unique Conditions in the Santa Margarita Watershed • Ephemeral – Receiving waters typically dry • Limited rising groundwater near SMR • No connectivity with urban runoff during dry conditions

  6. NPDES MS4 Basics • Issued to municipal operators of MS4 (cities and County) • Regulates stormwater and non-stormwater discharges • Eliminate non-stormwater discharges • Manage stormwater discharges • Santa Margarita NPDES MS4 Permit (SD RWQCB) • County of Riverside • Cities of Temecula, Murrieta and now Wildomar • RCFC&WCD

  7. Permittee Structure

  8. Introduction to NPDES MS4 Permits • Typical Permit Compliance Programs Address: • Legal Authority • Elimination of Illegal Connections/Discharges • Construction Inspection • Business Inspection • Municipal Facility and Activity BMPs • New Development BMPs • Public Education and Outreach • Watershed Monitoring/Annual Reporting

  9. Basic Monitoring Program • Permit Requires Monitoring at Major Receiving Waters • Chemistry • Bioassessment • Toxicity • If Toxicity detected, must conduct TIE • After TIE verifies source, Toxicity Reduction Evaluation required

  10. Monitoring Locations

  11. Monitoring Results to Date • 2005-2006 – Persistent Toxicity detected in wet weather flows • 2006-2007 – Pyrethroids determined as likely source • 2007-2008 - Initiated direct measurements for pyrethroids, TRE Notes: 1) Have not conducted sediment toxicity tests 2) Toxicity not detected during dry weather, however, receiving waters are limited to rising groundwater – no connectivity with urban runoff – during dry conditions

  12. Ongoing Activities • Monitoring • TIEs to verify persistence • Pyrethroids testing to assist with source tracking • Regulatory • CDPR Labeling Requirements • CASQA Pesticides Sub-committee • Education and Outreach • HHW/ABOP • Coordinate with Ag Commissioner and UC Cooperative Extension • Require IPM for municipal operations • Point of Sale Outreach • General Education/Outreach

  13. Ongoing Activities • Toxicity Reduction Evaluation • Continued evaluation of persistence and magnitude of toxicity • Literature Review • Source Evaluation and Tracking • Pyrethroids monitoring • Surveys of various representative land uses • Evaluate store sales, Ag. Commissioner, and CDPR data • Develop new BMPs • Public Outreach • Continued lobbying of CDPR, EPA

  14. Ongoing Activities • Annualized Costs $135,525 • Toxicity Testing - $20,700 • TIE - $69,625 • Pyrethroids Monitoring $14,000 • TRE Cost - $31,200 • BMP Implementation – To Be Determined

More Related