Status of the TRD at CERN as of July 2007

Status of the TRD at CERN as of July 2007. TRD Group Physikalisches Institut Universität Heidelberg. TRD sector 08. There is 1 TRD super module installed in sector 08 since October 2006. TRD sector 08 status. This TRD super module is operational since end of March 2007.

base
Download Presentation

Status of the TRD at CERN as of July 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of the TRD at CERNas of July 2007 TRD GroupPhysikalisches Institut Universität Heidelberg

  2. TRD sector 08 There is 1 TRD super module installed in sector 08 since October 2006.

  3. TRD sector 08 status This TRD super module is operational since end of March 2007.

  4. What TRD prepares for in 2007 Services will be prepared assuming the TRD detector will consist of 4 SM by end of 2007 : • sector 00 • sector 08 • sector 09 • sector 17 08 2007 00 09 17 Next 3 SM installation slot is scheduled for Sept/Oct 2007.

  5. TRD-O-Meter The TRD-O-Meter gives an overview on the status of the TRD infrastructure at Point 2. http://alice.uni-hd.de/trd-o-meter

  6. mounting and testing Sector 08 full cabling on C-side is 2-3 days of work

  7. 8 33 34 37 16 0 9 17 24 25 15 TS/EL TOF TOF TOF TOF TRD TRD TRD EMC FMD ACO ACO TPC T0 T0 SDD Sniffers Sniffers Sniffers TPC TRD TRD TRD TRD TOF TOF TOF TOF MTR MTR MTR MTR EXD5/29 EXD4/29 LV SP LV LV LV LV HV CO LV DET DET SP LV LV LV LV LV RO GAS PWR SIG SP LV LV LV SP RO RO RO 0 TRD racks O L3 Magnet Vacuum LV MCH 12 8 PMD LV SP LV MCH 7 0 PMD LV TPC CP MCH LV TOF TOF MTR TS/EL MCH SPD EXD2/29 CP TPC GP TPC MCH LV 11 15 GP TPC TR RO LV TR LV LV TPC TRD Racks in UX25 LV TPC A C 10 CTP CTP TRI TRI 24 20 CTP CTP TRI CT TRI TRD 16 CTP mult CT TRI TRI TRD 17 RO SSD 19 11 TRI CTP TRI mult 27 CT TRD 23 18 LHV SSD LV SDD 19 LHV SSD SP 21 LV SPD 35 28 LV MCH MCH MTR Vacuum Beam Beam LV SPD EXD3/29 36 LV MCH LV CPV LV LV MCH LV PHS LV I MCH LV 39 TS/EL 18 EXD1/29 16 8 0 15 17 34 24 25 33 37 9 EXD6/29 TS/EL HMP HMP HMP TOF TOF TOF TRD TRD TRD TS/EL SPD SPD V0 SSD SSD SSD SSD TPC TRD TRD TRD TRD TOF TOF TOF TOF MTR MTR MTR MTR EXD7/29 TR LV LV LV LV LV LV HV CO RO RO LV CO CO LV LV LV LHV LHV LV LV LV LV LV LV SP RO RO

  8. LV power supply installation • 78/89 power bins are • installed at Point 2 • 26/90 Wiener power • supplies are mounted • 09/90 Wiener power • supplies are operating • sector 08 operating • sector 09 installed • sectors 00,17 • available till end July • GTU power operating • PCU commissioned

  9. HV power distribution • 2 TRD SM can be • operated standalone • from ISEG crates • using patch boxes • as temporary HVDS • replacement • new 32ch ISEG • HV modules for • 4 TRD SM will • be delivered by • end of August • (ATLAS Calo Type)

  10. LV Patch Panel for SM • mounted on the • SM end cap • connects from • LV patch panels • in Back-/Baby- • frame to SM • LV patch chord • cabling is • simplified and • quicker

  11. DCS network monitoring tools We developed monitoring tools for status control of: • Wiener power supplies • Netgear switches • DCS boards

  12. Detector Control System

  13. PVSS FSM Installed at P2mid April 07 Configured SPD SDD SSD TPC TRD TOF HMP PHO CPV MCH MTR FMD T0 V0 PMD ZDC ACO EMC TRG DCS HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV HV RCK LV DSS LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV MON MON MON MON MON MON MON MON MON standard Central effort GAS GAS GAS GAS GAS GAS GAS GAS GAS VME VME VME VME VME VME VME VME VME VME VME VME VME VME COO COO VEN COO COO COO COO COO COO VEN VEN COO FEE FEE FEE FEE FEE FEE FEE GMS FEE FEE FEE FEE HAL semi LV LAS VHV MON APD FEL LVD MOV LED SFM TRG HVD HVD BOM THR IAS MIR GPS LIQ LED VAC PCU THR APD TCO specific LAS NMR GPU PTU CCO CAM GTU CPU SYN TOR RAD DVM DVM TRU

  14. 1st Cosmic TRD-Events at P2 • 1st event taken on 12 May 2007 • presently 5k cosmics taken • signal, reconstructed clusters • TRD-chamber time-0 planes

  15. Outlook • Complete Services for 4 SM (Jul 2007) • GTU commissioning with SM-I (Jul 2007) • Pre-trigger commissioning (Jul 2007) • SM-II commissioning (Aug 2007) • Comm. w/ CTP and trigger detectors (Aug 2007) • Cosmics data taking w/ SM-I and II (Aug 2007) • in total 4 SM installed (Oct 2007)