Observatory Priorities

Observatory Priorities. S. Corder ALMA Deputy Director. Year in review. Slow down for stability successful: Efficiency improvements kept with stability improved Testing/simulation improvements now in place, we will see how much they help Acceptance for Cycle 2:

barto
Download Presentation

Observatory Priorities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Observatory Priorities S. Corder ALMA Deputy Director

  2. Year in review • Slow down for stability successful: • Efficiency improvements kept with stability improved • Testing/simulation improvements now in place, we will see how much they help • Acceptance for Cycle 2: • On time with the needed capabilities present • Time will tell if the number of residual issues is significant, so far looks very good

  3. Goals for the next ˜12 months • Transition to observatory-wide, steady-state operations: • This will include continual upgrades of hard/software • Stopping of science time for engineering and computing will need to be optimized to maximize return for minimum impact • Begin using subarrays to minimize the downtime due to reintegration of antennas • Work towards a more realistic 2-ant correlator at the OSF for testing • Establish and work towards a realistic model of time usage for explicit software testing and science software testing accounting for probable development needs

  4. Obsmode Major Decisions • 75% of the time granted should result in projects that are easily generated and pipeline reducible in principle. • Session linkage will be used sparingly in Cycle 2 • Complicated daytime specialization will wait

  5. (My) Goals for this meeting • Annual cycles will begin with Cycle 3. Input from computing needed to devise a definitive calendar: • What activities are required on a regular basis that will result in extended downtime (outward or inward facing items) • What items have proven difficult to push to the schedule? How much time between critical preparation milestones is requested/needed? • Agreement on what the priorities are at which point in the calendar

  6. Operational Metrics and Targets (of relevance for software) • Online: AE*hr(collected and to-be-delivered) • Technical downtime: container crashes, archive issues, scheduler issues, etc. (target such that execution efficiency is >50%; needs refining) • Efficiency improvements/losses • Excessive flagging • Online: # FSR/night (target< 0.25 in accepted v.) • Mixed: QA2 failure rate (<20%) • Offline: Pipeline uptime • Commissioning: continue as we have agreed.