1 / 9

AMC WITH M/S GEE PRICE DETAILS AND SCOPE

AMC WITH M/S GEE PRICE DETAILS AND SCOPE. DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS. (RECOUPMENT NOT CONSIDERED). DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS FEP SPARES LUMPSUM CHARGES. DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS. AMC CONTRACT SCOPE.

barr
Download Presentation

AMC WITH M/S GEE PRICE DETAILS AND SCOPE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AMC WITH M/S GEEPRICE DETAILS AND SCOPE

  2. DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS (RECOUPMENT NOT CONSIDERED)

  3. DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARSFEP SPARES LUMPSUM CHARGES

  4. DETAILS OF THE AMC CHARGES PAYABLE TO GE FOR 3 YEARS

  5. AMC CONTRACT SCOPE • The Scope of work includes: • Comprehensive maintenance support both for Software and Hardware of SCADA/EMS system installed under SR ULDC scheme covering all control centers in SR (Sub-LDCs, SLDCs, RLDC). • Deployment of trained engineers at SRLDC and all SLDCs (one engineer at each location) • 24x7 support for all critical faults within 30 minutes • Service level agreement at assured availability (penalty in case assured availability is not maintained) • Well defined preventive maintenance schedule.

  6. PROBLEM SEVERITY LEVELS

  7. EMERGENCY SUPPORT RESPONSE TIMES

  8. 1 OF 2 RESPONSIBILITY MATRIX

  9. 2OF 2 RESPONSIBILITY MATRIX

More Related