REUNIÓN TIER-2 UAM 05-10-2006. INSTANCIA EOWYN/LEXOR DEL IFIC PRODUCCIÓN CSC MONTECARLO DE ATLAS. M. Kaci, J. Sánchez, L. March IFIC - Valencia. EXPERIMENTO ATLAS/LHC. USUARIOS. PRODUCCION MC. RECURSOS DE COMPUTACION DEL IFIC. INTRODUCCION.

ban
Download Presentation

INSTANCIA EOWYN/LEXOR DEL IFIC PRODUCCIÓN CSC MONTECARLO DE ATLAS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REUNIÓN TIER-2 UAM 05-10-2006 INSTANCIA EOWYN/LEXOR DEL IFIC PRODUCCIÓN CSC MONTECARLO DE ATLAS M. Kaci, J. Sánchez, L. March IFIC - Valencia EXPERIMENTO ATLAS/LHC USUARIOS PRODUCCION MC RECURSOS DE COMPUTACION DEL IFIC

  2. INTRODUCCION Instancia Eowyn-Lexor en el IFIC (Producción MC) : Recursos dedicados: 2 RB (1 RB LCG y 1 RB gLite), 1 UI, 1 BDII ¿Cómo funciona? ProdSys DB Eowyn-Lexor CE (IFIC) ¿Qué es lo que nos interesa al IFIC?

  3. OBJETIVOS Marcos de evaluación : Dentro del ejercicio de Computing System Commissioning (CSC) : asegurar el buen funcionamiento de Eowyn-Lexor (IFIC) evaluar la contribución de Eowyn-Lexor del IFIC evaluar la contribución de los recursos del IFIC (CE) Dentro del proyecto Tier-2 de ATLAS de España : evaluar la contribución de los recursos del IFIC Fuente de información : ATLAS ProdDB

  4. ATLAS COMPUTING SYSTEM COMMISSIONING Estadísticas de trabajos terminados con éxito : Instancia Eowyn-Lexor (IFIC) [ 8 ejecutores en LCG ] Período : 25 de enero hasta 09 de agosto de 2006 trabajos/día trabajos acumulados 62910 trabajos acabados con éxito utilizando Eowyn-Lexor en el IFIC …/…

  5. ATLAS COMPUTING SYSTEM COMMISSIONING Detalles : contribución mensual mes LCG LEXOR-IFIC contrib. Enero 2136 548 25.7 % Febrero 90358 13800 15.3 % Marzo 45846 8529 18.6 % Abril 64875 10984 16.9 % Mayo 71179 11392 16.0 % Junio 66059 11324 17.1 % Julio 46181 6052 13.1 % Agosto 7080 281 4.0 % Total trabajos terminados con éxito en todo WLCG durante el periodo 25-01-2006 hasta 09-08-2006 : 393714 Contribución integrada de Eowyn-Lexor (IFIC) : 16.0 %

  6. ATLAS COMPUTING SYSTEM COMMISSIONING Estadísticas de trabajos terminados con éxito en el CE : lcg2ce.ific.uv.es Unos 100 CEs contribuyen a la producción : CNAF, UK, … Detalles : contribución mensual Jobs mes LCG IFIC contrib. Enero 2136 6 0.28 % Febrero 90358 2802 3.10 % Marzo 45846 784 1.70 % April 64875 681 1.00 % Mayo 71179 671 0.90 % Junio 66059 343 0.52 % Julio 46181 432 0.94 % Agosto 7080 136 1.90 % Total trabajos terminados con éxito en el CE-IFIC : 5855 Contribución Integrada en el período 25-01-2006 hasta 09-08-2006 : 1.5 %

  7. ATLAS TIER-2 ESPAÑOL Estadísticas de trabajos terminados con éxito en los CEs del Tier-2 español : grid003.ft.uam.es (UAM), ifaece01.pic.es (IFAE), lcg2ce.ific.uv.es (IFIC) Contribución de todos los ejecutores de LCG mes LCG TIER-2 UAM IFAE IFIC Enero 2136 30 1.4% 0 00.0% 24 80.0% 6 20.0% Febrero 90358 3118 3.5% 0 00.0% 316 10.1% 2802 89.9% Marzo 45846 1859 4.1% 846 45.5% 229 12.3% 784 42.2% Abril 64875 1357 2.1% 466 34.3% 210 15.5% 681 50.2% Mayo 71179 1204 1.7% 263 21.8% 270 22.4% 671 55.7% Junio 66059 1250 1.9% 326 26.1% 581 46.5% 343 27.5% Julio 46181 1151 2.5% 422 36.7% 297 25.8% 432 37.5% Agosto 7080 328 4.6% 112 34.1% 80 24.4% 136 41.5% Total contribución : 10297 2.6 % 2435 23.6% 2007 19.5% 5855 56.9% Contribución de Eowyn-Lexor (IFIC) mes LCG TIER-2 UAM IFAE IFIC Enero 548 3 0.5% 0 00.0% 0 00.0% 3 100% Febrero 13800 707 5.1% 0 0.0% 17 24.0% 690 97.6% Marzo 8529 323 3.8% 9 2.8% 10 3.1% 304 94.1% April 10984 897 8.2% 360 40.1% 135 15.1% 402 44.8% Mayo 11392 885 7.8% 178 20.1% 192 21.7% 515 58.2% Junio 11324 749 6.6% 227 30.2% 245 32.8% 277 37.0% Julio 6052 333 5.5% 18 5.4% 41 12.3% 274 82.3% Agosto 281 113 40.2% 0 00.0% 0 00.0% 113 100% Total contribución : 4010 6.4% 792 19.8% 640 16.0% 2578 64.3%

  8. SITUACIÓN ACTUAL Eowyn-Lexor está parado en el IFIC desde el día 9 de agosto Se paró para pasarnos a la nueva versión de Lexor, la cual incluye DQ2 Esta nueva versión trabaja con el RB y UI de gLite, mientras que anteriormente estábamos utilizando el middleware de LCG. A estos recursos hay que añadirles algunos parches adicionales (rpm’s) En el IFIC estamos interesados en instalar y administrar la nueva instancia Eowyn-Lexor Desde la semana pasada, se ha establecido un sistema de shifts en LCG (coordinado por Xavi), para controlar la producción MC. Mirar charla de Xavi para más información. Personas involucradas en los shifts: 8 en total 2 shifters pertenecientes al Tier-2 LCG-ES: Xavier Espinal y Luis March

  9. RESUMEN Evaluación de la contribución del IFIC a la producción de datos simulados Período cubierto : 25-01-2006 hasta 09-08-2006 Fuente de información : ATLAS ProdDB Contribución del IFIC a ATLAS CSC : Jobs : Eowyn-Lexor / WLCG : 16.0 % lcg2ce.ific.uv.es / WLCG : 1.5 % Contribución del IFIC a ATLAS TIER-2 : Jobs : Eowyn-Lexor / T2 : 6.4 % lcg2ce.ific.uv.es / T2 : 56.9 % Actualmente, Lexor está parado en el IFIC. Estamos interesados en instalar la nueva versión con DQ2. Se contribuye a la producción MC mediante shifts