Work zone operational enhancements
This presentation is the property of its rightful owner.
Sponsored Links
1 / 31

Work Zone Operational Enhancements PowerPoint PPT Presentation


  • 50 Views
  • Uploaded on
  • Presentation posted in: General

Jennifer Livingston, P.E . ADOT – Senior Project Manager. Work Zone Operational Enhancements. Kingman District Boundaries. Location of State Route 68. Important corridor for Mohave County Commuter route Strong political support 24-hour consistent traffic count.

Download Presentation

Work Zone Operational Enhancements

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Work zone operational enhancements

Jennifer Livingston, P.E.

ADOT – Senior Project Manager

Work Zone Operational Enhancements


Kingman district boundaries

KingmanDistrict Boundaries


Location of state route 68

Location of State Route 68


State route 68 design build

Important corridor for Mohave County

Commuter route

Strong political support

24-hour consistent traffic count

State Route 68 Design-Build


Work zone operational enhancements

State Route 68Design-Build


Construction impacts to traffic

Construction Impacts to Traffic


Maintenance of traffic

Maintenance of Traffic


Public information campaign

Web page

Construction alerts

Speakers bureau

Placemats

Brochures

Public Information Campaign

  • Project Update Newsletters

  • Hotline

  • Media coordination


Public information campaign benefits

Public Information CampaignBenefits

  • Open lines of communication

  • Improved agency image

  • Increased customer awareness

  • Medium and audience flexibility


Public information campaign considerations

Public Information CampaignConsiderations

  • Financial

  • Perception

  • Commitment

  • Support

  • Proactive


Work zone operational enhancements

Lane Rental


Lane rental benefits

Lane RentalBenefits

  • Accountability

  • Respecting our customers

  • Motivates the contractor

  • Creates teamwork


Lane rental considerations

Lane RentalConsiderations

  • Financial

  • Application

  • Change in status quo


Vms variable message sign

VMS (Variable Message Sign)


Variable message signs benefits

Variable Message SignsBenefits

  • Reaching target audience

  • Immediate and accurate information

  • Provides motorist with options


Variable message signs considerations

Variable Message SignsConsiderations

  • System maintenance

  • Support

  • Technology

  • Financial

  • Application

  • Limitations

Planned VMS in AZ


Hcrs highway conditions and reporting system

HCRS (Highway Conditions and Reporting System)

www.dot.state.az.us

www.azfms.com/HCRS/arizona.html


Hcrs highway conditions and reporting system benefits

HCRS - Highway Conditions and Reporting SystemBenefits

  • Communication tool

  • Accurate and timely information

  • Daily utilization

  • Agency support

  • Statewide consistency


Hcrs highway conditions and reporting system considerations

HCRS - Highway Conditions and Reporting SystemConsiderations

  • Support

  • System maintenance

  • Technology

  • Financial

  • Application


Work zone operational enhancements

SR 68 Travel Time System

Camera at MP 15

Camera at MP 2


Work zone operational enhancements

SR 68 Design-Build Travel Time System

Golden Valley

One set of CCTV’s at MP 12

MICROWAVE

One set of CCTV’s at MP 2

Bullhead City Construction Office

Video images from the two sets of CCTV’s

are received by the computer. Travel Time is

computed for each 10-minute interval.

Video imaging system and tag recognition

provided by Computer Recognition Systems

Tel: 617-491-7665

Contact: Donald Wade or Salvatore D’Agostino


Travel time system benefits

Travel Time System Benefits

  • Contractor commitment

  • Accountability

  • Incentives/ disincentives work


Travel time system considerations

Travel Time System Considerations

  • Application

  • System security

  • Perception

  • Support

  • Financial

  • Technology


Motorist assist patrol

Motorist Assist Patrol


Map survey

MAPSurvey


Measuring the map program

Measuring the MAP Program

Incidents963

Avg wait time14 min

Avg rating4.8/5 scale


Motorist assist patrol benefits

Resource

Department of Public Safety

ADOT Team

Partnership with Private Sector

Customer satisfaction

Review incident prior to deploying ADOT or DPS staff

Responsiveness

Communication

Image of ADOT

Motorist Assist PatrolBenefits


Motorist assist patrol considerations

Service vs. system improvements

Personnel selection

Financial

Liability

Perception

Motorist Assist PatrolConsiderations


Applications

APPLICATIONS

Public Information Campaign • Lane Rental • VMS • HCRS • Travel Time System • MAP


Work zone operational enhancements1

Jennifer Livingston, P.E.

ADOT – Senior Project Manager

Work Zone Operational Enhancements


  • Login