1 / 6

FY06 – Q2/Q3 (Step 1)

FY06 – Q2/Q3 (Step 1). MEBT. RT Cavities. Ion S. H+. RFQ. SSR. DSR. DSR. Rail System. Install & Commission H+ Ion Source and FNAL/ANL Test Cryo Max Beam Energy: 0.050-0.065 MeV Services Needed Cooling Water HV Power ?????. Test Cryostat Commissioning (Q3). FNAL/ANL

Download Presentation

FY06 – Q2/Q3 (Step 1)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FY06 – Q2/Q3 (Step 1) MEBT RT Cavities Ion S. H+ RFQ SSR DSR DSR Rail System • Install & Commission H+ Ion Source and FNAL/ANL Test Cryo • Max Beam Energy: 0.050-0.065 MeV • Services Needed • Cooling Water • HV Power • ????? Test Cryostat Commissioning (Q3) FNAL/ANL Test Cryo (Q2) Power Coupler Testing (Q3) Power Couplers (Q2) New Installation Old Installation Colors Not Installed Commissioning

  2. FY06 – Q4 (Step 2) MEBT RT Cavities Ion S. H+ RFQ SSR DSR DSR Rail System • Install & Commission Rail System • Max Beam Energy: 0.050-0.065 MeV • Services Needed • Ion Source • Cooling Water • HV Power • ????? FNAL/ANL Test Cryo New Installation Old Installation Colors Not Installed Commissioning

  3. FY07 – Q2 (Step 3) MEBT RT Cavities Ion S. H- RFQ SSR DSR DSR Rail System FNAL/ANL Test Cryo • Install & Commission H- Source, MEBT and RT Cavities • Max Beam Energy: 0.065 MeV • Services Needed • Ion Source • Cooling Water • HV Power • ????? • MEBT + RT Cavities • Cooling Water • 325 MH RF Power • 4K He • Solenoid PS • ???? New Installation Old Installation Colors Not Installed Commissioning

  4. FY07 – Q3 (Step 4) MEBT RT Cavities Ion S. H- RFQ SSR DSR DSR Rail System FNAL/ANL Test Cryo • Install & Commission RFQ • Max Beam Energy: 15 MeV • Services Needed • Ion Source • Cooling Water • HV Power • ????? • RFQ + MEBT + RT Cavities • Cooling Water • 325 MH RF Power • 4K He • Solenoid PS • ???? New Installation Old Installation Colors Not Installed Commissioning

  5. FY07 – Q4 (Step 5) MEBT RT Cavities Ion S. H- RFQ SSR DSR DSR Rail System FNAL/ANL Test Cryo • Install & Commission SSR Cryomodule • Max Beam Energy: 33 MeV • Services Needed • Ion Source • Cooling Water • HV Power • ????? (Vacuum, Controls,..) • RFQ + MEBT + RT + SSR Cavities • Cooling Water • 325 MH RF Power • 4K He • Solenoid PS • ???? (Vacuum, Controls,…) New Installation Old Installation Colors Not Installed Commissioning

  6. FY08 – Q2 (Step 6) MEBT RT Cavities Ion S. H- RFQ SSR DSR DSR Rail System FNAL/ANL Test Cryo • Install & Commission DSR Cryomodules • Max Beam Energy: 100 MeV • Services Needed • Ion Source • Cooling Water • HV Power • ????? (Vacuum, Controls,..) • RFQ + MEBT + RT + Spoke Resonators • Cooling Water • 325 MH RF Power • 4K He • Solenoid PS • ???? (Vacuum, Controls,…) New Installation Old Installation Colors Not Installed Commissioning

More Related