Toroid Status

Toroid Status. Ben Freemire HPRF Wednesday Meeting 2/9/11. Pulser Diagram. R1 = 1 k Ω R2 = 1 M Ω R3 = 50 Ω C1 = 0.001 µF V1 = 90.00 V. 1 M Ω Scope Termination. 50 Ω Scope Termination. 51 Ω 510 Ω 1 k Ω. 51 Ω 510 Ω 1 k Ω. Summary. 1 M Ω Scope Termination, Top and Left.

ayita
Download Presentation

Toroid Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Toroid Status Ben Freemire HPRF Wednesday Meeting 2/9/11

  2. Pulser Diagram • R1 = 1 kΩ • R2 = 1 MΩ • R3 = 50 Ω • C1 = 0.001 µF • V1 = 90.00 V B. Freemire HPRF Wednesday Meeting

  3. 1 MΩ Scope Termination 50 Ω Scope Termination 51 Ω 510 Ω 1 kΩ 51 Ω 510 Ω 1 kΩ B. Freemire HPRF Wednesday Meeting

  4. Summary 1 MΩ Scope Termination, Top and Left 50 Ω Scope Termination, Bottom and Right B. Freemire HPRF Wednesday Meeting