MUON UPGRADE: ME0
Download
1 / 16

MUON UPGRADE: ME0 - PowerPoint PPT Presentation


  • 87 Views
  • Uploaded on

MUON UPGRADE: ME0. All engineering drawings from Sasha Surkhov 22.2.2014 PRELIMINARY !!. GMM 3-3-2014. INTERFACE HE: ME0. Extension up to 3.0 ; 3.5 ; 4 ? Calorimeters are working o ut various scenarios. ME0 CHAMBER LOCATION. R_in is 400mm  R_out 1400mm Z_min 200mm Z_max 300mm.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' MUON UPGRADE: ME0' - ayanna


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

MUON UPGRADE: ME0

All engineering drawings from

Sasha Surkhov 22.2.2014

PRELIMINARY !!

GMM 3-3-2014


INTERFACE HE: ME0

  • Extension up to 3.0 ; 3.5 ; 4 ?

  • Calorimeters are working

  • out various scenarios


Me0 chamber location
ME0 CHAMBER LOCATION

R_inis 400mm 

R_out 1400mm

Z_min200mm

Z_max300mm



Possible me0 stack layout
Possible ME0 Stack Layout

Back flange

Mechanical

Supports

Guiding Rail

& Services Pocket

For package of 6

  • 20-degrees/chamber in phi, 2-chamber units offset in phi degrees in successive layers

    • Assures 4 or more hits at all f , given the dead space between abutting chambers

  • Absorbers removed from previous version

  • Need simulations to evaluate

    geometry

  • Weight of each 20 x 18

    degree 6 layer wedge 60x6 = 360 kg

  • Weight of ME0 per endcap

    360x12= 4320 kg

6

1

3

5

2

4

Thicknesses cm:

2.5 Borated Poly

1.2 Pb

3.2 Single Chamber 1

3.2 Single Chamber 2

3.2 Single Chamber 3

3.2 Single Chamber 4

3.2 Single Chamber 5

3.2 Single Chamber 6

3.2 Sliding Rail

1.2 Pb

2.5 Borated Poly

------------------------

28.8cm

2.5 borated polyethylene plus 1.2 Pb for n shielding

f direction →

2.5 borated polyethylene plus 1.2 Pb for n shielding

12

30 degree

Chambers

R_inis 400mm 

R_out 1400mm

Z_min200mm

Z_max300mm

Dz = 30 cm

  • Archana: 21.2.2014


Readout electronics current baseline
Readout Electronics - Current baseline

VFAT3 ASIC

GEB

Opto-hybrid

GBT

TTC

TTC

Opto links

uTCA

uTCA

DCS

DCS

DAQ

DAQ

Muon TF

Backend electronics

Paul Aspell & Gilles Delentdecker


Me0 power possible granularity
ME0 Power : Possible Granularity

  • Each single detector will consist

    • 3072 readout channels – strips running one directional in φ

    • 24 VFAT3 chips

    • 1 optical-hybrid based on GBTs

  • One ME0 super-module wedgewill consist 6 times the single detector.

    • 18432 readout channels – strips running one directional in φ

    • 144 VFAT3 chips

    • 6 optical-hybrids based on GBTs


Lv power table and lv cables package
LV Power Table and LV Cables Package

[email protected]

[email protected]

[email protected]

  • Modular Structure of ME0 permits easy maintenance and operation of all the electronics

  • The LV power granularity should follow the same concept. It will secure:

    • Flexibility of switch on/off part of the super-module

    • Secure the LV current monitoring on single detector level.

    • Dealing with “low” currents per cable.


Fibers possible layout
Fibers – Possible Layout

  • Per single detector we have 4 versatile optical links with 8 fibers to the uTCA GEB in total

  • Per super-module we will have 24 versatile optical links with 192 fibers to the uTCA GEB


Hv powering
HV Powering

  • It will be based on Multichannel system able to measure the HV currents through the GEM foils.

GEM tops

GEM bottom


Cable package for the me0 super module wedge
Cable Package for the ME0 super-module - Wedge

12 LV cables – (6 x [email protected]) + (6 x [email protected])

192 Fibers (24 versatile links to uTCA GEB)

6 HV Multi-core cables


Approximate ME0 Deadlines

August 20

Submit CMS/LHCC

March 20

First Draft

April 20

II Draft

May 20

III Version

June 20

TP Ready

TP

Preparation

Stack Layout

Wedge Engineering Layout

R&D

Needed

Module Layout

Readout Layout

Front-End electronics DAQ

Cost

Estimates

Services Layout

Integration Layout

CERN

Test

Beam

Requests

Costing estimates


Backup
BackUP

  • Documents available from integration Office



Present Shielding for ME1/1: Need Simulations for ME0 shielding

20mm B-Poly + 10mm Pb

h=2.0

GE1/1

GE0

25mm B-Poly + 12mm Pb

Neutron Shielding

50mm B-Poly + 50mm Pb