5.6
Download
1 / 20

Problems about Numbers - PowerPoint PPT Presentation


  • 91 Views
  • Uploaded on

5.6 – Applications. Problems about Numbers. If one more than three times a number is divided by the number, the result is four thirds. Find the number. LCD = 3x. Time to sort one batch (hours). Fraction of the job completed in one hour. 5.6 – Applications. Ryan. Mike. Together.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Problems about Numbers' - ayame


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

5.6 – Applications

Problems about Numbers

If one more than three times a number is divided by the number, the result is four thirds. Find the number.

LCD = 3x


Time to sort one batch (hours)

Fraction of the job completed in one hour

5.6 – Applications

Ryan

Mike

Together

Problems about Work

Mike and Ryan work at a recycling plant. Ryan can sort a batch of recyclables in 2 hours and Mike can sort a batch in 3 hours. If they work together, how fast can they sort one batch?

2

3

x


Time to sort one batch (hours)

Fraction of the job completed in one hour

5.6 – Applications

Ryan

Mike

Together

Problems about Work

2

3

x

LCD =

6x

hrs.


Time to mow one acre (hours)

Fraction of the job completed in one hour

5.6 – Applications

James

Andy

Together

James and Andy mow lawns. It takes James 2 hours to mow an acre while it takes Andy 8 hours. How long will it take them to mow one acre if they work together?

2

8

x


Time to mow one acre (hours)

Fraction of the job completed in one hour

5.6 – Applications

James

Andy

Together

2

8

x

LCD:

8x

hrs.


Time to pump one basement (hours)

Fraction of the job completed in one hour

5.6 – Applications

1st pump

2nd pump

Together

A sump pump can pump water out of a basement in twelve hours. If a second pump is added, the job would only take six and two-thirds hours. How long would it take the second pump to do the job alone?

12

x


Time to pump one basement (hours)

Fraction of the job completed in one hour

5.6 – Applications

1st pump

2nd pump

Together

12

x


5.6 – Applications

60x

LCD:

hrs.


5.6 – Applications

Distance, Rate and Time Problems

If you drive at a constant speed of 65 miles per hour and you travel for 2 hours, how far did you drive?


5.6 – Applications

A car travels six hundred miles in the same time a motorcycle travels four hundred and fifty miles. If the car’s speed is fifteen miles per hour faster than the motorcycle’s, find the speed of both vehicles.

x

t

450 mi

t

x + 15

600 mi


5.6 – Applications

x

t

450 mi

t

x + 15

600 mi

LCD:

x(x + 15)

x(x + 15)

x(x + 15)


5.6 – Applications

x(x + 15)

x(x + 15)

Motorcycle

Car


5.6 – Applications

A boat can travel twenty-two miles upstream in the same amount of time it can travel forty-two miles downstream. The speed of the current is five miles per hour. What is the speed of the boat in still water?

boat speed = x

t

x - 5

22 mi

t

x + 5

42 mi


5.6 – Applications

boat speed = x

t

x - 5

22 mi

t

x + 5

42 mi

LCD:

(x – 5)(x + 5)

(x – 5)(x + 5)

(x – 5)(x + 5)


5.6 – Applications

(x – 5)(x + 5)

(x – 5)(x + 5)

Boat Speed


5 7 division of polynomials
5.7 – Division of Polynomials

Review of Long Division





ad