microalgae to biodiesel week 9
Download
Skip this Video
Download Presentation
Microalgae to Biodiesel Week 9

Loading in 2 Seconds...

play fullscreen
1 / 14

Microalgae to Biodiesel Week 9 - PowerPoint PPT Presentation


  • 112 Views
  • Uploaded on

Microalgae to Biodiesel Week 9. Group Delta Valerie Delligatti Dan Detro Kevin Jackson Joshua Jones Xin Qin. Raceway Pond/PBR. To extraction Unit. Photobioreactor/Raceway Ponds. Approximate Area of PBR/Raceways. x 8. x 8. Material Balances. Extraction Data. Hexane Usage:

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' Microalgae to Biodiesel Week 9' - aviv


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
microalgae to biodiesel week 9
Microalgae to Biodiesel Week 9

Group Delta

Valerie Delligatti

Dan Detro

Kevin Jackson

Joshua Jones

Xin Qin

slide5

x 8

x 8

extraction data
Extraction Data
  • Hexane Usage:
    • Extractor: 73,566 Gallons
    • Work Tank: 16,050 Gallons
    • DT: 13,376 Gallons
    • Dist. : 6,688 Gallons
    • Total: 109,679 Gallons
  • Hexane cost
    • $134.72 per Gallon
    • Cost: $14,776,284
extraction data1
Extraction Data
  • Mineral Oil Usage
    • 10,000 Gallons
    • $19.51 per Gallon
    • Cost: $195,100
  • Cooling Water Usage
    • 14,713 GPM
    • 10 degree max temp. rise
  • Steam Usage
    • DT: 53,503 lb/hr
    • Total: 108,342 lb/hr
rough excavation cost
Rough Excavation Cost
  • Need approx 25,000 of 980.0 square meters of 0.30 meter deep trenches for raceway ponds. Is approx 10,337 cf of “dirt” removed for each pond.
  • Excavation includes machine excavation with front end loader or backhoe, two trucks with 30 minute trips per load. Dumping fee not included.
  • Have not taken into account any tree or rubble removal from site or any concrete laying etc. Only dirt dig and removal.
rough excavation cost1
Rough Excavation Cost
  • May be able to sell dirt from dig.
  • Labor cost is $1,156
  • Cost of removal of cf of “dirt” is $7,649
  • Total is $8,805 (per pond) X 25,000 ponds = $220,125,000
  • Estimated from online calculator “HomeTech Cost Estimator”
plant cost
Plant Cost
  • Algae Production
    • $220,000,000
    • Does not include cost of PBR tanks and FDSF
  • Extraction
    • $24,000,000
    • Scaled from soy crush plant estimates
  • Biodiesel Production
    • $183,564,777
    • Scaled from DOE data
plant cost1
Plant Cost
  • Total Estimate
    • $427,564,777