ABALONE COVE LANDSLIDE ABATEMENT DISTRICT (ACLAD). Board of Directors Sharon Nolan Mary Sheridan Neil Siegel Emily Vaughan Robert Douglas, Chairman Mgr. Well Operations Daphne Clark Secretary Sandy Marshall. ABALONE LANDSLIDE ABATEMENT DISTRICT (ACLAD).

Download Presentation

ABALONE COVE LANDSLIDE ABATEMENT DISTRICT (ACLAD)

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Abalone cove landslide abatement district aclad

ABALONE COVE LANDSLIDE

ABATEMENT DISTRICT

(ACLAD)

Board of Directors

Sharon Nolan

Mary Sheridan

Neil Siegel

Emily Vaughan

Robert Douglas,

Chairman

Mgr. Well Operations

Daphne Clark

Secretary

Sandy Marshall


Abalone landslide abatement district aclad

ABALONE LANDSLIDE ABATEMENT DISTRICT (ACLAD)

  • Geological Hazard Abatement (GHAD) District

    • created by the Beverly Act (SB1195) of l979; ACLAD was the first district formed (1981)

  • Governed by a Board of Directors (5 persons) elected from property owners in the District

    • Assisted by a Secretary and Manager of Well Operations

  • ACLAD assesses property owners in the district to pay for construction and maintenance of abatement measures

    • Example: Dewatering wells

  • GHADs are a means by which homeowners can “help themselves”


Abalone cove landslide abatement district aclad

GROUNDWATER AND

LANDSLIDES

Head

FRACTURES/FISSURES - CONDUITS

FOR INFLITRATING WATER

Toe

SLIDE SURFACE

(IMPERMEABLE LAYER)

GROUNDWATER BUILDUPS

WITHIN LANDSLIDE

Rain

  • RESULT:

  • INCREASE WEIGHT

  • INCREASE PORE

  • PRESSURE

  • MOVEMENT

Abalone Cove

Landslide

?

TRAPPED WATER

Altamira Shale

Basalt


Abalone cove landslide abatement district aclad

WW15

WW12

ACLAD

Dewatering Wells

2006

WW13

WW16

WW1

WW14

WW6

WW8

WW11

WW7

WW17

WW3

WW10

WW4

WW2

WW9

WW5

Abalone Cove

Landslide

WW19

1980 wells

WW20

WW18

Wells added after l985


Abalone cove landslide abatement district aclad

Well Production 1980-2006

Aver. Production approx.150,000 gals/day

First wells

drilled

Upslope wells

added

(Aver. daily production for

February and September)


Abalone cove landslide abatement district aclad

>20,000 gal/day

>6,000 gal/day

1-6,000 gal/day

<1,000 gal/day

WW15

WW12

WW13

WW16

WW14

WW6

WW1

WW11

WW8

WW7

WW17

WW3

WW2

WW4

WW9

WW5

Abalone Cove Landslide

WW19

WW18


Abalone cove landslide abatement district aclad

Major

Maintenance

Project

WW1

WW6

WW3

ACLAD

Original set of wells

1980-81

WW2

REDRILL

WW5

Proposed

Abalone Cove

landslide

Completed


Abalone cove landslide abatement district aclad

RAINFALL

WELL

PRODUCTION

Aver=15 in/yr

WET YEARS

RAINFALL AND

WELL PRODUCTION

DRY YEARS


Abalone cove landslide abatement district aclad

RAINFALL AND MOVEMENT IN THE

ABALONE COVE LANDSLIDE

CREEP (mm/yr rate)

WET YEARS

RAINFALL

THRESHOLD

21-23 in/yr

ENSO cycles

(5-8 yrs)

DRY YEARS


Abalone cove landslide abatement district aclad

INCREASE

RAINFALL

WITH

ELEVATION

Highly

Developed

40% increase

Sparsely

Developed


Summary

SUMMARY

  • ACLAD Dewatering wells currently pumping ~ 200,000 gals/day; nearly 300 acre-feet water annually

  • Since l980, water table elevations have dropped:

    • 25-60+ feet in Abalone Cove Landslide wells

    • 8-10 feet in upslope well

  • Creep (mm/yr rate) in Abalone Cove Landslide occurs when rainfall totals >~22 inches/year

  • Need to rehab older wells and drill new wells in upslope areas

(wet years)


Abalone cove landslide abatement district aclad

ABALONECOVE LANDSLIDE ABATEMENT DISTRICT

(ACLAD)

1980-2006: TWENTY-SIX YEARS OF

PROGRESS AND SERVICE

  • DEWATERING WELLS

  • GPS MEASUREMENTS


Abalone cove landslide abatement district aclad

WW15

ACLAD

Production Wells

2006

WW12

WW13

WW16

WW14

WW6

WW1

WW11

WW8

WW7

WW17

WW3

>20,000 gal/day

>6,000 gal/day

WW2

WW4

WW9

1-6,000 gal/day

WW5

Abalone Cove Landslide

WW19

<1,000 gal/day

WW18


  • Login