Complex interlaced infrastructure onboard testing how much real scale testing should be needed
This presentation is the property of its rightful owner.
Sponsored Links
1 / 36

11 th UIC ERTMS Conference, Istanbula 1-3 April 2014 PowerPoint PPT Presentation


  • 88 Views
  • Uploaded on
  • Presentation posted in: General

Complex interlaced infrastructure - onboard testing: how much real scale testing should be needed ?. 11 th UIC ERTMS Conference, Istanbula 1-3 April 2014. Current situation : Positive messages. 1. 2. 3. ERTMS will be the worldwide standard for rail signaling for the next decades.

Download Presentation

11 th UIC ERTMS Conference, Istanbula 1-3 April 2014

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Complex interlaced infrastructure onboard testing how much real scale testing should be needed

Complex interlaced infrastructure - onboard testing: how much real scale testing should be needed?

11th UIC ERTMS Conference, Istanbula 1-3 April 2014


11 th uic ertms conference istanbula 1 3 april 2014

Currentsituation: Positive messages

1

2

3

ERTMS will be the worldwide standard for rail signaling for the next decades

ERTMS will be deployed in European core and comprehensive corridors

ERTMS Specifications are stable enough and properly managed by ERA

  • Baseline 2 (2.3.0.d) is an stable version in successful commercial operation in many European and non-European countries (Spain, Italy, Switzerland, The Netherlands, China….)

  • Baseline 3 has been already published into the TSI(3.3.0) and it includes some added functionality (braking curves, crossing level, limited supervision…) as well as bugs debugging.

  • Baseline 2 (2.3.0.d) is an stable version in successful commercial operation in many European and non-European countries (Spain, Italy, Switzerland, The Netherlands, China….)

  • Baseline 3 has been already published into the TSI (3.3.0) and it includes some added functionality (braking curves, crossing level, limited supervision…) as well as bugs debugging.

Laboratory Validation

&

Operational scenarios

UIC ERTMS Atlas 2012


11 th uic ertms conference istanbula 1 3 april 2014

Mainpendingchallenges: time and money

1

2

  • Increase market scale

ERTMS costs are too high

Too long process to place in service

  • Increase competition (multiple suppliers)

  • Very high deployment costs (tests on track)

Increase system complexity

  • Operational and train-track integration tests on lab:

  • Reduce time

  • Reduce cost

  • Increase system reliability

  • Advance “last minute problems” (always appeared in the signaling world).


11 th uic ertms conference istanbula 1 3 april 2014

ERTMS works!!!

ERTMS reliability and punctuality in Madrid-Barcelona HSL

Kmsbetweenincidences

Punctuality (delay <5’)

* L2 started in October 2011

** Line was extended in L1 up to Barcelona

*** Line was extended in L1 up to French border


11 th uic ertms conference istanbula 1 3 april 2014

OPERATOR

INFRASTRUCTURE MANAGER

3. How to solve interoperability problems before placing in service a new line?

SYSTEM AUTHORITY AND INTEROPERABILITY (IOP) TESTS

  • Within the new European frame where the operators and infrastructure are separated, it is essential the existence of a System Authority to manage the solution of interoperability problems.

  • MFOM has played this role in the Spanish ERTMS projects.

  • The group led by MFOM (ADIF, RENFE, CEDEX and INECO) has created the validation procedure that allows the opening of railway lines with full warranties of interoperability.

IOP TESTS

Operational and train –track integration TESTS

NATIONAL AUTHORITY:

Ministry of Fomento (Public Works)

IndependentAssesment


11 th uic ertms conference istanbula 1 3 april 2014

3. How to solve interoperability problems before placing in service a new line?

Integration Tests. Main Tested Functionality

  • Speed supervision and braking curves

  • Level transitions

  • Mode changes

  • TSR Managing

  • Managing of MA timers

  • Odometry

  • Track conditions

  • Train Interface unit

  • ATO and preset speed

  • DMI

  • National Functions

  • Maximum Speed for exploitation with free route ahead

  • Degraded situations (loss of comunications, balise group lost, etc)

  • EoA override

  • RBC Handover


11 th uic ertms conference istanbula 1 3 april 2014

3. How to solve interoperability problems before placing in service a new line?

Toachieve full interoperabilitytwooptions are possible:

Performing INT tests once thewholesystemisinstalledonthetrack.

2.Advanceinteroperabilityissuesbyperforming INT testsin a lab and aftersolvingtheproblemsappeared, running INT testsontrack.

Thisistheselectedway in SpanishProjects

Radio Block

Centre (RBC)

GSM-R

ETCS

Onboard Unit

Interlocking

End of section

Eurobalises

(Fix)


11 th uic ertms conference istanbula 1 3 april 2014

3. How to solve interoperability problems before placing in service a new line?

  • CEDEX Rail Interoperability Lab is the first laboratory in the world accredited for certifying ERTMS components and for testing ERTMS lines.

  • The laboratory was created in 1999. It is has been the pioneer on testing ETCS components and subsystems and it has tested equipment's from almost all ERTMS worldwide suppliers.

  • The laboratory has actively participated in the process of placing in service ERTMS in the Spanish High Speed and Conventional Lines (Madrid commuter lines).

  • The laboratory has designed, together with Adif, Renfe and the Ministry of Fomento, the set of INT tests (around 200 tests) which really guarantee full interoperability.


11 th uic ertms conference istanbula 1 3 april 2014

3. How to solve interoperability problems before placing in service a new line?

Background

  • Components specification, including functional tests specification – Subset-076

  • Tests defined for the whole lifecycle (almost)

On-board subsystem

  • Components specification

  • No functional tests for key components (RBC)

  • ETCS Language too flexible: lack of procedures to validate ETCS trackside implementations

Trackside subsystem


11 th uic ertms conference istanbula 1 3 april 2014

3. How to solve interoperability problems before placing in service a new line?

Possible solutions

  • IN THE MID-LONG TERM:

    • Develop functional test specifications for the (generic) RBC.

    • Develop procedures for verification of the trackside ETCS engineering from the design phase (project specific).

    • Insist on the operational harmonization, keeping in mind the strong relationship among operational rules, ETCS functionality and ETCS language syntax.

  • IN THE SHORT TERM:

    • Bring the final project specific integration/interoperability tests into the laboratory to perform Operational and Train-Track integration tests with real ETCS components (ETCS OBU and/or RBC)


11 th uic ertms conference istanbula 1 3 april 2014

4. Testing the line in the laboratory.

The real track data and configuration is introduced into the real Radio Block Center (RBC)………

Tracklayout, switches, signals, trackcircuits...


11 th uic ertms conference istanbula 1 3 april 2014

4. Testing the line in the laboratory.

And the real RBC is connected to the laboratory


11 th uic ertms conference istanbula 1 3 april 2014

4. Testing the line in the laboratory.

The real train data are introduced into the real On Board Unit (EVC)…..

Brakingcapacity, brakesactivation, train interface unit(odometry, pantograph, mainswitch)…..


11 th uic ertms conference istanbula 1 3 april 2014

4. Testing the line in the laboratory.

And the real On Board Unit is connected to the laboratory


11 th uic ertms conference istanbula 1 3 april 2014

4. Testing the line in the laboratory.

RBC and OBU are integrated and tested in the lab connected to all the simulators reproducing: a) the real train dynamics and b) track circuits occupancy, interlocking selected routes and balise telegrams.

Real RBC Dimetronic

Madrid – Levante Line

Real EVC ALSTOM

  • Simulatorswith real project data for:

  • Interlockings

  • Train dynamics,

  • Train odometry

  • Trackcircuits and switches

  • Routes.

  • Balisetelegrams…….


11 th uic ertms conference istanbula 1 3 april 2014

4. Testing the line in the laboratory.

USE OF COMMON FORMATS AND INTERFACES


11 th uic ertms conference istanbula 1 3 april 2014

Network

Isdn

Simulator

isdn

ERSA

4. Testing the line in the laboratory.

Route Map Controller (RMC)

(active)

Define signal aspects

Define points position

RBC

Thales

ATOCHA (SS-112)

Route Map Controller (RMC)

(passive)

Track

Occupation

Routes’ dialog

Track occupation

IXL

(CITEF)

RBC

Invensys-Siemens

Signal aspects

Point pos.

CHAMARTIN (SS-112)

ALSTOM

EVC

TCL

SS-094

Architecture

EVC Adaptor

TCP-IP

Radio

Test Layout for independent

RBC / EVC integration tests

Map to SS-111 Architecture


11 th uic ertms conference istanbula 1 3 april 2014

4. Testing the line in the laboratory.

Route Map Controller (RMC)

ATOCHA & CHAMARTIN SS-112 unified

Routes’ dialog

Track occupation

RBC

Thales

IXL

(CITEF)

RBC

Invensys-Siemens

ALSTOM

EVC

SS-094

Architecture

EVC Adaptor

TCP-IP

Radio

Network

Simulator

ERSA

PABX

ISDN-IP

Invensys / Thales

HO Com. channel

Test Layout for handover tests between RBCs


11 th uic ertms conference istanbula 1 3 april 2014

Track layout: Project data in unified format (SS-112).

Madrid-Valencia line: Horcajada station


11 th uic ertms conference istanbula 1 3 april 2014

TRACK / LAB COMPARISON:

LABORATORY VALIDATION


11 th uic ertms conference istanbula 1 3 april 2014

4. Testing the line in the laboratory.

Laboratory Validation

CEDEX ERTMS lab has been previously validated by comparison between the simulated and the real results. This validation it is needed to guarantee a full confidence in the lab results and to assure a correct signaling system behavior during the commercial exploitation.

TRAFFIC SIMULATOR

ERTMS L2 LABORATORY


11 th uic ertms conference istanbula 1 3 april 2014

4. Testing the line in the laboratory.

Laboratory validation

DEFINITION OF THE OPERATIONAL SCENARIO FOR LABORATORY VALIDATION

Trip between Valdemoro y Villarubia stations

Trackside: Dimetronic / Onboard: Siemens


11 th uic ertms conference istanbula 1 3 april 2014

4. Testing the line in the laboratory.

Laboratory validation

COMPARISON OF THE CALCULATION OF PERMITTED SPEEDS (L1)

Permitted Speed

Permitted Speed Vía

Permitted Speed Lab

300

250

200

Vpermitica (km/h)

150

100

50

0

40000

45000

50000

55000

60000

65000

70000

75000

80000

85000

90000

DTeórica (m)


11 th uic ertms conference istanbula 1 3 april 2014

4. Testing the line in the laboratory.

Laboratory validation

COMPARISON OF THE ESTIMATION OF TRAVELLED DISTANCES


11 th uic ertms conference istanbula 1 3 april 2014

4. Testing the line in the laboratory.

Laboratory validation

COMPARISON OF BRAKING CURVES: TRACK; LABORATORY & LIF & ERA MODELS


11 th uic ertms conference istanbula 1 3 april 2014

4. Testing the line in the laboratory.

Laboratory validation

DEFINITION OF THE OPERATIONAL SCENARIO FOR LABORATORY VALIDATION

Validation trip in LEVEL 2

Trip between NuevosMinisterios and Atocha commuter stations

Trackside: Thales / Onboard: Alstom

Atocha

Atocha

Nuevos Ministerios

  • Level 2 Laboratory validation operational scenario for the commuter lines of Madrid:

  • Train starting at the Balise Group 8102 (associated to signal S2/6M).

  • Track free until signal S32 (Balise Group 8102) that will take free aspect when train approaches.

  • Once S32 shows green aspect the signaling system will allocate track free until Atocha

  • Atocha entry signal E6 shows non proceed aspect


11 th uic ertms conference istanbula 1 3 april 2014

4. Testing the line in the laboratory.

Laboratory validation

Validation trip in LEVEL 2

Speed

Braking Curve

Distance

Permitted Speed

Lab

Permitted Speed

Track

BG Track

BG Lab

Track MA

Lab MA

P24 Lab

P24 Track

P136 Lab

P136 Track


11 th uic ertms conference istanbula 1 3 april 2014

EVC Certification

Placing in service

Project data bases

Assesment & Maintenace

5. CEDEX Rail Interoperability Lab .

RIL

Eurobalise and BTM

Laboratory

Eurocab

Laboratory

Traffic Simulation

Laboratory

Energy Laboratory

CEDEX-CIEMAT

  • Eurobalise certification

  • Antenna/BTM Certification

  • Euroloop Certification

  • Eurobalise Assesment

  • Energy storage

  • Power electronics

  • New sources of energy

  • Management of energetic resources

  • Level 2 tests

  • 2.3.0 “d” Migration

  • Train-track integration tests

  • Operational tests

  • Remote connections


11 th uic ertms conference istanbula 1 3 april 2014

5. CEDEX Rail Interoperability Lab .

RIL

Eurobalise and BTM

Laboratory

Eurocab

Laboratory

Traffic Simulation

Laboratory

Energy Laboratory

CEDEX-CIEMAT

  • European Test campaigns

  • Alstom

  • Ansaldo

  • Bombardier

  • Dimetronic

  • Siemens

  • VUZ (Chech Republic)*

  • CAF*

  • Kyosan (Japan)

  • Shingwooeng (Korea)

  • CARS (China Academy of Railways Science)

  • Beijing Hollysysy (China)

  • Beijing Jioda Signal

  • Beijing Railway Signal

  • Lanxin (China)

  • Casco (China)

  • CAF*

  • European Test campaigns

  • Alstom

  • Ansaldo

  • Bombardier

  • Siemens

  • Thales

  • Digitek

  • Beijing Microunion

  • Hitachi

  • Level 1:

  • Ansaldo

  • Thales

  • Dimetronic

  • Alstom

  • Level 2:

  • Thales

  • Dimetronic

  • General Electric*

  • Ansaldo*

  • CAF*

  • Infrabel

  • European Cross tests


11 th uic ertms conference istanbula 1 3 april 2014

EUROBALISE LABORATORY

European Test Specifications (SS 085) were debugged at CEDEX lab (2004)


11 th uic ertms conference istanbula 1 3 april 2014

EUROLOOP LABORATORY

CEDEX Euroloop lab is the first independent lab performing these tests


11 th uic ertms conference istanbula 1 3 april 2014

TRAFFIC SIMULATION LABORATORY

THALES

RBC

DIMETRONIC / SIEMENS

RBC

ALSTOM

EVC

European Cross Tests are being run at CEDEX lab

TEST LAY-OUT TO TEST THE LEVEL 2 ON THE COMMUTER LINES OF MADRID

(MINISTRY OF FOMENTO)


11 th uic ertms conference istanbula 1 3 april 2014

EUROCAB LABORATORY

Eurocab lab for certifying EVCs against european specifications. CEDEX is the leader of the European Group creating these specifications (SS076)


11 th uic ertms conference istanbula 1 3 april 2014

5. CEDEX Rail Interoperability Lab .

EUG CROSS TEST BETWEEN COMMERCIAL PROJECTS

Using remote connection between EBC and EVC for level 2


11 th uic ertms conference istanbula 1 3 april 2014

6. Conclusions.

CONCLUSIONS

  • At the time being, ERTMS reliability and punctuality in Spain is very high, it is really comparable with the mature national systems previously installed in HSL(LZB,TVM).

  • By following the proposed test procedure, the whole ERTMS line functionality is tested in advance.

  • All interoperability problems appeared between the track subsystem supplier and the On board subsystem supplier are previously solved.

  • In all Spanish ERTMS lines, once the integration tests have been successfully completed, not any important interoperability issue has appeared during the commercial exploitation.

    • CEDEX lab has already performed these tests in all Spanish ERTMS lines. It is the European first Reference lab (and therefore the first lab in the world) in this area and it has tested ERTMS equipments from almost all the world suppliers.

    • Before placing in service any new line, integration tests will be also run on track, but these tests will be strongly supported by the integration tests at lab. This is the way of avoiding any “last minute” problems.


11 th uic ertms conference istanbula 1 3 april 2014

THANKS A LOT FOR YOUR KIND ATTENTION

CEDEX Rail Interoperability Laboratory

Testing real projects signalling system at the Railway Interoperability Laboratory (LIF) of CEDEX

CEDEX ( Studies and Research Center of the Ministry of Public Works and Transport-Fomento)

[email protected]

[email protected]

Madrid, April 2014