An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DDS design statusTask 9.2-Sub-task 2 Alessandro D’Elia on behalf of Roger M. Jones

  2. CLIC_DDS_A • CLIC_DDS_A production is proceeding as scheduled • We are waiting for the disks and couplers • RF measurements (RF transmission measurements and bead pull) will be done at CERN • If everything is fine, the all the further necessary steps will follow (final assembly and bonding) • RF power tests to be discussed and to be planned according to CERN test stand availability

  3. D. Schulte, PAC09, FR5RFP055 8 x DDS_Circular Assumption: Kick on only following trailing bunch CLIC_G Wake limit Too high!! Wake limit In the specs Courtesy of V. Khan and A. Grudiev

  4. New Structure with 2/3 phase advance CLIC_DDS_A Bandwidth is ~2GHz No interleaving in all cases Better performances than CLIC_DDS_A but still not in the limits

  5. Cell#1: different phase advance WGW 5/6 WGH SlotH 2/3 SlotW Htot 5/9

  6. Conclusions • CLIC_DDS_A production reached its final stage • Studies on the wakefield seems confirming that conventional DDS does not meet the wakefield damping specs • New DDS design improves the performances but is still not enough • Studies of structures with different parameters (phase advance) are ongoing