tmci threshold in 2007 and horizontal instability
Download
Skip this Video
Download Presentation
TMCI threshold in 2007 and horizontal instability

Loading in 2 Seconds...

play fullscreen
1 / 16

TMCI threshold in 2007 and horizontal instability - PowerPoint PPT Presentation


  • 88 Views
  • Uploaded on

TMCI threshold in 2007 and horizontal instability. September 18, 2007 B. Salvant. With the help of G. Arduini, R. Calaga, E. Métral, G. Rumolo, R. Tomas, G. Papotti. Agenda. Context Measurements MD on August 2 nd 2007 MD on August 27 th 2007 What to do next?. Context.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about ' TMCI threshold in 2007 and horizontal instability ' - auryon


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
tmci threshold in 2007 and horizontal instability

TMCI threshold in 2007 and horizontal instability

September 18, 2007

B. Salvant

With the help of G. Arduini, R. Calaga, E. Métral, G. Rumolo, R. Tomas, G. Papotti

agenda
Agenda
  • Context
  • Measurements
    • MD on August 2nd 2007
    • MD on August 27th 2007
  • What to do next?
context
Context
  • Measurements revealed a longitudinal Impedance higher than expected for the SPS (E. Shaposhnikova APC 03/08/2007).
  • The SPS transverse impedance measurements do not show a significant increase (H. Burkhardt APC 17/08/2007).
  • A short MD on 27/08/2007 (G. Arduini et al) showed unstable behaviour in the horizontal plane.
  • Questions to be addressed:
    • Is the TMCI threshold the same as in 2006?
    • Can we give an explanation for this unstable behaviour in the horizontal plane?
agenda1
Agenda
  • Context
  • Measurements
    • MD on August 2nd 2007
    • MD on August 27th 2007
  • What to do next?
md on august 2 nd 2007 1 2
MD on August, 2nd 2007 (1/2)
  • Participants : OP team, T. Bohl, R. Calaga, G. Papotti, G. Rumolo, B. Salvant, R. Tomas
  • Objectives : Can we see vertical modes shifting and coupling as beam current increases? Reproduce theoretical and simulation studies.

Headtail Simulations

md on august 2 nd 2007 2 2
MD on August, 2nd 2007 (2/2)
  • Settings :
    • Beam current [1 1010 1.3 1011]p/b
    • Low chromaticity in the vertical plane (-0.2-0.25), high chromaticity in the horizontal plane
    • RF Voltage very high at injection (3 MV instead of 700 kV in 2006)
    • Observation of the beam behaviour mainly with SPS Qmeter and Faraday Cage Transverse BPM after kicking in the vertical plane, about 900 ms after injection
  • Conclusion
    • Except for 30 minutes at the end of the MD, very different measurements and conditions than 2006
    • Comparison is risky

Measurements

agenda2
Agenda
  • Context
  • Measurements
    • MD on August 2nd 2007
    • MD on August 27th 2007
  • What to do next?
md on august 27 th 2007 1 2
MD on August, 27th 2007 (1/2)
  • Participants : OP team, G. Arduini, E. Benedetto, E. Métral (parasitic measurements)
  • Objectives : Compare TMCI threshold in 2007 with 2006.

Measurements in 2003 (vertical)

md on august 27 th 2007 2 2
MD on August, 27th 2007 (2/2)

Measurements in 2006 (vertical)

md on august 27 th 2007 3 3
MD on August, 27th 2007 (3/3)

Measurements in 2007 (horizontal)

md on august 27 th 2007 4 3
MD on August, 27th 2007 (4/3)

Measurements in 2007 (current)

md on august 27 th 2007 5 3
MD on August, 27th 2007 (5/3)

Measurements in 2007 (BPM V)

Measurements in 2007 (BPM H)

md on august 27 th 2007 6 3
MD on August, 27th 2007 (6/3)

Measurements in 2007 (Sussix frequency analysis BPM H)

agenda3
Agenda
  • Context
  • Measurements
    • MD on August 2nd 2007
    • MD on August 27th 2007
  • What to do next?
what to do next
What to do next?
  • Not far enough in the analysis to conclude  massive amount of data to be analyzed and compared with previous years
  • However longitudinal motion affects the transverse motion
  • Instability in 2006 ?
ad