1 / 5

工作進度

工作進度. 2004/08/23 張峯榮. 電機系黃光. 2004 年 08 月 17,18 日 黃光 ︰CPW Substrate︰GaAs Cleaning︰TCE→ACE→Methanol→DI-Water Spin︰AZ1500 , step1﹕7000 rpm , 5 sec step2︰6500 rpm , 40 sec Baking︰80℃ 2min Exposure︰6.5 sec ( OAI-500 ) Development︰AZ300 20sec

aurek
Download Presentation

工作進度

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 工作進度 2004/08/23 張峯榮

  2. 電機系黃光 • 2004年08月17,18日 • 黃光︰CPW • Substrate︰GaAs • Cleaning︰TCE→ACE→Methanol→DI-Water • Spin︰AZ1500 , step1﹕7000 rpm , 5 sec step2︰6500 rpm , 40 sec • Baking︰80℃ 2min • Exposure︰6.5 sec ( OAI-500 ) • Development︰AZ300 20sec • Ti (700A) / Au (800A)

  3. CPW

  4. E-Beam測試 • 2004年08月18,19日 • Substrate︰GaAs • Cleaning︰TCE→ACE→Methanol→DI-Water • Spin︰PMMA 4% , step1﹕5000 rpm , 5 sec step2︰5000 rpm , 25 sec • Baking︰156℃,15min • Exposure︰140μC/cm2 • Development︰(MIBK/IPA) ,75Sec (IPA) ,35Sec • Ti (100A) / Au (300A)

  5. E-Beam測試 • 2004年08月18,19日 • Substrate︰GaAs • Cleaning︰TCE→ACE→Methanol→DI-Water • Spin︰PMMA 4% , step1﹕5000 rpm , 5 sec step2︰5000 rpm , 25 sec • Baking︰156℃,15min • Exposure︰130μC/cm2 • Development︰(MIBK/IPA) ,75Sec (IPA) ,35Sec • Al (250A)

More Related