1 / 15

GPETE Standardization

GPETE Standardization. Greg Hogan NSWC Corona Det Seal Beach. Overview. Standardization Method. Assess SCAT/ Model Allowance/Inventory Footprint and Prime System(s) Application AIF Assess Current Prime System Category I & II Measurement Requirements PSR

aulii
Download Presentation

GPETE Standardization

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GPETE Standardization Greg Hogan NSWC Corona Det Seal Beach

  2. Overview Standardization Method • Assess SCAT/Model Allowance/Inventory Footprint and Prime System(s) ApplicationAIF • Assess Current Prime System Category I & II Measurement RequirementsPSR • Develop/Update Consolidated Multiple Prime System SCAT Measurement Footprint Minimize/Optimize GPETE Inventory around Reliable Maintainable SCAT Measurement Technology • Develop/Update NAVSEASCAT Performance & Lifecycle Support Requirements Specification • Develop budget and forward Requirement Specification to NAVICP contracts for implementation Next

  3. Allowance & Inventory Footprint Organized by Class Prime Systems Navigation ECM Communication RADAR CGN Prime System Ship Ship 1 Ship 2 Ship 3    Ship n System 1    System 2    System n    CG/DDG CV/CVN/LHD/LHA Back

  4. Prime System Requirements Prime System 1 Prime System 2 Prime System n ISEA Responses Prime System Measurement Parameter Meas 1 (Volts) Meas 2 (Acc) Meas 3 (Res)    Meas n System 1 850 Vdc 4 % < 3.4 V    System 2 795 Vdc 5 % < 4 V    System n 815 Vdc 10 % < 8.2 V    Back

  5. Composite Prime Systems A, B, & C Measurement Requirements NAVSEA Measurement Requirements SCAT Measurement Foot Print & Required Model Performance Prime System A Prime System C Prime System B Back

  6. Coordination and Application Fleet Input Input Support Contractors Evaluation PS Acquisition Programs Categorize Measurement Requirements Individual Systems Group Multiple Systems TYCOMS & FLEET REPS Develop Measurement Disciplines RMC Subject Matter Experts RMC Calibration Centers PS ISEAs

  7. Teaming with Industry • Sharing technical requirements with Industry promotes competition • Ensure same requirements are provided to all interested vendors • “Industry Days” • Ethical, fair and in best interest of the Navy • Coordinate with NAVICP to ensure industry equipment candidates are compliant with NAVSEA requirement

  8. NAVSEA Measurement Requirements • Identifies necessary Prime System Measurements needed for SCAT Definition • Identifies necessary Life Cycle Logistics Elements needed for SCAT Life of Type Support • Reflects military standards (MIL-PRF-28800) • Establishes a baseline reference for next generation instrumentation

  9. Functional Groups • Ph • Phase Sequence • Audio Analyzer • Sound Level • Termination • Data Acquisition • Modulator • Adapter • Coupler • Detector • Divider • Filter • Conductivity • Earth Ground • Echo Box • Isolator • Battery Analyzer • PCB Test • Impedance • Signal Generator • Digital Multimeters • Baseband Generator • Synchro Resolver • Spectrum Analyzer • Calibrator • Logic Analyzer • Oscilloscope • Voltmeter • Frequency • LAN/WAN • Telcomm Analyzer • Power Supply • Bit Error Rate Tester • Comm Analyzer • Recorder • Insulation Breakdown • Power Analyzer • Component Test • Impedance Matcher • Field Strength • Noise • Radar Test Set • Modulation Analyzer • Probe • Power Meter • Attenuator • Fiber Optics • Distortion • Data Analyzer • Electrical Safety • Network Analyzer • Resistor • Scalar Analyzer • Photo Tachometer • Resistance • Capacitor • Amplifier • Humidity • Dummy Load • Temperature • Transformer • Time/Freq-Domain • Reflectometry • Vibration • Oxygen • Switch • Potentiometer • Mixer • Power Limiter • Antenna • Inductor • Torque • Earth Ground • Signature Analyzer • Teletype • Monitor

  10. Work Effort/Work Initiatives • Process • Past 5 years • Reduced SCATs & Models • Next 5 years • Target Functional Groups for SCAT/Model reduction

  11. Analysis Process • Decision considerations • Review Obsolescence SCAT codes • Review of failure data • Review of calibration periodicity • Consolidation of SCAT requirements • Functional Group Analysis

  12. Standardization Efforts

  13. Next 5 Year Candidates • Target candidates: • Power Meters • Meggers • Time Domain Reflectometer • Spectrum Analyzers • Data System Analyzers

  14. Candidate Information • Requesting Fleet Input at this time for other prospective candidates

  15. Questions Greg Hogan Gregory.hogan@navy.mil Phone: 562-626-7192 DSN: 873

More Related