Design-Build Lessons Learned. 2009 Raleigh Seminar – December 17. National Bridge Inventory. Over 150,000 bridges structurally deficient or functionally obsolete ≈ 3,000 added annually Over 130,000 bridges currently recommended for replacement - $70B+

aubrie
Download Presentation

Design-Build Lessons Learned

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Design-Build Lessons Learned 2009 Raleigh Seminar – December 17

  2. National Bridge Inventory • Over 150,000 bridges structurally deficient or functionally obsolete • ≈ 3,000 added annually • Over 130,000 bridges currently recommended for replacement - $70B+ • Approximately ¼ of the US Inventory needs rehab or replacement

  3. Design-Build / PPP Experience • California: SR 125 • Open to traffic Fall 2007 • Milwaukee: 6th Street • Open to traffic • North Carolina: US 17 Washington Bypass • Under construction • Calgary: Ring Road • Under construction • Edmonton: Ring Road • Under construction • Virginia: Gayton Road • 80% design

  4. Design-Build / PPP Experience • Florida: I-595 PPP • Win • Virginia: Hwy 460 • Short listed, RFP stage • Texas: North Tarrant • Negotiating contract • Texas: NTTA SH161 • Negotiating contract • Texas: Trans-Texas Corridor (TTC-35) • Hwy 130; Design in progress • Pennsylvania: Turnpike • Team selected, project dropped

  5. Any change, even a change for the better, is always accompanied by drawbacks and discomforts Arnold Bennett

  6. Innovative Contracting Fast-Track Construction • Design-Build & PPP • Cost + time strategies • Risk Assessment • Partnering • Quality Control / Assurance • Innovation

  7. Advantages of Design / Build • Enhanced Constructability • Design development coupled with the Contractor’s “over-the-shoulder” review • Development of “means & methods” that match the Contractor’s past experience, ability, and available equipment • Delivery of large, complex, schedule-driven projects faster • Contractor’s enhanced control over schedule (at-risk option) • Allows the Owner and D/B Team to react to unforeseen obstacles by making adjustments prior to 100% design completion

  8. Good Candidates for D/B • Projects that can have a well defined scope for all parties • Projects with low risk of unforeseen conditions - with low possibility for significant change during all phases of work. • Projects that have room for innovation in the design and/or construction effort. • Projects with well-defined, non-complex environmental permitting requirements. • Projects that require minimum right of way acquisition and utility relocation. • Projects that demand an expedited schedule and can be completed earlier.

  9. Poor Candidates for D/B • Urban construction/reconstruction with major utilities, major subsoil problems, major R/W requirements, complex environmental permitting requirements, or other major unknowns. • Major bridge rehab/repair with significant unknowns • Rehabilitation of movable bridges

  10. Innovative Financing Advanced Project Scheduling and Estimating Techniques • Expanded use of electronic project scheduling, estimating tools • Cost sharing strategies • Tolling mechanisms • Contractor financing • Leveraging techniques • Credit assistance • Cost management & containment concepts

  11. Ensuring Success – Advice for Owner • Do your homework. . . • Well prepared RFQ/RFP • Clear, concise, project-specific – not a “cut & paste” • Define evaluation factors and weighting criteria • Share Information • Provide surveys, geotechnical, and environmental data up front • Understand project costs - realistic budget • Don’t expect D/B bids to be lower than those of projects using traditional design-bid-build process. • Expect a normal number of change orders, although the resulting cost may be lower as details may be reworked prior to 100% plans • Plan for a reasonable contingency.

  12. Ensuring Success – Advice for Owner • Do your homework (con’t) . . . • Clear scope of work expectations • Poorly defined – overly defined • Only get what you include? • Assemble your best team • Experienced Personnel • Adequate Manpower • Must get comfortable with a less “hands-on control” approach • Less formal design oversight and reviews by Owner • D/B Team designer is “Engineer of Record” • Be flexible and responsive (time is money)

  13. Ensuring Success – “Hands Off” • Innovation • Alternate Technical Concepts • Take advantage of designer-contractor working together to develop economic/efficient designs • Earthwork • Constructability (traffic control) • Bridge design features • Alternative materials • Proven means/methods from other states • Don’t be more committed to established processes, procedures, or individual agendas than to the overall success of the project. • Performance based vs. standard prescriptive specifications • Realize that there are different interpretations

  14. Ensuring Success – Commitment • Technical Proposal • Considered a “Book of Promises”, i.e., deviations require consequences • Do not include “flowery” or “non-descriptive” commitments • Owner should seek clarification during Q&A • Innovation does not typically include revisions to AASHTO criteria or Owner specifications and policies. • Perception is designers are “designing on the edge” • Reason for non-acceptance other than “That’s not how we normally do it” • Performance based specifications

  15. Ensuring Success • Partnering • Make it real, not an exercise (Ownership) • Well- defined communication process • Quick resolution with decisions made at the lowest possible level • “Corporate “ buy-in to on-site commitments • Escalation ladder • Include 3rd party stakeholders early • Whether stakeholders or not, uncommitted or uninterested third parties can damage a project through their actions or inactions • Trust • Open & honest communication • Takes time (starts Day 1)

  16. Managing Risk • Assign “Risk” responsibility to appropriate stakeholder that can best manage the risk • Avoid pass-through costs • Major price component in contractor’s bid (contingencies – consider cost allowances) • Typical risk items • Governmental – potential for delays, modifications, withdrawals, scope changes, or additions from multi-level Federal State and local participation and sponsorship • Regulatory – RR, environmental permits, 3rd parties • Construction – reliance on reference drawings, differing site conditions, hazardous material remediation, interim drainage, traffic control, public access, weather, etc. • R/W and utilities – unknown costs, time delays, condemnation • Post-construction – public liability, meeting stipulated performance standards

  17. Managing Quality • Clear, detailed QC/QA program by Owner • Required approvals (all parties) • Inspection should be consistent with traditional delivery projects (don’t expect perfection) • Contractor performs inspection, sampling, and testing • Contractor CEI? – too many layers • Owner or independent inspection and verification • Clean slate every day • Consider the cost-effectiveness of warranties or operation requirements - consideration of life-cycle costs • Independent “Peer Review” for major project components • DOCUMENTATION • Document all actions and decisions

  18. Designer Specific Concerns • Proposal costs – stipends • Conflict of Interest • Pre-RFP work for the Owner • Compensation from both the Owner & Contractor, i.e., CEI and design • Level of design • 10% to 15% for Proposal effort • Best value determination • Selection should include quality component • Bidding of professional services • Owner requirement for team commitment

  19. Designer Specific Concerns • Quantity Risk • Limitation of liability • Consequential damages • Contractor initiated changes • RFIs versus plans modifications • Dispute resolution • DRBs • Back charges versus Retainage Be proactive not reactive

  20. Questions?