TTCN-3 Status Report

TTCN-3 Status Report. STF380 Team. TTCN-3 Maintenance in 2009. STF 380: March 2009 – Dec. 2009 (118 days) Members: Gyorgy Rethy, Ericsson Tibor Csondes, Ericsson Jens Grabowski, University of Goettingen Ina Schieferdecker, FOKUS Two TTCN-3 „Releases“

ashleyk
Download Presentation

TTCN-3 Status Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TTCN-3 Status Report STF380 Team

  2. TTCN-3 Maintenance in 2009 • STF 380: March 2009 – Dec. 2009 (118 days) • Members: • Gyorgy Rethy, Ericsson • Tibor Csondes, Ericsson • Jens Grabowski, University of Goettingen • Ina Schieferdecker, FOKUS • Two TTCN-3 „Releases“ • TTCN-3 v4.2.1 interim version as an 3GPP/LTE maintenance update in summer • TTCN-3 extension by end of 2009 STF 380 Report at MTS#50

  3. STF 380 tasks • Resolution of open CRs • Cooperation with STF 160 on LTE testing • Extensions for real-time and performance • Real-time concepts and semantics • Timing constraints • Support for simulated time • Support for performance tests and benchmarks • Reference test suite (voluntary, based on inputs from tool vendors) STF 380 Report at MTS#50

  4. TTCN-3 v4.2.1 Interim version • Contains • (201 873-1) RES/MTS-00107-1: Core Language • Addressed mainly 3GPP/LTE CRs according to review meeting on June 3, 2009 • http://docbox.etsi.org/MTS/MTS/05-Meetings/200909-MTS49/49TD13r3_Final_Minutes_of_the_TTCN-3_CR_resolution_meeting.doc • 23 CRs implemented, 1 CR rejected • Basis for TTCN-3 v4.2.1 STF 380 Report at MTS#50

  5. TTCN-3 v4.2.1 • Contains • RES/MTS-00111-1 TTCN-3 Core Language • RES/MTS-00111-4 TTCN-3 Operational Semantics • RES/MTS-00111-5 TTCN-3 Runtime Interfaces • RES/MTS-00111-6 TTCN-3 Control Interfaces • RES/MTS-00111-7 TTCN-3 and the Use of ASN.1 • RES/MTS-00111-8 The IDL to TTCN-3 Mapping • RES/MTS-00111-9 Using XML schema with TTCN-3 • RES/MTS-00111-10 TTCN-3 Documentation Tags • DES/MTS-00112 TTCN-3: Static Test Configuration & Deployment • DES/MTS-00113 TTCN-3: Performance Testing Concepts • DES/MTS-00114 TTCN-3: Real-Time Concepts • DTR/MTS-00115 TTCN-3 Reference Test Suite • Has addressed appr. 100 CRs • Completed in Febr. 2010, to be approved at #MTS50 STF 380 Report at MTS#50

  6. Status of v4.2.1 • majority of CRs discussed, resolutions in preparation • real-time concepts implemented • performance concepts as part of real-time and static configuration concepts • methodology for reference test suite development developed • example ICS, TSS, and test cases documented • selected CRs moved to v5.1.1 STF 380 Report at MTS#50

  7. Status of Extension Packages • Approved • Advanced types • Advanced paramterization • For approval • Configuration and Deployment Support • Real-Time Concepts STF 380 Report at MTS#50

  8. Upcoming Maintenance STF session • March 23-26, Göttingen • Please report your issues as CRs in Mantis beforehand • http://t-ort.etsi.org STF 380 Report at MTS#50

  9. MTS Discussion • Evaluation of CRs • Prioritzation • Selection • Timing • Continuation of Reference Test Suite • Full development requires complete STF STF 380 Report at MTS#50