1 / 21

Investment capacity of building materials industry and perspectives of investment cooperation

Investment capacity of building materials industry and perspectives of investment cooperation. JSC “ Uzbuildingmaterials ”. Tashkent , 25-April 2013. The share of civil works in GDP. Dynamics of volume building materials production. 2.

ashanti
Download Presentation

Investment capacity of building materials industry and perspectives of investment cooperation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Investment capacity of building materials industry and perspectives of investment cooperation JSC “Uzbuildingmaterials” Tashkent, 25-April 2013

  2. The share of civil worksin GDP Dynamics of volume building materials production 2

  3. Growth rates of indicators in the investment sphere(in the comparable prices in % to previous year) 3

  4. SUCCESSFUL PROJECTS “Organization of ceramic tiles at JV“PENG SHENG” Cost of project – 20 mln. USD Project capacity – 4,0 mln.sq.m Beginning of production – in 2010. Location – Sirdarya region Foreign investor – “Wenzhou Jinsheng Trade Co., Ltd” (China)

  5. “Organization of production Dry Mix” Cost of project – 1.5 mln. USD Project capacity - 48000 tons Beginning of production – in 2010. “Organization of production gypsum board” Cost of project – 51.5 mln. USD Project capacity – 20 mln.sq.m Beginning of production – in 2011. Location – Bukhara region Foreign investor – “KNAUF” (Germany) SUCCESSFUL PROJECTS 5

  6. successful PROJECTS “Construction of cement grinding station for processing of the clinker of production JSC Bekabadcement” Cost of project – 33,2 mln. USD Project capacity – 1 mln.tons Location - Yangiyuldistrict, Tashkent region “Construction of the new line production of cement clinker by dry way at JSC “Bekabadcement” Cost of project – 63,0 mln. USD Project capacity – 0,85 mln.tons Location - Bekabaddistrict, Tashkent region Beginning ofproduction – in 2013 Foreign investor – “Caspian recourses Ltd”

  7. COOPERATION Wenzhou Jinsheng Trade Co., Ltd V&B Chemical Co Ltd 7

  8. INVESTMENT OFFERS in the sphereof building material production 8

  9. “PRODUCTION OF ARCHITECTURAL GLASS” • Annual capacity- 600 tones per day (18 millionsq.m,4mmcalc) • Cost of project-120 mln. USD • Payback period – 6 years • Target markets – Uzbekistan, • Central Asian countries and Afghanistan 9

  10. Marketstructure

  11. FLAT GLASS MARKET OF UZBEKISTAN • Production in Uzbekistan: • 2 producers (Kvartz and Gazalkent plants) • about 6 mln.sq.m per year • country is the biggest regional glass producer with strong domestic market and expansion opportunities • Imports: • above 5 mln.sq.m year • imports have doubled in past 5 years • Market size: • more than 12 mln.sq.min 2012 (excluding uncovered demand) • including up to 3 mln.sq.m for automotive industry • by 2016 consumption of flat glass in Uzbekistan will increase to 18.5 mln.sq.m. • by 2020 consumption of flat glass in Uzbekistan will increase to 24.8 mln.sq.m. 11

  12. RAW MATERIALS 12

  13. “PRODUCTION OF PORCELAIN STONE WARE” • Annual capacity - 2mln.sq.m • Cost of project-16mln. USD • Location – SIZ “Jizzakh” • Payback period – 4 years • Target markets – Uzbekistan, • Central Asian countries and Afghanistan 13

  14. IMPORT AND DEMAND FOR PORCELAIN STONE WARE At present there is no porcelain stone ware plant with modernized production facilities in Central Asian countries • For the last 5 years import of porcelain stoneware in Uzbekistan was more than 1180 ths.sq.m • Demand for porcelain stone ware in the short term will make about 1,2 mln.sq.m per annum. 14

  15. The largest producersand importers

  16. RAW MATERIALS 16

  17. “PRODUCTION OF SANITARY WARE CERAMICS” • Annual capacity - 510 thsitems (toilet bowl, wash bowl, tanks, bidet, etc. ) • Cost of project-20 mln. USD • Location – SIZ “Jizzakh” • Payback period – 3,5 years • Target markets – Uzbekistan, • Central Asian countries and Afghanistan 17

  18. IMPORT AND DEMAND FOR SANITARY WARE At present, there are sanitary ware plant with modernized production facilities in CIS countriesThe volume of import to Uzbekistan 2009 – 140 000 items 2010 – 205 000items 2011 – 228000 items 2012 – 337 000 items 18

  19. RAW MATERIALS 19

  20. “PRODUCTION OF ITEMS FROM NATURAL STONES (MARBLE)” • Annual capacity - 30 ths.sq.m • Cost of project–2 mln. USD • Location – SIZ “Jizzakh” • Payback period – 4 years • Export markets – Central Asian countries and Afghanistan 20

  21. Thanks for attention! JSC “Uzbuildingmaterials” Contacts:www.uzsm.uzchairman@uzsm.uzuzbuild@ars.uzТеl: +99871 2522063/5Fax: +99871 2557707 21