Si tracker r d for lhcb upgrade
This presentation is the property of its rightful owner.
Sponsored Links
1 / 6

Si tracker R&D for LHCb Upgrade PowerPoint PPT Presentation


  • 130 Views
  • Uploaded on
  • Presentation posted in: General

Si tracker R&D for LHCb Upgrade . Some introductory notes Marina Artuso. The work for LOI. Studies focused on the requirement of “intermediate tracking system” between VELO and outer tracker. R&D work may apply to IT rebuild if Si option is chosen

Download Presentation

Si tracker R&D for LHCb Upgrade

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Si tracker r d for lhcb upgrade

Si tracker R&D for LHCb Upgrade

Some introductory notes

Marina Artuso


The work for loi

The work for LOI

  • Studies focused on the requirement of “intermediate tracking system” between VELO and outer tracker.

  • R&D work may apply to IT rebuild if Si option is chosen

  • Alternative technique considered: scintillating fibers


The detector

The detector


Si tracker r d for lhcb upgrade

Our motivation was to identify a geometry that could optimize the intermediate tracking module (TT) to reduce the so called “ghost tracks”

For the LOI quick studyto be extended for the TDR

Parameters to be optimized segmentation, number of stations, location


Highlights of the silicon option

Highlights of the silicon option


Sensor and electronics

Sensor and electronics

Sensor to withstand ~ 5x1014 neq/cm2, nin n or n in p technology, changing segmentation depending upon strip location on the plane.

Back-end structure common to LHCb upgrade blocks/ synergy with VELO upgrade/strip option


  • Login