CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… PowerPoint PPT Presentation


  • 111 Views
  • Uploaded on
  • Presentation posted in: General

CREZ Transmission Optimization (CTO) Study And The Oscar Goes To…. Warren Lasher Manager, System Assessment. Designated Zones and Scenario Wind Levels. Study Approach. Develop a number of significantly different core concepts and test their performance

Download Presentation

CREZ Transmission Optimization (CTO) Study And The Oscar Goes To…

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Crez transmission optimization cto study and the oscar goes to l.jpg

CREZ Transmission Optimization (CTO) StudyAnd The Oscar Goes To…

Warren Lasher

Manager, System Assessment

RPG CREZ Meeting


Designated zones and scenario wind levels l.jpg

Designated Zones and Scenario Wind Levels

RPG CREZ Meeting


Study approach l.jpg

Study Approach

  • Develop a number of significantly different core concepts and test their performance

  • Variations on the concepts with best performance will be developed and tested

  • The best performing plan will be selected for the scenario

Significantly-Different Plans, e.g.

Scenario 2

Range of Potential Solutions

RPG CREZ Meeting


Concepts l.jpg

Concepts

High-level Concepts under study include:

  • Incremental 345-kV transmission system for wind in west Texas

  • Integrated 345-kV transmission system for wind in west Texas

  • Reduced number of right-of-ways using higher voltage circuits (500 kV or 765 kV)

  • Low impedance backbone or loop

  • HVDC circuit(s) to move power to load centers or between load centers, integrated with 345-kV upgrades

RPG CREZ Meeting


Recommended plan optimized for each scenario l.jpg

Recommended Plan Optimized for each Scenario

12 GW

18 GW

25 GW

24 GW

1

2

3

4

RPG CREZ Meeting


Staging and expansion l.jpg

Staging and Expansion

  • Will develop a preferred plan that is optimized for each of the four scenarios

  • Will provide expansion path of what elements in each of these plans should be built first if that Scenario is selected (except for Scenario 1)

    • Use lower scenarios as basis

  • Will develop an expansion path from the preferred plan for the lower scenarios, so as to allow for consideration of future expandability of those plans

    • Using next higher scenario as basis

RPG CREZ Meeting


Staging and expandability l.jpg

Staging and Expandability

12 GW

18 GW

25 GW

24 GW

1

1+

2

2+

2 -

3

3 -

3 - -

4

4 -

4 - -

RPG CREZ Meeting


Where we are l.jpg

Where We Are

  • Numerous plans have been developed, modified, improved, discarded, rethought, combined, pirated, and hybridized

  • Many plans have been evaluated using SCUC-ED model for wind curtailment and evaluated using AC contingency analysis

  • Final plans for scenarios 1 and 2 have been evaluated for dynamic stability

  • The report is almost complete

  • Maps are being emailed…

RPG CREZ Meeting


What have we learned l.jpg

What Have We Learned?

5,600 MW

2,600 MW

10,300 MW

DFW

HGA

SA

A primary consideration in the design of these plans has been the fact that the Dallas/Fort Worth area is the closest load center to much of the CREZ wind

Wind Capacity for Scenario 2 (CREZ wind and existing wind)

RPG CREZ Meeting


What have we learned10 l.jpg

What Have We Learned?

  • A fundamental question in this study:

    • What transmission plan is best suited to collect wind generation from scattered locations across much of west Texas, move it hundreds of miles to east Texas, and then redistribute the power-flows to load centers, utilizing available transmission capacity but without causing significant congestion on the existing transmission system?

  • Answer: It depends

    • On the distribution of wind resources

    • On the strength of the underlying system in West Texas

    • On the availability of strong connections to the existing system near load centers

RPG CREZ Meeting


A word of thanks l.jpg

A Word of Thanks

  • The planning team at ERCOT

  • Stakeholders who have participated in this process and the Wind Integration study

RPG CREZ Meeting


Slide12 l.jpg

Questions?


Certainty l.jpg

Certainty

12 GW

18 GW

25 GW

24 GW

  • Collection systems, transmission from west to east, and integration into eastern portion of grid are well defined

  • Recommended projects fit into plan for expansion to next level

  • All relevant studies have been completed

  • Transmission owners have agreed to feasibility of connections into existing facilities

  • Some minor changes may be necessary as result of routing analysis

1

1+

2

2+

2 -

3

3 -

3 - -

4

4 -

4 - -

RPG CREZ Meeting


Some additional study l.jpg

Some Additional Study

12 GW

18 GW

25 GW

24 GW

  • Collection systems and transmission from west to east are well defined

  • A viable, near-optimal plan for integration into eastern portion of grid has been identified

  • Further work and a few changes in endpoints may be necessary before finalizing integration into the eastern portion of the grid

    • Additional requirements to address feasibility of upgrades in east

    • Need to include consideration of other requirements in east

1

1+

2

2+

2 -

3

3 -

3 - -

4

4 -

4 - -

RPG CREZ Meeting


Flexibility l.jpg

Flexibility

12 GW

18 GW

25 GW

24 GW

  • Collection systems in the west are well defined

  • A viable plan for transmission from west to east and integration into eastern portion of grid has been identified, based on powerflow and stability

  • Additional work will be needed; number and positioning of west to east paths may change, as well as system upgrades in the eastern portion of the grid

1

1+

2

2+

2 -

3

3 -

3 - -

4

4 -

4 - -

RPG CREZ Meeting