An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Barrel PID summary K.Inami (Nagoya) Summary of R&D at Hawaii, Cincinnati, Ljubljana and Nagoya

  2. TOP conceptual design • Photon detector • Electronics • Quartz, mirror • Support structure • Detector design 2009/7/7-9 B2GM

  3. Photon detector R&D by Nagoya • Hamamatsu MCP-PMT (SL10) • Square-shape multi-anode • Multi-alkali photo-cathode • Gain=1.5x106 @B=1.5T • T.T.S.(single photon): ~35ps @B=1.5T • Position resolution: <5mm • Semi-mass-production (14 PMTs) QE [%] σ=34.2±0.4ps QE:24%@400nm TDC [1count/25ps] Wavelength [nm] TTS<40ps for all channels Ave. QE:17%@400nm 2009/7/7-9 B2GM

  4. QE at 400nm (XM0001) Preliminary result from HPK New Old Measured at Nagoya 1 B2year ~ 0.7C/cm2 Lifetime issue • Multi-alkali p.c. SL10 • Added many protection for gas and ion feedback  Improved lifetime • ex. JT0087 • Obtained normal Gain and TTS • Even with improved correction efficiency (~35%  ~60%) • Put Al protection layer on 2nd MCP • ex. XM0007 • Prototype performance is OK. • Enough gain: ~5x105 • Reasonable TTS: s=35~45ps • CE: ~55% 2009/7/7-9 B2GM

  5. Photonis PMT by Ljubljana from E-PID session • MCP-PMT • Model 85015/A1 • Bialkali photocathode • 10mm pore MCP • No Al protection layer • Gain~6x105 • TTS<~40ps • Started lifetime test • 200mC/cm2 • Signal yield; 10% drop? • To be checked 2009/7/7-9 B2GM

  6. Electronics status by Hawaii • Started to design front-end electronics for HPK SL10 • HV divider circuit • BLAB3 readout board  Detector design optimization 2009/7/7-9 B2GM

  7. Radiation hardness test • Put front-end ASIC, FPGA and fiber inside detector • Check radiation hardness • Put prototype board in KEKB tunnel and check FPGA reprogram rate and fiber link degradation • Started from May 17. • Ran fine through end of Exp.69 • Need to make conclusion 2009/7/7-9 B2GM

  8. Quartz bar, mirror by Cincinnati • Quality and performance of mirror and wedge • Produced by OSI at US • Test glues • NOA63; UV cure-type • Check with laser now. • Need to be check quality for real-size quartz components 2009/7/7-9 B2GM

  9. Support structure by Hawaii • Conceptual structure design • Check distortion of quartz radiator for several designs • Quartz supported by Honeycomb box • TOP module support (Discussing with KEK mechanics group) 2009/7/7-9 B2GM

  10. Design studies by Hawaii, Ljubljana, Nagoya • Check performance for several designs • With actual effects • MCP-PMT: QE, CE, TTS, dead space • Start timing fluctuation (25ps) • Cross-checked by several simulation programs • Geant3 based (Nagoya) • Geant4 based (Hawaii) • Analytical method (Ljubljana)  Almost ready for reconstruction code 2-bar fTOP • MCP-PMT photo-cathode • Multi-alkali • GaAsP 1-bar fTOP iTOP 2009/7/7-9 B2GM

  11. Performance check by Nagoya Multi-alkali, CE=60%, l>350nm Efficiency Fake rate 2009/7/7-9 B2GM

  12. Performance check by Hawaii • Generally performance better for 2-bar except forward part • Similar tendency with Nagoya’s result Multi-alkali 2009/7/7-9 B2GM

  13. Performance check by Ljubljana GaAsP • Similar with other programs • Need to make figures for multi-alkali photo-cathode 2009/7/7-9 B2GM

  14. Design study summary • 2-bar fTOP • Multi-alkali and GaAsP p.c. is OK for backward • Start time fluctuation (25ps) makes bad performance for forward • iTOP / 1-bar fTOP • GaAsP is OK • Multi-alkali p.c. makes slightly worse performance • Need more checks • Include actual effects • Start timing fluctuation, Incident angle fluctuation • Actual design of quartz and MCP-PMT • Performance for some physics cases • With fsim • With gsim4 and analysis code 2009/7/7-9 B2GM

  15. Cost estimate & Production time • Quartz • 16~18 modules (2x40x91.5cm3 x3 + mirror, wedge) • Okamoto optics (fTOP case) • 1800x18+2700万円 ~ 3.6M$, 2 years • Zygo/OSI • Zygo quartz bar 3.5~4.1M$, 1~1.5 years • OSI mirror and wedge 0.84+0.71M$, 0.5years • MCP-PMT • Hamamatsu; 600 pieces for 2-bar TOP, 3 years • Multi-alkali photo-cathode; ~2.7M$ • GaAsP photo-cathode; ~4.2M$ • Photonis; 600 pieces for iTOP, 3 years?? • Bi-alkali photo-cathode; 3~6M$??  to be checked 2009/7/7-9 B2GM

  16. Cost estimate & Production time • Electronics • SL10 basis, frontend+backend+HV divider • 2-side readout ~0.5M$ • Without NRE, COPPER, BLAB3 ASIC • Structure • To be estimated. 2009/7/7-9 B2GM

  17. Schedule toward 2013 2009/7/7-9 B2GM

  18. Schedule toward technology choice • By the end of August • Make list of possible options • In our case, MCP-PMT choice is important. • Make performance catalogue for • MCP-PMTs • QE, CE, TTS, Gain, Lifetime, • Detector configuration • Separation power (eff./fake) • Robustness (beam BG, T0, tracking, photon loss) • By the end of December • Decide detector configuration and technology • Show test results • MCP-PMT lifetime, Simulation study, electronics test To be Checked by internal review committee? 2009/7/7-9 B2GM

  19. Summary • MCP-PMT • Hamamatsu SL10(Multi-alkali p.c., 28(22)x28(22)mm2, 4ch or 4x4ch) • Photons 850xx(Bi-alkali p.c., 59(52)x59(52)mm2, 8x8ch) • Both performance is OK. • Need a few month to confirm lifetime • Electronics • SL10 base production is in progress • Radiation hardness test done.  To be confirmed. • BLAB3 ASIC fabrication in autumn • Quartz • Zygo/OSI products are tested now. • Design study, Structure study • Need to check possible configuration with actual effects • We will discuss in detail at PID meeting at Nagoya in next week. 2009/7/7-9 B2GM