a co wildcat battalion training meeting
Download
Skip this Video
Download Presentation
A Co. WILDCAT BATTALION TRAINING MEETING

Loading in 2 Seconds...

play fullscreen
1 / 40

A Co. - PowerPoint PPT Presentation


  • 305 Views
  • Uploaded on

28 SEP 04. A Co. WILDCAT BATTALION TRAINING MEETING. S-2 Brief Review 3-Month Calendar Review Last Weeks Training Wk IV: Training Focus and Guidance Wk III: Decision Brief Wk II: Information Brief Wk I: Pre-Execution Checks Wk 0: Pre-Execution Checks LDP Final Remarks. AGENDA.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'A Co.' - arleen


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
agenda
S-2 Brief

Review 3-Month Calendar

Review Last Weeks Training

Wk IV: Training Focus and Guidance

Wk III: Decision Brief

Wk II: Information Brief

Wk I: Pre-Execution Checks

Wk 0: Pre-Execution Checks

LDP

Final Remarks

AGENDA
s 2 briefing
S-2 BRIEFING

CDT/CPT Phillips

slide4
News
  • - Insurgents attack Iraqi National Guardsmen in Mosul, and near Fallujah, and Baquba.
  • U.N. sends hundreds of peacekeepers to Haiti following Hurricane Jeanne which left at least 1,500 dead and 200,000 homeless.
weather
Weather

40 Percent chance of rain on Thursday

slide11
Land Navigation

CDT/CPT Gardiner

AAR
improves
1) Time

2) Know what points look like

3) Construction (site interference)

IMPROVES
mission
A CO Wildcat BN conducts M16A2 zero on 21OCT04 at 1300 HRS at Wasatch Shooter’s Association Range to train cadets on basic rifle marksmanship and prepare them for qualification.Mission
training objectives
Task: Conduct M16A2 zero LLAB

Conditions: During daylight hours under range officer supervision

Standards: Successfully zero one M16A2

Training Objectives
concept of operation
All participants will meet at the east side of the Dee Events Center in the parking lot on 21OCT04 NLT 1250 HRS for the M16A2 zero LLAB.Concept of Operation
tasks to subordinate units
Supply/S4:Water, M-16A1s, ammunition, ear plugs, zero targets

Combat Lifesaver:CPT Faletto,

MSG Whitmore

Tasks to Subordinate Units
risk management
Step 1: Identify Hazards: Dehydration, weapon malfunctions, unsafe weapon handling, civilians on a service road above the range

Step 2: Assess Hazards: E H M L

Step 3: Make Risk Assessment: Low

Step 4: Implement Countermeasures: Water on site, SPORTS instruction, staying alert, range officers on site, combat lifesaver on site, contact with the local Sheriff

Risk Management
coordinating instructions
Uniform:BDUs, soft cap

Equipment:LBE with gloves, two canteens, ruck with weather

dependant gear, ballistic helmet

Environmental Considerations:

Possible cold or wet weather

Coordinating Instructions
service and support
Supply:water, M16A1s, ammunition, targets

Transportation:POV, Bus

Medical Evacuation:Davis Medical Center

(801) 825-9561

Service and Support
command and signal
Identity/Planned Location of Lab OIC:

CDT/CPT Phillips on site

MSG Whitmore (628-5979)

Identity/Planned Location of Senior Cadre member:

LTC Sturgeon (589-1986), on site

FM Radio Freq/Channel:

6/09

Command and Signal
milestones27
Milestones

15 SEP 04 TRANS DEC MSG Whitmore GREEN

20 SEP 04 Equipment Supply SGT Moore AMBER

21 SEP 04 AI’s SS10 MS IV’s GREEN

22 SEP 04 Recon LLAB Site MSG W,Roberts GREEN

wk i pre execution checks30
Transportation - HILL AFB Bus GREEN

Equipment - LBE, Kevlar GREEN

Area of Operation - Top of 9th Street GREEN

Contingency Plan - In case of inclement GREEN weather, LLAB will

be cancelled

Wk I: Pre-ExecutionChecks
wk 0 pre execution checks33
Wk 0: Pre-Execution Checks

Transportation – POV’s/ WSU Shuttle

Equipment – LBE with two canteens of water, ruck sack with cold and wet weather gear

Area of Operation –Dee Event Center NW Parking Lot

Contingency Plan – Cadets will form in the Swenson Gym with Gym shoes available

current evaluators 20 sep to 1 oct 2004
CURRENT EVALUATORS:20 SEP to 1 OCT 2004

PositionEvaluatorMSIII Cadet

CO CDT Stevens CDT Barnes

1ST SGT CDT Valleta CDT Stuart

PL CDT Roberts CDT Eldredge

PSG CDT Tuttle CDT Davis

1 SL CDT Seegmiller CDT Alburo

2 SL CPT Faletto CDT Meservey

3 SL MSG Bryan CDT Teeples

upcoming evaluators 4 oct to 15 oct 2004
UPCOMING EVALUATORS:4 OCT to 15 OCT 2004

PositionEvaluatorMSIII Cadet

CO CDT Fisher, M. CDT Redd

1ST SGT CDT Mair CDT Heber

PL MSG Whitmore CDT Pugmire

PSG LTC Stuart CDT Bensen

1 SL CDT Carver CDT Bolliger

2 SL LTC Sturgeon CDT Geib

3 SL CDT Carpenter CDT Scholte

evaluation events 29 sep 2004
EVALUATION EVENTS: 29 SEP 2004

EventCOEvaluator1SGEvaluator

BN OPORD CDT Redd CDT Fisher, M. CDT Heber CDT Mair

cards due wednesday 6 oct 2004
Cards Due Wednesday6 OCT 2004

CDT Stevens

CDT Valleta

CDT Roberts

CDT Tuttle

CDT Seegmiller

CPT Faletto

MSG Bryan

ad