Maintenance and Accelerator Support. RHIC run10. Wednesday May 5 th :. Short maintenance this time around RHIC: Tunnel areas opened at *0800. Delays to some areas doe to increased HP survey activity. NOT ALL AREAS OPENED Berm access and power outages limited

Download Presentation

Maintenance and Accelerator Support

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Maintenance and accelerator support

Maintenance and Accelerator Support

RHIC run10


Wednesday may 5 th

Wednesday May 5th:

  • Short maintenance this time around

  • RHIC:

    • Tunnel areas opened at *0800. Delays to some areas doe to increased HP survey activity.

    • NOT ALL AREAS OPENED

    • Berm access and power outages limited

  • AGS controlled access for specific jobs only.

  • LINAC and Booster remain running for NSRL


Major jobs

Major jobs:

  • RHIC:

    • Maintenance items only at this time.

    • LL timing effort continues

  • AGS:

    • Polarimeter C15 continued work

    • Controlled access only


Scheduling meeting

Scheduling Meeting

  • Next week, here after time meeting.

  • Attendance by ALL groups performing work essential for continued success.

  • Those needing access must attend to avoid missing access windows.


Schedule

Schedule

0800hrs AGS CA LOTO Application

Experiments to XA

HP Surveys at beam dumps, collimators etc.

0830hrsRHIC RA in select areas ONLY

0930hrsAccess AGS through South gate.

Survey for RA

1400hrsBegin RHIC RF checkout (RF to RFNA mode)

Begin RHIC MMPS restoration

1500hrsSecure AGS, remove LOTO

Sweep Experimenter IRs

1600hrsBegin physics restoration