Niigataken Chuetsu-oki Earthquake and its Influences on the Kashiwazaki-Kariwa NPP. Kashiwazaki-Kariwa NPP. Niigata city. Epicenter. Summary of the Earthquake and Situation of the Kashiwazaki-Kariwa NPP. Summary of the Earthquake Occurrence: July 16, 2007 at 10:13 am JST Earthquake Source:

Download Presentation

Niigataken Chuetsu-oki Earthquake and its Influences on the Kashiwazaki-Kariwa NPP

An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -

Presentation Transcript


Niigataken chuetsu oki earthquake and its influences on the kashiwazaki kariwa npp

Niigataken Chuetsu-oki Earthquake and its Influences on the Kashiwazaki-Kariwa NPP


Summary of the earthquake and situation of the kashiwazaki kariwa npp

Kashiwazaki-Kariwa NPP

Niigata city

Epicenter

Summary of the Earthquake andSituation of the Kashiwazaki-Kariwa NPP

  • Summary of the Earthquake

    • Occurrence: July 16, 2007 at 10:13 am JST

    • Earthquake Source:

      • 17km below the seabed off Jo-chuetsu area in Niigata prefecture (37°33.4′North、138°36.5′East)

      • Epicenter Distance: 16km from the NPP

    • Magnitude: 6.8

  • Situation of the NPP

    • When the earthquake occurred:

      • Unit 2 was in start-up

      • Unit 3, 4 and 7 were in normal operation

      • Unit 1, 5 and 6 were out of operation for the periodic inspections

    • Units 2, 3, 4 and 7 were automatically shut down following the high seismic acceleration trip signals


Influences of the earthquake on the npp

Influences of the Earthquake on the NPP

  • Inspections have been performed from just after the earthquake, and the followings are found up to August 10.

    • Incidents found in visual inspections (69 incidents)

      • Incidents related to radioactive materials (15 incidents)

        • Leakage of water including radioactive materials into non-controlled area in the reactor building (Unit 6)

        • Flooding on the operating floor in the reactor building (Unit 1~7)

        • Leakage of water into B5 floor of the reactor combination building (Unit 1)

        • Displacement of the main exhaust duct (Unit 1~5)

        • Detection of radioactive materials in the main exhaust duct (Unit 7) etc

      • Incidents not related to radioactive materials (54 incidents)

        • Fire on the house transformer B (Unit 3)

        • Deviations from LCO (Unit 1~3)

        • Fall of the service platform into the spent fuel pool (Unit 1, 4)

        • Fall down of drums (Solid waste storage warehouse) etc

    • Incident found in detailed inspections

      • Damage found on the coupling of the drive axis of the reactor building overhead crane (Unit 6)


Main incidents found in inspections

Leakage of water including

radioactive materials into

non-controlled area in

the reactor building (Unit 6)

Fire on the house transformer B (Unit 3)

Motor

Motor

Damaged

Damage found on the coupling of the drive axis

of the reactor building overhead crane (Unit 6)

Displacement of the main exhaust duct (Unit 3)

Main Incidents found in Inspections


Main incidents found in inspections cont

Reactor Combination Building

Break of Fire

Extinguishing Pipe

Pene

B1 Floor

Water Flow-in

Duct

B2 Floor

B3 Floor

B4 Floor

B5 Floor

Leakage of water into B5 floor of

the reactor combination building (Unit 1)

Fall down of drums (Solid waste storage warehouse)

Sump

Main Incidents found in Inspections (cont)

Reactor Building

Building Ventilation

Still Working

after Plant Shutdown

Turbine

Building

Unit 7

Main Exhaust

Duct

Monitoring

House

Main Exhaust Duct

Filter

Reactor

Turbine Gland

Steam Exhauster

Turbine

Condenser

Filter

Rare Gas Hold

-up Equipment

Detection of radioactive materials in the main exhaust duct resulting from loss of the steam seal inside the turbine (Unit 7)


The iaea mission to the npp

The IAEA Mission to the NPP

  • The objectives were to conduct a fact finding mission in relation to the current conditions at the nuclear power plant and to identify the preliminary lessons learned from the event.

    • Mission Date: August 6 to 10, 2007

    • Location: Kashiwazaki-Kariwa NPP and NISA Headquarter etc

    • IAEA Review Team: Team Leader (Mr. Philippe Jamet, Director of the Division of Nuclear Installation Safety) and 5 international experts


Outlines of the iaea mission report

Outlines of the IAEA Mission Report

  • Based on the report release dated August 17 on the IAEA HP, main findings and lessons learned are as follows:

    • Operating plants were automatically shutdown and all plants behaved in a safe manner, during and after the earthquake. The three fundamental safety functions of (a) reactivity control, (b) removal of heat from the core and (c) confinement of radioactive materials were ensured.

    • Very minor radioactive releases to the environment were estimated to result in an individual dose well below the authorized limits.

    • Safety related structures, systems and components seem to be in a general condition much better than expected for such a strong earthquake. This is probably due to the conservatisms introduced at different stages of the design process.

    • In accordance with the new seismic guidelines, a re-evaluation of the seismic safety needs to be done taking into account the effects of the Niigataken Chuetsu-oki earthquake and the potential existence of active faults underneath the site.

    • The possibility that a component remains functionally available under normal operating conditions but sustains hidden damage, should be considered.


How to advance future

How to Advance Future

  • "The Subcommittee for Investigation and Response to the Nuclear Facilities affected by Chuetsu-oki Earthquake" have been established as shown below.

  • The subcommittee investigates the facts regarding the concrete influence of the earthquake on the NPP, and determines future action assignments and measures for the regulatory body and licensees.

The Nuclear and Industrial Safety Subcommittee

The Advisory Committee for Natural Resource and Energy

(existing)

(existing)

The Seismic and Structural

Design Subcommittee

The Subcommittee for Investigation and Response to the Nuclear Facilities affected by Chuetsu-okiEarthquake

The Nuclear Emergency Preparedness Subcommittee

report

advice

report

WG for the Evaluation of Management and Equipment Integrality (Tentative name )

WG for Self-Defense Fire Fighting and Information Connection/ Service of the Nuclear Facilities affected by Chuetsu-oki Earthquake (Tentative name )


  • Login